Home / Browse projects / Bengaluru Urban, Karnataka / SHAMATHA HILLS
SHAMATHA HILLS
RG-KA-61929 · RERA PRM/KA/RERA/1251/310/PR/270125/007447 · Last updated on RERA Karnataka portal: 6 Aug 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SHAMATHA HILLS is a Residential/Group Housing project by S G DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/270125/007447 on 27 Jan 2025. Possession is promised by 31 Dec 2027. 1 of the 16 units on this registration are recorded sold or booked, and 7 of 18 construction stages are filed complete.
At a glance
Project
- NameSHAMATHA HILLS
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/270125/007447
- ReraGenie IDRG-KA-61929
Builder
- NameS G DEVELOPERS
- Entity typePartnership Firm
- GSTIN29ADHFS4146F1ZW
- Authorized SignatorySATHEESH REDDY P
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Jan 2025
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed103 files
Current status
Figures as on 6 Aug 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER | - | - | - | 16 | 0 | 16 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 18 construction stages are filed complete. The stage furthest along is Plastering inside, at 93%.
Building: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 93% |
| Joinery: Doors, Windows, Ventilators etc | 70% |
| Basic work of Water supply, Sanitary and Electrification | 40% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 50% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 85% |
| Lifts | Yes | 85% |
| Corridor/Lobbies | Yes | 82% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 65% |
| Terrace | Yes | 65% |
| Outer Wall | Yes | 82% |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 65% |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Geetha Ramu | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 6.97 cr | Rs 5.99 cr |
| Administrative Costs | Rs 12.00 lakh | - |
| Payment of taxes | Rs 10.00 lakh | Rs 4.61 lakh |
| On-site expenditure-Consultants Fees | Rs 5.00 lakh | Rs 11.70 lakh |
Certifying professionals and partners4
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Srimathi J Adiga |
| Engineer | Prashanth Kumar L |
| Engineer | Patnala Ramakrishna |
| Chartered Accountant | M Krishna kumari |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed103
As listed on the registration, under the names the promoter filed them with; the newest 80 of 103 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/270125/007447 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Cert - RERAQ4.pdf | 6 Aug 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Arc Cert - Mar 26.pdf | 6 Aug 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Eng cert - Mar 26.pdf | 6 Aug 2026 |
| Q4 2025-26 Water supply and sewage board | 6 Aug 2026 |
| Q4 2025-26 KPTCL- BESCOM | 6 Aug 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Quarterly Chartered Accountant Certificate.pdf | 19 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form5,Q3,2025-26,Shamatha Hills.pdf | 19 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 Eng cert.pdf | 19 Feb 2026 |
| Engineer LicenseFile: 1 Engineer License.pdf | 23 Jan 2025 |
| Form 3 Engineer Certificate - Shamatha HillsFile: 3 Form 3 Engineer Certificate - Shamatha Hills.pdf | 23 Jan 2025 |
| Form 6 Engineer Certificate - Shamatha HillsFile: 4 Form 6 Engineer Certificate - Shamatha Hills.pdf | 23 Jan 2025 |
| Clarification on STPFile: 5 Clarification on STP.pdf | 23 Jan 2025 |
| Land Cost calculation sheetFile: 6 Land Cost calculation sheet.pdf | 23 Jan 2025 |
| RTC LatestFile: 1 RTC Latest.pdf | 13 Jan 2025 |
| Conversion OrderFile: 2 Conversion Order.pdf | 13 Jan 2025 |
| Sale deed 26-03-2004 Site No 49File: 3 Sale deed 26-03-2004 Site No 49.pdf | 13 Jan 2025 |
| Sale deed 26 03 04 Site No 50File: 4 Sale deed 26 03 04 Site No 50.pdf | 13 Jan 2025 |
| Sale deed 26-03-04 Site No 48File: 5 Sale deed 26-03-04 Site No 48.pdf | 13 Jan 2025 |
| JDA AffidavitFile: 6 JDA Affidavit.pdf | 13 Jan 2025 |
| Form-B AffidavitFile: 7 Form-B Affidavit.pdf | 13 Jan 2025 |
| Non-Litigation AffidavitFile: 8 Non-Litigation Affidavit.pdf | 13 Jan 2025 |
| Sec 3(1) Non-voilation AffidavitFile: 9 Sec 3(1) Non-voilation Affidavit.pdf | 13 Jan 2025 |
| Bank Account AffidavitFile: 10 Bank Account Affidavit.pdf | 13 Jan 2025 |
| BBMP Approved Building planFile: 1 BBMP Approved Building plan.pdf | 13 Jan 2025 |
| BBMP LicenseFile: 2 BBMP License.pdf | 13 Jan 2025 |
| Commencement CertificateFile: 3 Commencement Certificate.pdf | 13 Jan 2025 |
| Clarification on KSPCB NOCFile: 4 Clarification on KSPCB NOC.pdf | 13 Jan 2025 |
| Village Map DemarcationFile: 5 Village Map Demarcation.pdf | 13 Jan 2025 |
| Old Survey SketchFile: 6 Old Survey Sketch.pdf | 13 Jan 2025 |
| Form-6 Engineer CertificateFile: 7 Form-6 Engineer Certificate.pdf | 13 Jan 2025 |
| Proforma Agreement of SaleFile: 10 Proforma Agreement of Sale.pdf | 13 Jan 2025 |
| BWSSB NOC self-attestedFile: 11 BWSSB NOC self-attested.pdf | 13 Jan 2025 |
| RR Nagar CDP DemarcationFile: 12 RR Nagar CDP Demarcation.pdf | 13 Jan 2025 |
| Common Area and AmenitiesFile: 8 Common Area and Amenities.pdf | 13 Jan 2025 |
| Old MR Hissa Sy SketchFile: 11 Old MR Hissa Sy Sketch.pdf | 13 Jan 2025 |
| Legal Title DocumentFile: 13 Legal Title Document.pdf | 13 Jan 2025 |
| Sale deed 13 12 89File: 14 Sale deed 13 12 89.pdf | 13 Jan 2025 |
| Khata Amalgamation deedFile: 12 Khata Amalgamation deed.pdf | 13 Jan 2025 |
| Registration CertificateFile: Firm Registration Cert.pdf | - |
| GST CertificateFile: GST Certificate.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1 CA Cert.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate - Shamatha Hills.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Engineer | - |
| Project ArchitectFile: CA/98.23892 | - |
| AffidavitFile: Non-Litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form 1 CA Cert.pdf | - |
| Balance Sheet 2023 - 2024File: Financials FY 2023-24 with DUIN.pdf | - |
| Balance Sheet 2022 - 2023File: FY 2022-23 Financials.pdf | - |
| Balance Sheet 2021 - 2022File: FY 2021-22 Financials.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: Financials FY 2023-24 with DUIN.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: FY 2022-23 Financials.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: FY 2021-22 Financials.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: Financials FY 2023-24 with DUIN.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: SGD ITR 2023.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: SGD ITR 2022.pdf | - |
| BBMP License | - |
| BBMP Approved Building plan | - |
| BBMP Approved Building plan | - |
| Stability Certificate | - |
| Project Specification | - |
| Unnamed document | - |
| Proforma AFS | - |
| Proforma Allotment Letter | - |
| Form-B Affidavit | - |
| Sec 3(1) Affidavit | - |
| JDA Affidavit | - |
| Legal report | - |
| BESCOM NOC | - |
| BWSSB NOC with Fees receipt | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SHAMATHA HILLS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: S G DEVELOPERS
S G DEVELOPERS has 2 registrations on RERA Karnataka, including VANYA PALACE and SHAMATHA HILLS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SHAMATHA HILLS is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SHAMATHA HILLS?
The registered promoter entity is S G DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29ADHFS4146F1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SHAMATHA HILLS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SHAMATHA HILLS?
The professionals named in the filing: Architect: Srimathi J Adiga; Engineer: Prashanth Kumar L; Engineer: Patnala Ramakrishna; Chartered Accountant: M Krishna kumari. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHAMATHA HILLS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback