Registered No litigation declared Residential / Group Housing project

SENGHANI PARADISE

By MANSUKHLAL VELJI SENGHANI

RG-MH-47234 · RERA P51800048036 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
8 of 11Construction stages donefurthest along: External plumbing and external plaster, 90%
6 of 31Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 134 documents Report an error

SENGHANI PARADISE is a Residential / Group Housing project by MANSUKHLAL VELJI SENGHANI in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048036 on 7 Dec 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 25 of the 31 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSENGHANI PARADISE
  • TypeResidential / Group Housing
  • Location
    • UPASHRAYA LANE
    • GHATKOPAR EAST
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800048036
  • ReraGenie IDRG-MH-47234

Builder

  • NameMANSUKHLAL VELJI SENGHANI
  • Entity typeIndividual

Key dates

this monthRegisteredDec 2022First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Dec 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed134 files

Current status

81%25 of 31 units booked
91.0%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Senghani ParadiseNA121031031

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 90%.

Senghani Paradise: 96% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes75%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area800 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2499.0
Proposed, not sanctioned2,499 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI MAROL BRANCH 400059
Estimated costRs 13.50 cr
Cost incurredRs 12.29 cr
Work done91.0%
BuildingWingEstimatedIncurred
Senghani ParadiseNARs 10.80 crRs 10.75 cr
-NARs 2.70 crRs 1.54 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDeole Bros
EngineerSachin Yadav
EngineerPa
EngineerManthan Shantilal Patel
Chartered AccountantPiyush C Parvadiya
Chartered AccountantYogesh Narshi Patel & Associates
PartnerRole in project
MANSUKHLAL VELJI SENGHANI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA16062621396Jun 2026 → Jun 2027

Reason as filed by the promoterReasons for Delay - Interruption in construction activities - Financial constraints and restructuring - Delay in obtaining statutory approvals - Contractor and labour related issues

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed134

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 134 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate - June 26.pdf18 Jul 2026
Withdrawal Update Form 2File: Engineer Certificate - Jun 26.pdf18 Jul 2026
Withdrawal Update Form 3File: CA Certificate - Jun 26.pdf18 Jul 2026
Form 1File: Architect Certificate - Dec 22.pdf16 Jun 2026
Form 2File: Enginers Certificate - Dec 22.pdf16 Jun 2026
Form 3File: CA Certificate_ com.pdf16 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf16 Jun 2026
Form 1File: Architect Certificate March 23.pdf16 Jun 2026
Form 2File: Enginner certificate - March 2023.pdf16 Jun 2026
Form 3File: CA Certificate - Mar 2023_C.pdf16 Jun 2026
Disclosure of Sold and Booked InventoryFile: SENGHANI_PARADISE_Inventory Mar 2023.pdf16 Jun 2026
Form 1File: Architect Certificate- Sep 23.pdf16 Jun 2026
Form 2File: Engineer Certificate- Sep 2023.pdf16 Jun 2026
Form 3File: CA Certificate.pdf16 Jun 2026
Disclosure of Sold and Booked InventoryFile: SENGHANI_PARADISE_Inventory Sep 2023.pdf16 Jun 2026
Form 1File: Architect Certificate - Mar 25 (1).pdf16 Jun 2026
Form 2File: Engineer Certificate - March 2025.pdf16 Jun 2026
Form 3File: CA Certificate 31032025.pdf16 Jun 2026
Disclosure of Sold and Booked InventoryFile: SENGHANI_PARADISE_Inventory Mar 25.pdf16 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A - Site Supervisor Certificate FY 22-23.pdf16 Jun 2026
Form 2A (FY 2023-2024)File: Form 2A - Site Supervisor Certificate FY 23-24.pdf16 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A - Site Supervisor Certificate FY 24-25.pdf16 Jun 2026
Form 2A (FY 2025-2026)File: Form 2A - Site Supervisor Certificate FY 25-26.pdf16 Jun 2026
Form 5 (FY 2023-2024)File: RERA AUDIT.pdf16 Jun 2026
Withdrawal Update Form 1File: Architect Certificate Mar 26.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate - Mar 26.pdf20 Apr 2026
Withdrawal Update Form 3File: Mansukhlal Senghani Form 3 Q4 F.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2-C.pdf20 Jan 2026
Withdrawal Update Form 3File: Mansukhlal Senghani Form 3 FY 25-26 Q3.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf20 Oct 2025
Withdrawal Update Form 2File: Withdrawal Application Form2.pdf20 Oct 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf20 Oct 2025
Form 5 (FY 2022-2023)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23).pdf1 Oct 2025
Form 5 (FY 2024-2025)File: Mansukhlal Senghani-form-5.pdf29 Sep 2025
Withdrawal Update Form 1File: Architect Certificate - Jun 25.pdf1 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate - Jun 25.pdf1 Aug 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf1 Aug 2025
Form 1File: Architect Certificate - Jun 23.pdf28 Jul 2025
Form 2File: Engineer Certificate- Jun 2023.pdf28 Jul 2025
Form 3File: 4 CA Certificate on Project Cost & Fund withdrawal (Form 3) (2).pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Promoter Declaration for Sold Unsold Inventory - Jun 23.pdf28 Jul 2025
Form 1File: Architect Certificate - Dec 23.pdf28 Jul 2025
Form 2File: Engineer Certificate- Dec 23.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory (2).pdf28 Jul 2025
Form 1File: Architect Certificate Mar 24.pdf28 Jul 2025
Form 2File: Engineer Certificate Mar 24.pdf28 Jul 2025
Form 3File: CA Certificate.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Promoter Declaration for Sold Unsold Inventory -Mar 24.pdf28 Jul 2025
Form 1File: Architect Certificate - Jun 24.pdf28 Jul 2025
Form 2File: Engineer Certificate- Jun 24.pdf28 Jul 2025
Form 3File: CA Certificate - June 24.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: Promoter Declaration for Sold Unsold Inventory -Jun 24 (1).pdf28 Jul 2025
Form 1File: Architect Certificate - Sep 24.pdf28 Jul 2025
Form 2File: Engineer Certificate- Sep 24.pdf28 Jul 2025
Form 3File: CA Certificate - Sep 24.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory.pdf28 Jul 2025
Form 1File: Architect Certificate - Dec 24.pdf28 Jul 2025
Form 2File: Engineer Certificate- Dec 24.pdf28 Jul 2025
Form 3File: CA Certificate - Dec 24.pdf28 Jul 2025
Disclosure of Sold and Booked InventoryFile: 6 Disclosure of sold_ booked inventory.pdf28 Jul 2025
Withdrawal Update Form 1File: Architect Certificate - Jun 25.pdf28 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate - Jun 25.pdf28 Jul 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf28 Jul 2025
Withdrawal Update Form 1File: Architect Certificate - Jun 25.pdf20 Jul 2025
Withdrawal Update Form 2File: Engineer Certificate - Jun 25.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3 - CA Certificate.pdf20 Jul 2025
Building plan approvalFile: CC Revalidation upto 06062026.pdf17 Jul 2025
Building plan approval or NA orderFile: IOD_signed.pdf27 Jun 2025
Declaration and undertaking (Annexure A)File: IOD_signed.pdf27 Jun 2025
Building plan approvalFile: Amended IOD Drawings - Page 1 & 2.pdf21 Jun 2025
Building plan approvalFile: Amended IOD Drawings - Page 3 & 4.pdf21 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Dec 24.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Architect Certificate - Dec 24.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Dec 24.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoter Declaration for Sold Unsold Inventory -Dec 24.pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Sep 24.pdf14 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Sep 24.pdf14 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Sep 24.pdf14 Dec 2024

How this compares with Mumbai Suburban

81%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SENGHANI PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

2 kmSENGHANI PARADISECompleted 132Lapsed / revoked 100Other 126Dot size: filed unitsN

Filed coordinates, straight-line distance. 358 registered projects within 2 km.

Builder: MANSUKHLAL VELJI SENGHANI

MANSUKHLAL VELJI SENGHANI has 1 registration on MahaRERA, including SENGHANI PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SENGHANI PARADISE is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SENGHANI PARADISE?

The registered promoter entity is MANSUKHLAL VELJI SENGHANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SENGHANI PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SENGHANI PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SENGHANI PARADISE?

The professionals named in the filing: Architect: Deole Bros; Engineer: Sachin Yadav; Engineer: Pa; Engineer: Manthan Shantilal Patel; Chartered Accountant: Piyush C Parvadiya; Chartered Accountant: Yogesh Narshi Patel & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SENGHANI PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SENGHANI PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SENGHANI PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.