Home / Browse projects / Nashik, Maharashtra / SHAHS GARDEN RESIDENCY PHASE II
SHAHS GARDEN RESIDENCY PHASE II
By SHAH BUILDERS AND DEVELOPERS
RG-MH-00744 · RERA P51600001356 · Last updated on MahaRERA portal: 8 Oct 2020
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHAHS GARDEN RESIDENCY PHASE II is a Residential / Group Housing project by SHAH BUILDERS AND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600001356 on 27 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2021.
At a glance
Project
- NameSHAHS GARDEN RESIDENCY PHASE II
- TypeResidential / Group Housing
- Location
- Bhagur Rural
- Nashik
- 422502
- Pincode422502
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600001356
- ReraGenie IDRG-MH-00744
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on27 Jul 2017
- Promised completion30 Dec 2021
- Revised completionNone
- Buildings7 building records
- Documents filed68 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLOCK I | NA | 2 | 0 | 0 | 0 | 0 |
| BLOCK L | NA | 2 | 0 | 0 | 0 | 0 |
| BLOCK M | NA | 2 | 0 | 0 | 0 | 0 |
| BLOCK N | NA | 2 | 0 | 0 | 0 | 0 |
| BLOCK Q | NA | 3 | 0 | 0 | 0 | 0 |
| BLOCK R | NA | 3 | 0 | 0 | 0 | 0 |
| BLOCK X | NA | 1 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 8 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
47 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Podiums (if any), at 0%.
BLOCK I64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLOCK L64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLOCK M64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLOCK N64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLOCK Q64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLOCK R64%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BLOCK X45%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed49
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| BLOCK I | 9 | 9 |
| BLOCK L | 9 | 9 |
| BLOCK M | 9 | 9 |
| BLOCK N | 9 | 9 |
| BLOCK Q | 4 | 4 |
| BLOCK R | 4 | 4 |
| BLOCK X | 5 | 5 |
Land and ownership5
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| POPATLAL PANCHARIA SHAH | Mumbai City | Mumbai City |
| RAMESH POPATLAL NANDU | Mumbai City | Mumbai City |
| SUNIL CHMPSHI FURIA | Mumbai City | Mumbai City |
| RAMESHCHANDRA KARSANDAS BISCUITWALA | Mumbai City | Mumbai City |
| ASHOK POPATLAL NANDU | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MUKUL SUDHIR PATIL |
| Engineer | SUNIL HARIBHAI PATEL |
| Partner | Role in project |
|---|---|
| SHAH BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 24 Feb 2020
Documents filed68
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shah Builders and developers Garden residency.pdf | 8 Oct 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Garden Residency-1-24.pdf | 5 Mar 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Garden Residency-25-48.pdf | 5 Mar 2020 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Garden Residency-49-72.pdf | 5 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-1-5.pdf | 2 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-6-9.pdf | 2 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-1-5.pdf | 2 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-6-9.pdf | 2 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-1-5.pdf | 2 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-6-9.pdf | 2 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-1-5.pdf | 2 Mar 2020 |
| Certificates of CA (Form 3)File: CA Certificate-6-9.pdf | 2 Mar 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 24 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engieer Certificate.pdf | 24 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 24 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 24 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certificate.pdf | 24 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 24 Feb 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Audit Report 18-19.pdf | 24 Feb 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architech Certificate.pdf | 24 Feb 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion cer I.pdf | 24 Feb 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion cer N.pdf | 24 Feb 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion cer R and Q.pdf | 24 Feb 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion M and L.pdf | 24 Feb 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion X.pdf | 24 Feb 2020 |
| Certificates of Architect (Form 4)File: Architech Certificate.pdf | 24 Feb 2020 |
| Certificates of CA (Form 5)File: Ca Certificate Garden Residency.pdf | 30 Sep 2019 |
| Certificates of Architect (Form 4)File: Arcitech certificate I wing.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 4)File: completion cer I.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 4)File: Architech Certificate R and Q wing.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 4)File: completion cer R and Q.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 4)File: Architech Certificate M and L wing.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 4)File: completion M and L.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 4)File: Architech Certificate N wing.pdf | 25 Jul 2019 |
| Certificates of Architect (Form 4)File: completion cer N.pdf | 25 Jul 2019 |
| OtherFile: completion cer R and Q.pdf | 25 Jul 2019 |
| Certificates of CA (Form 5)File: C A certificate Garden Recidancy.PDF | 15 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-1-4.pdf | 6 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-5-9.pdf | 6 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 6 Oct 2018 |
| Certificates of CA (Form 3)File: CA Certificate-ilovepdf-compressed-1-4.pdf | 6 Oct 2018 |
| Certificates of CA (Form 3)File: CA Certificate-ilovepdf-compressed-5-9.pdf | 6 Oct 2018 |
| OtherFile: Garden Residency I Building.pdf | 3 Sep 2018 |
| OtherFile: Garden Residency L M Building.pdf | 3 Sep 2018 |
| OtherFile: Garden Residency N Building.pdf | 3 Sep 2018 |
| Building plan approvalFile: backside-05072015043548.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: backside-05072015043548.pdf | 26 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: Comencement certificate.PDF | 26 Jul 2017 |
| Proforma of Allotment letterFile: ALLOTMENT-LETTER.pdf | 26 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: garden residency engi certificte.PDF | 24 Jul 2017 |
| Certificates of CA (Form 3)File: CA certificate.PDF | 24 Jul 2017 |
| Proforma of Allotment letterFile: DRAFT (3).pdf | 23 Jul 2017 |
| Details of encumbrancesFile: garden residence.PDF | 22 Jul 2017 |
| Layout approvalFile: LAYOUT PLAN GARDEN RECI.pdf | 21 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN GARDEN RECI.pdf | 21 Jul 2017 |
| Declaration in FORM BFile: atish shah From B shah builders devl.PDF | 21 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect certificate.PDF | 20 Jul 2017 |
| Building plan approvalFile: 1.pdf | 19 Jul 2017 |
| Building plan approvalFile: 2.pdf | 19 Jul 2017 |
| Building plan approvalFile: 3.pdf | 19 Jul 2017 |
| Building plan approvalFile: 4.pdf | 19 Jul 2017 |
| PAN CardFile: PAN CARD SBD.pdf | 19 Jul 2017 |
| Copy of the legal title reportFile: title certificate-05072015042053.pdf | 19 Jul 2017 |
| Copy of the legal title reportFile: pavati-05072015041924.pdf | 19 Jul 2017 |
| Building Plan Approval (IOD)File: 1.pdf | 19 Jul 2017 |
| Building Plan Approval (IOD)File: 2.pdf | 19 Jul 2017 |
| Building Plan Approval (IOD)File: 3.pdf | 19 Jul 2017 |
| Building Plan Approval (IOD)File: 4.pdf | 19 Jul 2017 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHAHS SAI RAM RESIDENCY | BANACHAL REST ROAD DEOLALI | 6 | Completed | Aug 2015 | Late, Jan 2016 |
| SHAHS GARDEN RESIDENCY PHASE I | NEAR SAINIK SOCIETY VIJAY NAGAR DEOALI CAPM | 104 | Completed | Jan 2015 | Late, May 2015 |
| SHAHS GARDEN ESTATE | VIJAY NAGAR BHAGUR DEOLALI CAMP NASHIK | 91 | Completed | Dec 2014 | Late, Oct 2015 |
| SHAHS SAI RESIDENCY | LAM ROAD DEOLALI CAMP | 28 | Completed | May 2014 | Late, Oct 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 68 filed documents as one ZIP, foldered, with a manifest
Keep SHAHS GARDEN RESIDENCY PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhagur Rural4,100+ in Nashik
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
DEOLALI ONE
SHAH AND SHAH LAND DEVELOPERS
COZY NEST
KIRIT INFRASPACES
YAMUNA PARK
YAMUNA GREENS BUILDCON
Lila Heights
Yamuna Construction
ARKK PUSHP
ARKK INFRASTRUCTURE
ARKK PUSHP NX
AVIT BUILDERS & DEVELOPERS
See every Nashik project, with the district possession charts
Builder: SHAH BUILDERS AND DEVELOPERS
SHAH BUILDERS AND DEVELOPERS has 12 registrations on MahaRERA, including SHAHS GARDEN RESIDENCY PHASE II and SHAH GOVIND APARTMENT PHASE II. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHAHS GARDEN RESIDENCY PHASE II is delayed beyond 30 Dec 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHAHS GARDEN RESIDENCY PHASE II?
The registered promoter entity is SHAH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHAHS GARDEN RESIDENCY PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHAHS GARDEN RESIDENCY PHASE II?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHAHS GARDEN RESIDENCY PHASE II?
The professionals named in the filing: Architect: MUKUL SUDHIR PATIL; Engineer: SUNIL HARIBHAI PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHAHS GARDEN RESIDENCY PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.