Home / Browse projects / Nashik, Maharashtra / SHAH S SHATRUNJAY

Completed No litigation declared Residential / Group Housing project

SHAH S SHATRUNJAY

By SHAH BUILDERS AND DEVELOPERS

RG-MH-53715 · RERA P51600019774 · Last updated on MahaRERA portal: 3 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 11 other registrations.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
24 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

SHAH S SHATRUNJAY is a Residential / Group Housing project by SHAH BUILDERS AND DEVELOPERS in Nashik, Maharashtra, registered with MahaRERA as P51600019774 on 5 Mar 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameSHAH S SHATRUNJAY
  • TypeResidential / Group Housing
  • Location
    • BALGRUGH ROAD
    • NEAR KALAPURAM JAIN MANDIR
    • Belatgavhan
    • Nashik
    • 422502
  • Pincode422502
  • RERA no.P51600019774
  • ReraGenie IDRG-MH-53715

Builder

  • NameSHAH BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersMAHENDRA KANKUCHAND SHAH, SHRUTI ATISH SHAH
  • Other registrations11 more →
  • Completed10 of 12
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

this monthRegisteredMar 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Mar 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA30000
BNA30000
CNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
A11
B11

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,487 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
KAILAS MADHUKAR DHURJADDeolali (CB)Nashik
VILAS HARIBHAU DHURJADDeolali (CB)Nashik
VINDA DILIP NIMKARThane (M Corp.)Thane
DILIP VAMAN NIMKARThane (M Corp.)Thane

Approvals and building plan

Permissible FSI742.68
Proposed, not sanctioned743 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNASHIK ROAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHARAM PAPNEJA
PartnerRole in project
SHAH BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Jan 2025

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: From 4 Shatrujay Final.pdf3 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: From 4 Shatrunjay.pdf16 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion b WING (1).pdf13 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion Row House.pdf13 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Architect from 4.pdf18 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Certificat Annual Shatrunjay.pdf30 Sep 2021
Certificates of CA (Form 3)File: 774 Q3 20-21_compressed.pdf13 Aug 2021
Certificates of CA (Form 3)File: 774 Q4 20-21_compressed.pdf13 Aug 2021
Certificates of CA (Form 3)File: 774 Q1 21-22_compressed.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer CErtificae.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certificate.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certifacate_compressed.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner CErtificate_compressed.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_compressed.pdf12 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginer Certificate_compressed.pdf12 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FROM nO 2.pdf12 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf9 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Ceritifcate_compressed.pdf9 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf9 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf9 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Compliation_compressed.pdf9 Aug 2021
Form 2AFile: Shatrunjay Quality Certificate_compressed.pdf9 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf8 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate-1-3.pdf8 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate-4-6.pdf8 Oct 2020
Certificates of CA (Form 3)File: CA Cerrificate.pdf8 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Shah Shatrunjay.pdf8 Oct 2020
Form 2AFile: Shah Satrunjay 3112.pdf5 Mar 2020
PAN CardFile: PAN CARD.pdf2 Mar 2020
Certificates of CA (Form 3)File: CA Certificate.pdf11 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtich Certificate compressed.pdf19 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engieer Cetificate_compressed.pdf19 Dec 2019
Form 2AFile: from No 02.pdf19 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: dharam papneja associate 16.pdf9 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: C A Audit Report.pdf9 Dec 2019
Annual Audit Report of Statutory CA (Form 5)File: Shatrunjay.pdf30 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Bhave Estimate_compressed.pdf11 Jul 2019
Form 2AFile: Quality Assurance.pdf11 Jul 2019
Building plan approvalFile: 1.pdf13 Jun 2019
Building Plan Approval (IOD)File: 1.pdf13 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: 2.pdf13 Jun 2019
Commencement Certificates / NA Order for plotted developmentFile: 3.pdf13 Jun 2019
Certificates of CA (Form 3)File: RERA Certificate of Shah Builders.pdf20 Feb 2019
Proforma of Allotment letterFile: ALLOTMENT-LETTER-dhurjad.pdf20 Feb 2019
Copy of the legal title reportFile: img03530-ilovepdf-compressed.pdf18 Feb 2019
Building plan approvalFile: Building Plan.pdf14 Feb 2019
Building plan approvalFile: Santion Plan.pdf14 Feb 2019
Layout approvalFile: DLR Map.pdf14 Feb 2019
Copy of Layout Approval (in case of layout)File: DLR Map.pdf14 Feb 2019
Building Plan Approval (IOD)File: Building Plan.pdf14 Feb 2019
Building Plan Approval (IOD)File: Santion Plan.pdf14 Feb 2019
Declaration in FORM BFile: Atish Shah.pdf14 Feb 2019
Declaration in FORM BFile: Atish Shah.pdf14 Feb 2019
Declaration in FORM BFile: Atish Shah.pdf14 Feb 2019
Details of encumbrancesFile: 33-3.pdf11 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: sanction letter-11122016215553.pdf11 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: document 1-28012019162024.pdf11 Feb 2019

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHAHS SAI RAM RESIDENCYBANACHAL REST ROAD DEOLALI6CompletedAug 2015Late, Jan 2016
SHAHS GARDEN RESIDENCY PHASE INEAR SAINIK SOCIETY VIJAY NAGAR DEOALI CAPM104CompletedJan 2015Late, May 2015
SHAHS GARDEN ESTATEVIJAY NAGAR BHAGUR DEOLALI CAMP NASHIK91CompletedDec 2014Late, Oct 2015
SHAHS SAI RESIDENCYLAM ROAD DEOLALI CAMP28CompletedMay 2014Late, Oct 2015

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAH S SHATRUNJAY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR KALAPURAM JAIN MANDIR4,100+ in Nashik

Builder: SHAH BUILDERS AND DEVELOPERS

SHAH BUILDERS AND DEVELOPERS has 12 registrations on MahaRERA, including SHAHS GARDEN RESIDENCY PHASE II and SHAH GOVIND APARTMENT PHASE II. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if SHAH S SHATRUNJAY is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAH S SHATRUNJAY?

The registered promoter entity is SHAH BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAH S SHATRUNJAY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAH S SHATRUNJAY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAH S SHATRUNJAY?

The professionals named in the filing: Architect: DHARAM PAPNEJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAH S SHATRUNJAY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAH S SHATRUNJAY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAH S SHATRUNJAY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.