Registration approved Residential/Group Housing project

SBR PRAVANIKA

By SBR HABIITAT LLP

RG-KA-33721 · RERA PRM/KA/RERA/1251/446/PR/191220/003080 · Last updated on RERA Karnataka portal: 10 Dec 2019

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2023Possession promisedmoved 9 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 62 documents Report an error

SBR PRAVANIKA is a Residential/Group Housing project by SBR HABIITAT LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/191220/003080 on 20 Dec 2019. Possession is promised by 30 Sep 2023. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSBR PRAVANIKA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/191220/003080
  • ReraGenie IDRG-KA-33721

Builder

  • NameSBR HABIITAT LLP
  • Entity typePartnership Firm
  • Authorized SignatoryT.VENUGOPAL
  • Other registrations3 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredDec 2019First promiseDec 2022Revised toSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Dec 2019
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 31 Dec 2022)
  • Buildings2 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---1210121
B Block---99099

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 10 Dec 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 10 Dec 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,705 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 80.30 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNADIG ASSOCIATES
EngineerAEDBM CONSULTANTS PVT LTD

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2022 → Sep 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01274/2025-SBR HABIITAT LLP14/10/2025

Documents filed62

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/191220/003080 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Relinquishment DeedFile: Relinquishment deed SBR PRAVANIKA.pdf10 Dec 2019
CertificateFile: Certificate of Incorporation.pdf-
SBR Pravanika BDA Approval Letter-
Site Plan Elevation-
PLAN SANCTION DRAWINGS-
Saledeed Draft-
Agreement to sell Draft-
SALE DEED RTC AND OTHER DOCUMENTS-
Site Plan Elevation for section of building-
AREA DEVELOPMENT PLAN-
Letter of Allotment-
Brochure SBR PRAVANIKA-
SBR Pravanika BDA Approval Letter-
PROJECT SPECIFICATION SBR PRAVANIKA-
Encumbrance Certificate PRAVANIKA-
AFFIDAVIT-
Joint Affidavit Cum Declaration notarized-
Latest E Khata-
JDA Supplementary GPA (2)-
SALE DEED RTC AND OTHER DOCUMENTS-
CONVERSION ORDER CHANGE OF LAND USE-
26 NOC under sec 14 of KTCP Act-
48 Utilizatin Certificate-
49 Transfer of development rights certificate-
50 Relinquishment Deed-
27 Fire-
28 AAI-
BESCOM NOC-
30 BWSSB NOC-
KSPCB-
32 MOEF-
33 BSNL-
46 NOC for Neighbouring properties-
Unnamed document-
39 Urban Land Ceiling NOC-
38 BMRCL NOC-
41 Bangalore Urban Arts Commission-
42 Inspector of Factories controller of explosives Railways-
43 District Magistrate-
44 Coastal Regulation Zone Authority-
PLAN SANCTION DRAWINGS-
Existing Layout Plan (Sanction Drawings)-
Existing Section Plan-
CHANGE OF LAND USE Conversion Order SBR PRAVANIKA-
ADV SEARCH REPORT SBR PRAVANIKA-
Balance Sheet 2018 - 2019File: B S 2017 2018.PDF-
Balance Sheet 2017 - 2018File: BALANCE SHEET 16-17.pdf-
Audited Profit and Loss Statement 2018 - 2019File: P AND L 2017 2018.PDF-
Audited Profit and Loss Statement 2017 - 2018File: P AND L 2016-2017.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P AND L 2015-2016.pdf-
Cash Flow Statement 2018 - 2019File: CASH FLOW AND PROJECT HEAD.PDF-
Cash Flow Statement 2017 - 2018File: CASH FLOW AND PROJECT HEAD.PDF-
Auditor's Report 2018 - 2019File: Audit report 17 18.PDF-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 2017 2018.PDF-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 2017.PDF-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2016.pdf-
Form B NOTARIZED-
Tower Excel SheetFile: PRMKARERA1251446PR191220003080.xlsx-
Occupancy CertificateFile: SBR Pravanika OC.pdf-
Completion certificate issued by the competent authorityFile: SBR Pravanika OC.pdf-
Registered Agreement of SaleFile: A-106 AOS PRAVANIKA.PDF-
Registered conveyance deed for an individual unitFile: A-201 Pravanika sale deed.PDF-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
SBR KEERTHI-OngoingOct 2022Not delivered
SBR TEJAS-OngoingDec 2021Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SBR PRAVANIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSBR PRAVANIKAOther 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: SBR HABIITAT LLP

SBR HABIITAT LLP has 4 registrations on RERA Karnataka, including SBR KEERTHI and SBR TEJAS. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SBR PRAVANIKA is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SBR PRAVANIKA?

The registered promoter entity is SBR HABIITAT LLP, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SBR PRAVANIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SBR PRAVANIKA?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SBR PRAVANIKA?

The professionals named in the filing: Architect: NADIG ASSOCIATES; Engineer: AEDBM CONSULTANTS PVT LTD. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SBR PRAVANIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SBR PRAVANIKA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SBR PRAVANIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.