Registration approved Residential/Group Housing project

SHAKTI SPRINGS

By Shakti Homes

RG-KA-63109 · RERA PRM/KA/RERA/1251/310/PR/190215/002378 · Last updated on RERA Karnataka portal: 21 Jun 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2023Possession promisedmoved 21 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 73 documents Report an error

SHAKTI SPRINGS is a Residential/Group Housing project by Shakti Homes in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190215/002378 on 15 Feb 2019. Possession is promised by 30 Mar 2023. The completion date has moved by 21 months from the original filing.

At a glance

Project

  • NameSHAKTI SPRINGS
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/190215/002378
  • ReraGenie IDRG-KA-63109

Builder

  • NameShakti Homes
  • Entity typePartnership Firm
  • Authorized SignatoryMUKESH KUMAR DEVGADE

Key dates

this monthRegisteredFeb 2019First promiseJun 2021Revised toMar 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Feb 2019
  • Promised completion30 Mar 2023
  • Revised completionRevised to 30 Mar 2023 (originally 30 Jun 2021)
  • Buildings24 building records
  • Documents filed73 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---101
2---101
3---101
4---101
5---101
6---101
7---101
8---101
9---101
10---101
11---101
12---101
13---101
14---101
15---101
16---101
17---101
18---101
19---101
20---101
21---101
22---101
23---101
24---101

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 21 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolNoNot applicable
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,210 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 12.27 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectyukti constultants
EngineerNR ASSOCIATES

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2021 → Mar 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/220902/002378Mar 2022 → Mar 2023

Reason as filed by the promoterForce Majeure; Shortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed73

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190215/002378 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
DELAY REASONFile: (1) Delay reason.pdf21 Jun 2022
EX1File: (1A) form Ex - 1.pdf21 Jun 2022
EX-2File: (1B) form Ex - 2.pdf21 Jun 2022
COA NO.File: (1C) BBMP RC - Shivakumar- Architect.pdf21 Jun 2022
AREA DETAILSFile: Area details.pdf21 Jun 2022
COST DETAILSFile: (2) Cost Details.pdf21 Jun 2022
LIST OF ALLOTTEESFile: (3) list of allottees.pdf21 Jun 2022
AFFIDAVITFile: (4) Afidavit.pdf21 Jun 2022
DEVELOPMENT DETAILSFile: (5) Row House wise work complition.pdf21 Jun 2022
STRUCTURAL SAFTYFile: (6) structural stability certificate.pdf21 Jun 2022
PREFORMA OF AGREEMENT OF SALEFile: (7) Draft copy of Sale Agreement.pdf21 Jun 2022
CONTRACTORS DETAILSFile: (8) Self Declaration Regarding Project Contractors.pdf21 Jun 2022
PROJECT LOCATIONFile: (9) Location Latitude and longitude.pdf21 Jun 2022
NOCFile: (10) NOC KPTCL & BESCOM.pdf21 Jun 2022
EC-SEARCH REPORTFile: (11) Advocate search report.jpg21 Jun 2022
STP DEMARCATION SITE PLANFile: (12) STP - Demarcation site plan.jpg21 Jun 2022
STP DESIGN DRAWINGFile: (12A) STP - Design Drawing.pdf21 Jun 2022
PROJECT SPECIFICATIONSFile: (13) Project Specification.pdf21 Jun 2022
PROJECT MEMBER DETAILSFile: (14) Project Member Details.pdf21 Jun 2022
CertificateFile: Shakti homes Firm Registration.pdf-
Architect Certificate for Work Completion Schedule till DateFile: form-Ex1 Project Extension.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: form- Ex 5 Project Extension.pdf-
CA Certificate for Funds UtilizationFile: Fund Utilized Certificate.PDF-
Architect Certificate for Pending Work Completion Schedule.File: From-Ex2 Project Extension.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: form- Ex 6 Project Extension.pdf-
CA Certificate for Funds required for Project CompletionFile: Fund Requirement Certificate.PDF-
AffidavitFile: form Ex -7.pdf-
Latest Encumbrance CertificateFile: EC.jpg-
Consent letter from 2/3rd of AllotteesFile: Consent -1 (4 files merged).pdf-
Details Of Sold/ Un-sold UnitsFile: Shakti Springs-Sold - UnSold Units.pdf-
Document 1File: form B .pdf-
page-
Sactioned Plan-
Sactioned Plan-
page-
page-
Partition Deed-
Sactioned Plan-
Sactioned Plan-
page-
e-brochure 1-
NOC - KSPCB-
page-
EC _ 01-04-1940 to 06-06-2018 -
Shakti Homes - Affidavit-
Khatha & Extract-
JDA Rectification-
Conversion -
NOC - KSPCB-
Sactioned Plan-
e-brochure 1-
page-
Balance Sheet 2017 - 2018File: BS 2018.pdf-
Balance Sheet 2016 - 2017File: BS 2017.pdf-
Balance Sheet 2015 - 2016File: B S- 2016.pdf-
Audited Profit and Loss Statement 2017 - 2018File: P& L 2018.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P & L 2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L 2016.pdf-
Director's Report 2017 - 2018File: page.pdf-
Director's Report 2016 - 2017File: page.pdf-
Director's Report 2015 - 2016File: page.pdf-
Cash Flow Statement 2017 - 2018File: page.pdf-
Cash Flow Statement 2016 - 2017File: page.pdf-
Auditor's Report 2017 - 2018File: page.pdf-
Auditor's Report 2016 - 2017File: page.pdf-
Auditor's Report 2015 - 2016File: page.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 5 - Acknowledgement - AY 2018-19.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 5 - Acknowledgement - AY 2017-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 5 - Acknowledgement - AY 2016-17.pdf-
Form - B - Declaration --
Prospectus/BrochureFile: Shakti Springs - Brochure.pdf-
Advertisement Copy 1File: IMG-20190713-WA0004.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190215_002378.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHAKTI SPRINGS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Shakti Homes

Shakti Homes has 1 registration on RERA Karnataka, including SHAKTI SPRINGS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHAKTI SPRINGS is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHAKTI SPRINGS?

The registered promoter entity is Shakti Homes, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHAKTI SPRINGS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHAKTI SPRINGS?

The professionals named in the filing: Architect: yukti constultants; Engineer: NR ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAKTI SPRINGS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAKTI SPRINGS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAKTI SPRINGS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.