SDMV ELITE is a Residential/Group Housing project by M/s SDMV INFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180723/006073 on 18 Jul 2023. Possession is promised by 31 Dec 2026. 121 of the 168 units on this registration are recorded sold or booked, and 17 of 17 construction stages are filed complete.
At a glance
Project
- NameSDMV ELITE
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/308/PR/180723/006073
- ReraGenie IDRG-KA-88637
Builder
- NameM/s SDMV INFRA
- Entity typePartnership Firm
- GSTIN29AEUFS2431R1Z0
- Authorized SignatoryMr.Oleti Subash
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Jul 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed243 files
Current status
Figures as on 21 Feb 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SDMV ELITE | - | - | - | 168 | 0 | 168 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 21 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 17 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 21 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 100% |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership7
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/S SDMV INFRA | - | - |
| V.Chandrappa @ Ramachandra | - | - |
| Chinnaswamy | - | - |
| M/S SDMV INFRA | - | - |
| Venkatesh and others | - | - |
| Smt.Basamma | - | - |
| M/S VMAKS BUILDERS PRIVATED LIMITED | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 42.00 cr | Rs 66.97 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bhanumathy G |
| Engineer | Srinivasa Rao Bolimunta |
| Chartered Accountant | Sobhanadri V |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed243
As listed on the registration, under the names the promoter filed them with; the newest 80 of 243 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180723/006073 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4_Q3(FY_2025-26).pdf | 21 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: SDMV INFRA - FORM-5C(Q3-2025-26).pdf | 21 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: SDMV INFRA - FORM-6A(Q3-2025-26).pdf | 21 Feb 2026 |
| Q3 2025-26 Water supply and sewage board | 21 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 21 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 21 Feb 2026 |
| Accounts SDMV Infra Current Year AllFile: SDMV - Signed Financials 2022-23.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas ConversionFile: Sy no 15-8 06 Guntas Conversion.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas Ec Sy.no.15File: Sy no 15-8 06 Guntas EC Sy No 15.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas EcFile: Sy no 15-8 06 Guntas EC.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas KathaFile: Sy no 15-8 06 Guntas Katha.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas MRFile: Sy no 15-8 06 Guntas MR.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas RTCFile: Sy no 15-8 06 Guntas RTC.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas Sale Deed in Favour of SDMV InfraFile: Sy no 15-8 06 Guntas SaleDeed In favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas Sale Deed in favour of VMAKS-1File: Sy no 15-8 06 Guntas SaleDeed In favour of VMAX-1.pdf | 3 Jul 2023 |
| Sy.no.15/8 06 Guntas Sale Deed in favour of VMAKS-2File: Sy no 15-8 06 Guntas SaleDeed In favour of VMAX-2.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Conversation 85-16-17File: Sy no 18-4 06 Guntas Conversation 85-16-17.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Conversation 86-16-17File: Sy no 18-4 06 Guntas Conversation 86-16-17.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Conversation 87-2016-17File: Sy no 18-4 06 Guntas Conversation 87-2016-17.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas EC Sy.No 18File: Sy no 18-4 06 Guntas EC Sy No 18.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Latest RTCFile: Sy no 18-4 06 Guntas Latest RTC.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Prakash Babu GPA -1File: Sy no 18-4 06 Guntas Prakash Babu GPA -1.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Prakash Babu GPA -2File: Sy no 18-4 06 Guntas Prakash Babu GPA -2.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Prakash Babu GPA -3File: Sy no 18-4 06 Guntas Prakash Babu GPA -3.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas Sale Deed in favour of SDMV InfraFile: Sy no 18-4 06 Guntas Sale Deed in favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas SD-5334 in favour of VMAXFile: Sy no 18-4 06 Guntas SD-5334 in favour of VMAX.pdf | 3 Jul 2023 |
| Sy.no. 18-4 06 Guntas SDMV KathaFile: Sy no 18-4 06 Guntas SDMV Katha.pdf | 3 Jul 2023 |
| Sy.no.15-9 15 Guntas ConversationFile: Sy no 15-9 15 Guntas Conversation.pdf | 3 Jul 2023 |
| Sy.no.15-9 15 Guntas EC Sy.No 15File: Sy no 15-9 15 Guntas EC Sy No 15.pdf | 3 Jul 2023 |
| Sy.no.15-9 15 Guntas JDA Chandrappa in favour of SDMV InfraFile: Sy no 15-9 15 Guntas JDA Chandrappa in favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no.15-9 15 Guntas MR FOR 15 GUNTASFile: Sy no 15-9 15 Guntas MR FOR 15 GUNTAS.pdf | 3 Jul 2023 |
| Sy.no.15-9 15 Guntas RTCFile: Sy no 15-9 15 Guntas RTC.pdf | 3 Jul 2023 |
| Sy.no.15-9 15 Guntas SDMV Elite KathaFile: Sy no 15-9 15 Guntas SDMV Elite Katha.pdf | 3 Jul 2023 |
| Sy.no.15-9 15 Guntas TITLE DEEDFile: Sy no 15-9 15 Guntas TITLE DEED.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas Conversation 208-2015-16File: Sy no 18-1 3 1-4 Guntas Conversation 208-2015-16.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas ConversionFile: Sy no 18-1 3 1-4 Guntas Conversion.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas EC Sy.No 18File: Sy no 18-1 3 1-4 Guntas EC Sy No 18.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas MRFile: Sy no 18-1 3 1-4 Guntas MR.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas RTCFile: Sy no 18-1 3 1-4 Guntas RTC.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas Sale Deed 5053 in Favour of VamxFile: Sy no 18-1 3 1-4 Guntas Sale Deed 5053 in Favour of Vamx.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas Sale Deed 5334 in Favour of VamxFile: Sy no 18-1 3 1-4 Guntas Sale Deed 5334 in Favour of Vamx.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas Sale Deed in favour of SDMV InfraFile: Sy no 18-1 3 1-4 Guntas Sale Deed in favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no.18-1 3 1-4 Guntas SDMV Elite KathaFile: Sy no 18-1 3 1-4 Guntas SDMV Elite Katha.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas RTCFile: Sy no 18-4 09 Guntas RTC.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas ConversationFile: Sy no 18-4 09 Guntas Conversation.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas EC Sy.No 18File: Sy no 18-4 09 Guntas EC Sy No 18.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas ECFile: Sy no 18-4 09 Guntas EC.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas JD in favour of SDMV InfraFile: Sy no 18-4 09 Guntas JD in favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas MRFile: Sy no 18-4 09 Guntas MR.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas SDMV Elite KathaFile: Sy no 18-4 09 Guntas SDMV Elite Katha.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas Title DeedFile: Sy no 18-4 09 Guntas Title Deed.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas Title Deed-1File: Sy no 18-4 09 Guntas Title Deed-1.pdf | 3 Jul 2023 |
| Sy.no.18-4 09 Guntas Title Deed-2File: Sy no 18-4 09 Guntas Title Deed-2.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas Conversation 202-2006-07File: Sy no 18-4 15 Guntas Conversation 202-2006-07.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas EC Sy.No 18File: Sy no 18-4 15 Guntas EC Sy No 18.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas JDA Venkatesh in favour of SDMV InfraFile: Sy no 18-4 15 Guntas JDA Venkatesh in favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas RTCFile: Sy no 18-4 15 Guntas RTC.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas SDMV Elite KathaFile: Sy no 18-4 15 Guntas SDMV Elite Katha.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas Title Deed -1File: Sy no 18-4 15 Guntas Title Deed -1.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas Title Deed -2File: Sy no 18-4 15 Guntas Title Deed -2.pdf | 3 Jul 2023 |
| Sy.no.18-4 15 Guntas Title Deed -3File: Sy no 18-4 15 Guntas Title Deed -3.pdf | 3 Jul 2023 |
| Sy.no.18-8 01 Gunta ConversationFile: Sy no 18-8 01 Gunta Conversation.pdf | 3 Jul 2023 |
| Sy.no.18-8 01 Gunta EC Sy.No 18File: Sy no 18-8 01 Gunta EC Sy No 18.pdf | 3 Jul 2023 |
| Sy.no.18-8 01 Gunta RTCFile: Sy no 18-8 01 Gunta RTC.pdf | 3 Jul 2023 |
| Sy.no.18-8 01 Gunta Sale 5334 Deed in favour of VMAXFile: Sy no 18-8 01 Gunta Sale 5334 Deed in favour of VMAX.pdf | 3 Jul 2023 |
| Sy.no.18-8 01 Gunta Sale Deed in favour of SDMV InfraFile: Sy no 18-8 01 Gunta Sale Deed in favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no.18-8 01 Gunta SDMV Elite KathaFile: Sy no 18-8 01 Gunta SDMV Elite Katha.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas Conversion Sy.no.18_9 measuring 2 GuntasFile: Sy no 18-9 04 Guntas Conversion Sy no 18-9 measuring 2 Guntas.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas Conversion-sy.no.18_1 and 18_9-pages-1-7File: Sy no 18-9 04 Guntas Conversion-sy no 18-1 and 18-9-pages-1-7.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas EC Sy.No 18File: Sy no 18-9 04 Guntas EC Sy No 18.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas RTCFile: Sy no 18-9 04 Guntas RTC.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas Sale Deed 4403 in favour of VMAXFile: Sy no 18-9 04 Guntas Sale Deed 4403 in favour of VMAX.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas Sale Deed 5053 in favour of VMAXFile: Sy no 18-9 04 Guntas Sale Deed 5053 in favour of VMAX.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas SDMV Elite KathaFile: Sy no 18-9 04 Guntas SDMV Elite Katha.pdf | 3 Jul 2023 |
| Sy.no.18-9 04 Guntas SDMV Sale DeedFile: Sy no 18-9 04 Guntas SDMV Sale Deed.pdf | 3 Jul 2023 |
| Sy.no.18-9 13.5 Guntas Conversion Sy.no.18_9File: Sy no 18-9 13 5 Guntas Conversion Sy no 18_9.pdf | 3 Jul 2023 |
| Sy.no.18-9 13.5 Guntas EC Sy.No 18File: Sy no 18-9 13 5 Guntas EC Sy No 18.pdf | 3 Jul 2023 |
| Sy.no.18-9 13.5 Guntas JDA Gopal Ragupathy in favour of SDMV InfraFile: Sy no 18-9 13 5 Guntas JDA Gopal Ragupathy in favour of SDMV Infra.pdf | 3 Jul 2023 |
| Sy.no.18-9 13.5 Guntas RTCFile: Sy no 18-9 13 5 Guntas RTC.pdf | 3 Jul 2023 |
| Sy.no.18-9 13.5 Guntas SDMV Elite KathaFile: Sy no 18-9 13 5 Guntas SDMV Elite Katha.pdf | 3 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep SDMV ELITE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: M/s SDMV INFRA
M/s SDMV INFRA has 1 registration on RERA Karnataka, including SDMV ELITE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if SDMV ELITE is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SDMV ELITE?
The registered promoter entity is M/s SDMV INFRA, a partnership firm as per the filing. Its GSTIN 29AEUFS2431R1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SDMV ELITE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SDMV ELITE?
The professionals named in the filing: Architect: Bhanumathy G; Engineer: Srinivasa Rao Bolimunta; Chartered Accountant: Sobhanadri V. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SDMV ELITE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.