ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / SHAHROOQ SHAH ALI KHAN PROJECT

Registration approved Residential/Group Housing project

SHAHROOQ SHAH ALI KHAN PROJECT

By SHAHROOQ SHAH ALI KHAN

RG-KA-37229 · RERA PRM/KA/RERA/1251/446/PR/171214/001897

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jun 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 62 documents Report an error

SHAHROOQ SHAH ALI KHAN PROJECT is a Residential/Group Housing project by SHAHROOQ SHAH ALI KHAN in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171214/001897 on 14 Dec 2017. Possession is promised by 16 Jun 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameSHAHROOQ SHAH ALI KHAN PROJECT
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/446/PR/171214/001897
  • ReraGenie IDRG-KA-37229

Builder

  • NameSHAHROOQ SHAH ALI KHAN

Key dates

this monthRegisteredDec 2017First promiseJun 2019Revised toJun 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Dec 2017
  • Promised completion16 Jun 2020
  • Revised completionRevised to 16 Jun 2020 (originally 16 Jun 2019)
  • Buildings1 building record
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
REGENCY FLAMINGO---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area862 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 7.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKabir Hira
EngineerPrasad Consultants

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/446/PR/220622/001897Jun 2019 → Jun 2020

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed62

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171214/001897 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect Certificate for Work Completion Schedule till DateFile: Architect work as on 14-6-19.PDF-
Engineer Certificate for Work Completion Schedule till DateFile: Eng work as on 14-6-19.PDF-
CA Certificate for Funds UtilizationFile: CA Certificate Funds utilised.PDF-
Architect Certificate for Pending Work Completion Schedule.File: Architect pending work 14-6-19.PDF-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Pending work 14-6-19.PDF-
CA Certificate for Funds required for Project CompletionFile: CA Certificate Funds required.PDF-
AffidavitFile: FORM-B 14-6-19.PDF-
Latest Encumbrance CertificateFile: EC .PDF-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
COMMENCEMENT CERTIFICATE-
Sanction Plan No1-
Sanction Plan No 2-
PROFORMA FOR SALE DEED-
SANCITON PLAN 2-
Millers Road Sale Deed-
Sanction Plan No 3-
Sanction Plan No1-
PROFORMA OF ALLOTMENT-
BROCHURE-
NOC N A-
PROJECT SPECIFICATION-
Benson Town EC 2017-
KHATA-
Millers Road Sale Deed-
Benson Town- conversion NA-
NOC FIRE FORCE-
NOC AIRPORT AUTHORITY-
NOC KSPCB-
NOC SEIAA-
NOC BSNL-
NOC BMRCL-
Balance Sheet 2015 - 2016File: BS 2016.pdf-
Balance Sheet 2014 - 2015File: BS 2015.pdf-
Balance Sheet 2013 - 2014File: BS 2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P &L 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P &L 2015.pdf-
Audited Profit and Loss Statement 2013 - 2014File: P&L 2014.pdf-
Director's Report 2015 - 2016File: DIRECTOR'S REPORT.pdf-
Director's Report 2014 - 2015File: DIRECTOR'S REPORT.pdf-
Director's Report 2013 - 2014File: DIRECTOR'S REPORT.pdf-
Cash Flow Statement 2015 - 2016File: FINANCIALS.pdf-
Cash Flow Statement 2014 - 2015File: FINANCIALS.pdf-
Auditor's Report 2015 - 2016File: AUDITOR'S REPORT.pdf-
Auditor's Report 2014 - 2015File: AUDITOR'S REPORT.pdf-
Auditor's Report 2013 - 2014File: AUDITOR'S REPORT.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR V - 2016-17.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: ITR V 2015-16.jpg-
Income Tax Return Acknowledgement 2013 - 2014File: ITR V 2014-15.jpg-
FORM B-
Prospectus/BrochureFile: BROCHURE.pdf-
Advertisement Copy 1File: ADVERTISEMENT COPY.doc-
Tower Excel SheetFile: CARPET AREA STATEMENT.xlsx-
Occupancy CertificateFile: Occupancy certificate.PDF-
Architect certificate for having completed the work(in format no 5)File: Form 5.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA certificate 1897.pdf-
AIRPORT AUTHORITY NOCFile: NOC AIRPORT AUTHORITY.pdf-
SEIAA NOCFile: NOC SEIAA.pdf-
BMRCL NOCFile: NOC BMRCL.pdf-
BSNL NOCFile: NOC BSNL.pdf-
FIRE FORCE NOCFile: NOC FIRE FORCE.pdf-
KSPCB NOCFile: NOC KSPCB.pdf-
OCCUPANCY CERTIFICATEFile: Occupancy certificate.PDF-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SHAHROOQ SHAH ALI KHAN PROJECT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: SHAHROOQ SHAH ALI KHAN

SHAHROOQ SHAH ALI KHAN has 1 registration on RERA Karnataka, including SHAHROOQ SHAH ALI KHAN PROJECT. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SHAHROOQ SHAH ALI KHAN PROJECT is delayed beyond 16 Jun 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SHAHROOQ SHAH ALI KHAN PROJECT?

The registered promoter entity is SHAHROOQ SHAH ALI KHAN. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SHAHROOQ SHAH ALI KHAN PROJECT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SHAHROOQ SHAH ALI KHAN PROJECT?

The professionals named in the filing: Architect: Kabir Hira; Engineer: Prasad Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAHROOQ SHAH ALI KHAN PROJECT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAHROOQ SHAH ALI KHAN PROJECT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAHROOQ SHAH ALI KHAN PROJECT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.