SERENITY BY SKBC
By Sri Krishna Balaji Constructions LLP
RG-KA-51458 · RERA PRM/KA/RERA/1251/309/PR/050924/006993 · Last updated on RERA Karnataka portal: 19 Aug 2024
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SERENITY BY SKBC is a Residential/Group Housing project by Sri Krishna Balaji Constructions LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/050924/006993 on 5 Sep 2024. Possession is promised by 16 Apr 2024.
At a glance
Project
- NameSERENITY BY SKBC
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- 560086
- Pincode560086
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/050924/006993
- ReraGenie IDRG-KA-51458
Builder
- NameSri Krishna Balaji Constructions LLP
- Entity typePartnership Firm
- LLPINAAL-0188
- GSTIN29ADNFS3504M1ZJ
- Authorized SignatoryDEEPAK SHAH
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on5 Sep 2024
- Promised completion16 Apr 2024
- Revised completionNone
- Buildings1 building record
- Documents filed120 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 22 | 0 | 22 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 19 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 19 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership8
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Ankit Valia | - | - |
| Sangita Chetan Valia | - | - |
| Chetan Manordas Valia | - | - |
| Jayesh Manordas Vali | - | - |
| Parul Jayesh Valia | - | - |
| Suket M Valia | - | - |
| Jayashree S. Valia | - | - |
| Devang S. Valia | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 17.00 cr | - |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 4.00 cr | - |
| On-site expenditure-Salaries of workers | Rs 1.00 cr | - |
| Payment of taxes | Rs 1.00 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | G. Teja Sai Chandra |
| Engineer | Kiran Kumar S |
| Chartered Accountant | Palavalasa Gowrinaidu P |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed120
As listed on the registration, under the names the promoter filed them with; the newest 80 of 120 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/050924/006993 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| A3 Clarification for Borrowings Details not mentioned in Sources of FundsFile: A3 Clarification for Borrowings Details not mentioned in Sources of Funds.pdf | 19 Aug 2024 |
| A4 Clarification for Source of Project FundingFile: A4 Clarification for Source of Project Funding.pdf | 19 Aug 2024 |
| A5 UDIN Attested SKBC Financials_2022-23File: A5 UDIN Attested SKBC Financials_2022-23.pdf | 19 Aug 2024 |
| B2 Registered document showing title of all 8 persons mentioned as owners 40 percent shareFile: B2 Registered document showing title of all 8 persons mentioned as owners 40 percent share | 19 Aug 2024 |
| B1 Conversion Order by the DC 26-06-24File: B1 Conversion Order by the DC 26-06-24.pdf | 19 Aug 2024 |
| C1 AreaNumber of Units of KSPCB CFE 26-06-24File: C1 AreaNumber of Units of KSPCB CFE 26-06-24.pdf | 19 Aug 2024 |
| D1 Form-6 Engineer certificate in the prescribedFile: D1 Form-6 Engineer certificate in the prescribed.pdf | 19 Aug 2024 |
| D4 Proforma of Agreement to SaleFile: D4 Proforma of Agreement to Sale.pdf | 19 Aug 2024 |
| Form B_AffidavitFile: Form B_Affidavit.pdf | 19 Aug 2024 |
| JD Affidavit cum declarationFile: JD Affidavit cum declaration.pdf | 19 Aug 2024 |
| A1 Bank Account Name as per RERAFile: A1 Bank Account Name as per RERA.pdf | 19 Aug 2024 |
| A2 Form Reg 1 - Serenity (SKBC) amended bank namesFile: A2 Form Reg 1 - Serenity (SKBC) amended bank names.pdf | 19 Aug 2024 |
| A6 Bank Account Notarised AffidavitFile: A6 Bank Account Notarised Affidavit.pdf | 19 Aug 2024 |
| B3 Industrial Land Allocation letterFile: B3 Industrial Land Allocation letter.pdf | 19 Aug 2024 |
| D2 STP design drawing as per the Guidelines of KSPCB NOCFile: D2 STP design drawing as per the Guidelines of KSPCB NOC.pdf | 19 Aug 2024 |
| D5 BBMP Approved Plan Sheet 1File: D5 BBMP Approved Plan Sheet 1.pdf | 19 Aug 2024 |
| D5 BBMP Approved Plan Sheet 2File: D5 BBMP Approved Plan Sheet 2.pdf | 19 Aug 2024 |
| C2 Building License OriginalFile: C2 Building License Original.pdf | 19 Aug 2024 |
| D3 BWSSB NOC Document AffidavitFile: D3 BWSSB NOC Document Affidavit.pdf | 19 Aug 2024 |
| D5 BBMP OCFile: D5 BBMP OC.pdf | 19 Aug 2024 |
| Clarification letter from Bank on Account NamesFile: Clarification of Bank account names-RERA.pdf | 24 Jul 2024 |
| Bank AffidavitFile: Bank Affidavit.pdf | 24 Jul 2024 |
| Statement of all the three accountsFile: Statements of all the three Accounts SKBC.pdf | 24 Jul 2024 |
| chartered accountant certificate in prescribed format form -01 in new format.File: Form Reg 1 Serenity (SKBC) amended bank names.pdf | 24 Jul 2024 |
| Borrowing details not mentioned in sources of fund and in form-1, as per financial statement.File: Clarification for Borrowings Details not mentioned in Sources of Funds.pdf | 24 Jul 2024 |
| What are all the sources of funds to complete the project? With supporting documents.File: Source of Fund SKBC.pdf | 24 Jul 2024 |
| Upload profit and loss account, balance sheet & ITR, 2020-21, 2021-22 & 2022-23 with CA UDIN alongFile: Clarification for non availability of UDIN on FInancials Statements.pdf | 24 Jul 2024 |
| conversion order issued by the deputy commissionerFile: Conversion Order by the DC.pdf | 24 Jul 2024 |
| latest katha extract issued by BBMPFile: Latest katha extract BBMP.pdf | 24 Jul 2024 |
| registered document showing title of all 8 persons mentioned as owners ( 40% share)File: Registered document showing title of all 8 persons mentioned as owners 40 percent share.pd | 24 Jul 2024 |
| FAR As per the sanction plan is not matching with the details enteredFile: FAR AS PER THE SANCTION PLAN 26-6-24.pdf | 24 Jul 2024 |
| Upload commencement certificateFile: Commencement certificate SKBC.pdf | 24 Jul 2024 |
| Area/number of units of KSPCB CFE. is not matching with sanction planFile: AreaNumber of Units of KSPCB CFE 26-06-24.pdf | 24 Jul 2024 |
| Upload building licenseFile: Building License with Receipt.pdf | 24 Jul 2024 |
| Upload all clear legible sanctioned drawings floor plan, sectional drawings and elevations.File: Sanctioned drawings floor plan sectional drawings and elevations.pdf | 24 Jul 2024 |
| Please upload the Form-6, Engineer certificate in the prescribed formatFile: Form-6 Engineer certificate.pdf | 24 Jul 2024 |
| Please upload the STP design drawing as per the Guidelines of KSPCB NOC certified by the EngineerFile: STP design drawing as per the Guidelines of KSPCB NOC.pdf | 24 Jul 2024 |
| Copy of the NOC issued by BWSSBFile: BWSSB NOC Affidavit SKBC.pdf | 24 Jul 2024 |
| Copy of the NOC issued by BESCOMFile: BESCOM NOC SKBC (2) (1).pdf | 24 Jul 2024 |
| Please upload the Land cost calculation sheet as per the guidance value(self-attested copy)File: Land cost calculation sheet SKBC.pdf | 24 Jul 2024 |
| source of water supply to the project clarification letterFile: Clarification on Source of Water Supply to the project.pdf | 24 Jul 2024 |
| Agreement Of SaleFile: ATS SKBC.pdf | 24 Jul 2024 |
| Proforma of Allotment letterFile: Proforma of allotment letter SKBC.pdf | 24 Jul 2024 |
| Please upload the reason for delay in RERA registrationFile: Clarification for Reason of Delay in applying RERA.pdf | 24 Jul 2024 |
| conversion order issued by the deputy commissionerFile: Change of Land Use (1).pdf | 29 May 2024 |
| Conversion order issued by the deputy commissionerFile: Change of Land Use.pdf | 27 Apr 2024 |
| Upload Single plot layout .File: single plot layout.pdf | 27 Apr 2024 |
| Upload all clear legible sanctioned drawings floor plan, sectional drawings and elevations.File: Building plan basement,ground and 1st floor.pdf | 27 Apr 2024 |
| Upload all clear legible sanctioned drawings floor plan, sectional drawings and elevations.File: Building plan 2nd,3rd and terrace.pdf | 27 Apr 2024 |
| Please mention the project name and project address and upload the section 3(1) notarized affidavit.File: Section 3 of 1.pdf | 27 Apr 2024 |
| Upload commencement certificate.File: Commencement certificate.pdf | 27 Apr 2024 |
| notarized no-litigation affidavitFile: No Litigation affidavit (1).pdf | 27 Apr 2024 |
| sources of funds to complete the projectFile: Source of fund.pdf | 27 Apr 2024 |
| EC from 28-11-2023 to till dateFile: Encumbrance Certificate.pdf | 27 Apr 2024 |
| need to upload correct title deedFile: Tittle deed.pdf | 27 Apr 2024 |
| latest katha extract issued by BBMPFile: Khatha.pdf | 27 Apr 2024 |
| title deeds of all 8 persons mentioned as owners ( 40% share)File: Supplimentary and allocation agreement.pdf | 27 Apr 2024 |
| Upload CDP map showing the proposed site.File: CDP.pdf | 27 Apr 2024 |
| Upload village map showing the proposed site.File: Village map.pdf | 27 Apr 2024 |
| Please update the project Engineer details and upload the latest self attested copy of the EngineerFile: Licence copy.pdf | 27 Apr 2024 |
| Please upload the brief estimated cost of construction certified by the Engineer.File: Estimation of Serenity.pdf | 27 Apr 2024 |
| project specification certified by the Engineer.File: SERENITY BY SKBC-Specifications.pdf | 27 Apr 2024 |
| Upload Single plot layout order.File: single plot.pdf | 27 Apr 2024 |
| Please upload the Engineer certificate in the prescribed format.File: Form - 3 SERENITY (1).pdf | 27 Apr 2024 |
| Please mention the project name and project address and upload the section 3(1) notarized affidavitFile: AFFIDAVIT 3 OF 1.pdf | 27 Apr 2024 |
| Upload chartered accountant certificate in prescribed format form -01 in new format.File: Form 1(CA).pdf | 27 Apr 2024 |
| Upload certified carpet area calculation.File: copy.pdf | 27 Apr 2024 |
| Area calculation sheet certified by the Engineer.File: Area details certified by engineer.pdf | 27 Apr 2024 |
| the calculation sheet Amenities and Common area details certified by the Engineer.File: Common Area Certification.pdf | 27 Apr 2024 |
| title deeds of all 8 persons mentioned as owners ( 40% share)File: SKBC SUPPLEMENTARY AND ALLOCATION AGREEMENT DT 21-11-2023 (2).pdf | 27 Apr 2024 |
| Registration CertificateFile: SKBC GSTIN Registration Certificate.pdf | - |
| Partnership DeedFile: SKBC GSTIN Registration Certificate.pdf | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: Form 1(CA)_compressed.pdf | - |
| Certificate issued by Architect Form 2File: Form -2 architects form SERINITY (1).pdf | - |
| Certificate issued by Engineer Form 3File: Form - 3 SERENITY.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Form B.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SERENITY BY SKBC on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
Oakstone Lakeview
OAKSTONE VENTURES
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Sri Krishna Balaji Constructions LLP
Sri Krishna Balaji Constructions LLP has 1 registration on RERA Karnataka, including SERENITY BY SKBC. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SERENITY BY SKBC is delayed beyond 16 Apr 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SERENITY BY SKBC?
The registered promoter entity is Sri Krishna Balaji Constructions LLP, a partnership firm as per the filing. Its LLPIN AAL-0188 and GSTIN 29ADNFS3504M1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SERENITY BY SKBC?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SERENITY BY SKBC?
The professionals named in the filing: Architect: G. Teja Sai Chandra; Engineer: Kiran Kumar S; Chartered Accountant: Palavalasa Gowrinaidu P. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SERENITY BY SKBC?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback