Home / Browse projects / Bengaluru Urban, Karnataka / SHASHANK AKSHADHA

Registration approved No litigation declared Residential/Group Housing project

SHASHANK AKSHADHA

By SHASHANK INFRA PROJECTS

RG-KA-18401 · RERA PRM/KA/RERA/1251/309/PR/190722/005088 · Last updated on RERA Karnataka portal: 15 Jul 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 86 documents Report an error

SHASHANK AKSHADHA is a Residential/Group Housing project by SHASHANK INFRA PROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/190722/005088 on 19 Jul 2022. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NameSHASHANK AKSHADHA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/190722/005088
  • ReraGenie IDRG-KA-18401

Builder

  • NameSHASHANK INFRA PROJECTS
  • Entity typePartnership Firm
  • GSTIN29AEOFS3436G1ZM
  • Authorized SignatoryM RAMESH

Key dates

this monthRegisteredJul 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Jul 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHASHANK AKSHADHA---1200120

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Jul 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 15 Jul 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Ramesh--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 17.41 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 17.41 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHANDRA SHEKAR K A
EngineerSuma
Chartered AccountantB C Kodhandaram

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed86

As listed on the registration, under the names the promoter filed them with; the newest 80 of 86 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/190722/005088 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
1 EC from 1-5-2005 to 7-7-202215 Jul 2022
Clarification on sale Deed shashank construction to shashank Infra ProjectsFile: 2 Clarification on sale Deed shashank construction to shashank Infra Projects.pdf15 Jul 2022
Partnership DeedFile: 3 Partnership Deed.pdf15 Jul 2022
Supplementary deed of PartitionFile: 4 Supplementary deed of Partition.pdf15 Jul 2022
MR Sy No 2File: 5 MR Sy No 2.pdf15 Jul 2022
Mortgage DeedFile: 6 Mortgage Deed.pdf15 Jul 2022
Legal OpinionFile: 7 Legal Opinion.pdf15 Jul 2022
Guidance value- AkshadhaFile: 8 Guidance value- Akshadha.pdf15 Jul 2022
Clarification on E KhataFile: 9 Clarification on E Khata.pdf15 Jul 2022
Architect COAFile: 10 Architect COA.pdf15 Jul 2022
CLARIFICATION FOR NON PRODUCTION OF SINGLE LAYOUTFile: 11 CLARIFICATION FOR NON PRODUCTION OF SINGLE LAYOUT.pdf15 Jul 2022
Clarification on KSPCB NOC Built up Area vs Approved PlanFile: 12 Clarification on KSPCB NOC Built up Area vs Approved Plan.pdf15 Jul 2022
CDP mapFile: 13 CDP map.pdf15 Jul 2022
Village map -AgraharaFile: 14 Village map -Agrahara.pdf15 Jul 2022
Clarification on Commencement CertificateFile: 15 Clarification on Commencement Certificate.pdf15 Jul 2022
Project SpecificationFile: 16 Project Specification.pdf15 Jul 2022
BWSSB -Fee paid receiptFile: 17 BWSSB -Fee paid receipt.pdf15 Jul 2022
STP drawingFile: 18 STP drawing.pdf15 Jul 2022
STP LocationFile: 19 STP Location.pdf15 Jul 2022
Brochure-ClarificationFile: 20 Brochure-Clarification.pdf15 Jul 2022
sold -unsold clarificationFile: 21 sold -unsold clarification.pdf15 Jul 2022
Proforma AGREEMENT of saleFile: 22 AKSHADHA AGREEMENT DRAFT.pdf15 Jul 2022
23 Allotment Letter15 Jul 2022
RTC, survey 2-
Mutation, survey 2-
Encumbrance Certificate, survey 2-
Conversion/Alienation Order, survey 2-
Sale/Title/Gift Deed, survey 2-
Khatha, survey 2-
Registration CertificateFile: Firm Registration Certificate.pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1.pdf-
Certificate issued by Architect Form 2File: Form 2.pdf-
Certificate issued by Engineer Form 3File: Form 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit for Non-Litigation Details-without JD pdf.pdf-
Certificate from Chartered AccountFile: Form 1.pdf-
BBMP building licence-
BESCOM NOC-
BWSSB NOC-
Approved Plan-
Approved Plan-
Approved Plan-
7 Elevation and Section Plan-
Approved Plan-
Affidavit FORM B-
Notarized Affidavit for 3(1) Voilation-
BESCOM NOC-
BWSSB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
1 Site Plan-
2 Basement Floor-
3 Ground floor-
4 First Floor Plan-
5 Typical 2nd 3rd & 4th Floor-
6 Terrace Floor-
7 Elevation and Section Plan-
Loan raised documentFile: Shashank infra.pdf-
Occupancy CertificateFile: BBMP.jpeg-
Consent for operation issued by KSPCBFile: CFO- KSPCB.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Bescom Energisation certificate.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHASHANK AKSHADHA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SHASHANK INFRA PROJECTS

SHASHANK INFRA PROJECTS has 1 registration on RERA Karnataka, including SHASHANK AKSHADHA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHASHANK AKSHADHA is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHASHANK AKSHADHA?

The registered promoter entity is SHASHANK INFRA PROJECTS, a partnership firm as per the filing. Its GSTIN 29AEOFS3436G1ZM can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHASHANK AKSHADHA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHASHANK AKSHADHA?

The professionals named in the filing: Architect: CHANDRA SHEKAR K A; Engineer: Suma; Chartered Accountant: B C Kodhandaram. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHASHANK AKSHADHA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHASHANK AKSHADHA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHASHANK AKSHADHA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.