Home / Browse projects / Nashik, Maharashtra / SHAHS RENUKA ENCLAVE

Completed No litigation declared Residential / Group Housing project

SHAHS RENUKA ENCLAVE

By SHAH BUILDERS AND DEVELOPERS

RG-MH-95346 · RERA P51600016183 · Last updated on MahaRERA portal: 8 Oct 2020

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SHAHS RENUKA ENCLAVE is a Residential / Group Housing project by SHAH BUILDERS AND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600016183 on 20 Apr 2018. The registration is recorded completed; possession was promised by 9 Mar 2022.

At a glance

Project

  • NameSHAHS RENUKA ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • REST CAMP ROAD
    • KASAR MALA
    • Deolali (CB)
    • Nashik
    • 422502
  • Pincode422502
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600016183
  • ReraGenie IDRG-MH-95346

Builder

  • NameSHAH BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersMAHENDRA KANKUCHAND SHAH, SHRUTI ATISH SHAH
  • Other registrations11 more →
  • Completed10 of 12
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredApr 2018PromisedMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on20 Apr 2018
  • Promised completion9 Mar 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROW HOUSENA20000
BUILDING BNA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

ROW HOUSE64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed17

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots17
Closed/Covered17
BuildingClosed/CoveredTotal
ROW HOUSE1111
BUILDING B66

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,540 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
SACHIN SURESH THAKREDeolali (CB)Nashik
BALKRISHNA BHIKAJI THAKRENashikNashik

Approvals and building plan

Permissible FSI1268.0
Proposed, not sanctioned1,268 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDATTA MANDIR NASHIK ROAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNITIN SALVE
PartnerRole in project
SHAH BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Jan 2020

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shah Builders and developers Renuka Enclave.pdf8 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shah Builders and developers Land owner Renuka Enclave.pdf8 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sunil Patel Q4 Eng.pdf27 Aug 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-1-4.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-5-8.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-9-12-1-2.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-9-12-3-4.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-13-16.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-17-20.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-21-24.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-21-24.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-25-28.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-25-28.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-29-32.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-33-36-1-2.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-33-36-3-4.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-37-40.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-41-44.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-41-44.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-45-48.pdf19 Mar 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Decaleration Deed-49-50.pdf19 Mar 2020
PAN CardFile: PAN CARD.pdf2 Mar 2020
Certificates of CA (Form 3)File: CA Certificate-1-3.pdf2 Mar 2020
Certificates of CA (Form 3)File: CA Certificate-4-6.pdf2 Mar 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf6 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engier Certificate.pdf6 Feb 2020
Architect’s Certificate on Completion of Project (Form 4)File: From No 4.pdf6 Feb 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Comletion Certificate.pdf30 Jan 2020
Certificates of CA (Form 3)File: CA Certifiaate_compressed.pdf11 Jan 2020
Certificates of CA (Form 3)File: 300618_compressed.pdf30 Dec 2019
Certificates of CA (Form 3)File: C A Certificate 300918.pdf30 Dec 2019
Certificates of CA (Form 3)File: C A Certificate 31122018.pdf30 Dec 2019
Certificates of CA (Form 3)File: C A Certificate 31032019.pdf30 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf23 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf23 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engieers Certificate.pdf23 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engieers Certificate.pdf23 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compliation Certificate.pdf23 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: From No 4 Building.pdf23 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: download.pdf9 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaditya Graphics Q1 Archi.pdf28 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaditya Graphics Q2 Arch.pdf28 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaditya Graphics Q3 Arch.pdf28 Nov 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aaditya Graphics Q4 Arch.pdf28 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sunil Patel Q1 Eng.pdf28 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sunil Patil Q2 Eng.pdf28 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sunil Patel Q3 Eng.pdf28 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sunil Patel Q3 Eng.pdf28 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: Rera Audit.pdf24 Oct 2019
Building plan approvalFile: Declaration of Rera file.pdf17 Apr 2018
Building Plan Approval (IOD)File: Declaration of Rera file.pdf17 Apr 2018
OtherFile: Declaration of Rera file.pdf17 Apr 2018
Building plan approvalFile: download (1).pdf16 Apr 2018
Building plan approvalFile: download (3).pdf16 Apr 2018
Building plan approvalFile: download.pdf16 Apr 2018
Building Plan Approval (IOD)File: download (1).pdf16 Apr 2018
Building Plan Approval (IOD)File: download (3).pdf16 Apr 2018
Building Plan Approval (IOD)File: download.pdf16 Apr 2018
Layout approvalFile: layout.pdf4 Apr 2018
Copy of the legal title reportFile: 1.pdf4 Apr 2018
Copy of the legal title reportFile: 2.pdf4 Apr 2018
Copy of the legal title reportFile: 3.pdf4 Apr 2018
Copy of the legal title reportFile: 4.pdf4 Apr 2018
Copy of Layout Approval (in case of layout)File: layout.pdf4 Apr 2018
Proforma of Allotment letterFile: allotment letters.pdf4 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: Commesment.pdf3 Apr 2018
Certificates of CA (Form 3)File: shah builders1 to 3.pdf3 Apr 2018
Certificates of CA (Form 3)File: shah builders 4 to 5.pdf3 Apr 2018
Details of encumbrancesFile: Declaration.pdf22 Mar 2018
Declaration in FORM BFile: shah builder afdidavit-01082016043805-ilovepdf-compressed.pdf22 Mar 2018

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHAHS SAI RAM RESIDENCYBANACHAL REST ROAD DEOLALI6CompletedAug 2015Late, Jan 2016
SHAHS GARDEN RESIDENCY PHASE INEAR SAINIK SOCIETY VIJAY NAGAR DEOALI CAPM104CompletedJan 2015Late, May 2015
SHAHS GARDEN ESTATEVIJAY NAGAR BHAGUR DEOLALI CAMP NASHIK91CompletedDec 2014Late, Oct 2015
SHAHS SAI RESIDENCYLAM ROAD DEOLALI CAMP28CompletedMay 2014Late, Oct 2015

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAHS RENUKA ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASAR MALA4,100+ in Nashik

2 kmSHAHS RENUKA ENCLAVECompleted 4Lapsed / revoked 3Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: SHAH BUILDERS AND DEVELOPERS

SHAH BUILDERS AND DEVELOPERS has 12 registrations on MahaRERA, including SHAHS GARDEN RESIDENCY PHASE II and SHAH GOVIND APARTMENT PHASE II. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHAHS RENUKA ENCLAVE is delayed beyond 9 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAHS RENUKA ENCLAVE?

The registered promoter entity is SHAH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAHS RENUKA ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAHS RENUKA ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAHS RENUKA ENCLAVE?

The professionals named in the filing: Architect: NITIN SALVE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAHS RENUKA ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAHS RENUKA ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAHS RENUKA ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.