Home / Browse projects / Bengaluru Urban, Karnataka / SATTVA AARANYA

Registration approved Litigation declared Residential/Group Housing project

SATTVA AARANYA

By Sattva Resi Private Limited

RG-KA-05501 · RERA PRM/KA/RERA/1251/310/PR/241225/008358 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jan 2031Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 89%
317 of 418Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 136 documents Report an error

SATTVA AARANYA is a Residential/Group Housing project by Sattva Resi Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/241225/008358 on 24 Dec 2025. Possession is promised by 23 Jan 2031. 101 of the 418 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameSATTVA AARANYA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560026
  • Pincode560026
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/241225/008358
  • ReraGenie IDRG-KA-05501

Builder

  • NameSattva Resi Private Limited
  • Entity typeCompany
  • CINU45309KA2022PTC160813
  • GSTIN29ABICS4269F1ZX
  • Authorized SignatoryMr.P.K.Mishra
  • CeoMr.P.K.Mishra
  • DirectorsShivam Agarwal, Mr.P.K.Mishra
  • Project HeadPrakash S
  • Other registrations11 more →
  • Declared earlier projects17 →

Key dates

this monthRegisteredDec 2025PromisedJan 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on24 Dec 2025
  • Promised completion23 Jan 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed136 files

Current status

24%101 of 418 units booked
4.8%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A---1380138
Tower B---1400140
Tower C---1400140

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 89%.

Building: 16% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work89%
Foundation footing work88%
Upto Plinth Level22%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)39%
Retaining wall (All types)58%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes44%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes44%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes3%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes33%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,406 sq m
Named landowners3
LandownerVillageDistrict
Anushka Constructions Private Limited--
Anushka Constructions Private Limited--
Anushka Constructions Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 464.27 cr
Cost incurredRs 22.29 cr
Spent of the estimate4.8%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 444.28 crRs 15.12 cr
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 13.33 crRs 5.34 cr
On-site expenditure-Site OverheadRs 6.66 crRs 1.83 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRamamurthy Gopalakrishnan
EngineerYOGESH H P
Chartered AccountantAvneep L Mehta

Litigation declared3

CaseCourtStatus
O.S. No. 3210/2016/2016CCH-18 XIX Addl. City Civil and Sessions Judge at Bengaluru-
OS No. 1677/2020/2020CCH26X Addl. City Civil anD Sessions Judge-
MFA No. 1910/2025/2025High Court of Karnataka at Bengaluru-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed136

As listed on the registration, under the names the promoter filed them with; the newest 80 of 136 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/241225/008358 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: RERA Certificate Sattva Aaranya.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 - Sattva Aaranya.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 - Aaranya.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Labour and Education Department15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Aaranya Q1 Form 4.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Sattva Aaranya Form 5 POC.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Sattva Aaranya Form 6 POC_compressed.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Labour and Education Department15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Sattva Aaranya Q4 FY 25-26.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 - Aaranya - POC.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Aaranya - POC.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q4 2025-26 Fire and Safety14 Apr 2026
Q4 2025-26 Labour and Education Department14 Apr 2026
Q4 2025-26 Airport Authority of India14 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Sattva Aaranya Q3 FY 25-26.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Aaranya - Form 5.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Aaranya - Form 6 Engg certificate.pdf13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)13 Jan 2026
Q3 2025-26 KPTCL- BESCOM13 Jan 2026
Q3 2025-26 Fire and Safety13 Jan 2026
Q3 2025-26 Labour and Education Department13 Jan 2026
Q3 2025-26 Airport Authority of India13 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department13 Jan 2026
EC for all sy no April-2025 to Till DateFile: 1 EC for all sy no April-2025 to Till Date.pdf24 Dec 2025
Engineer License Self-attestedFile: 2 Engineer License Self-attested.pdf24 Dec 2025
STP DrawingFile: 3 STP Drawing.pdf24 Dec 2025
Land Cost Calculation SheetFile: 4 Land Cost Calculation Sheet.pdf24 Dec 2025
Litigation and Non-Litigation AffidavitFile: 5 Litigation and Non-Litigation Affidavit.pdf24 Dec 2025
Sattva Aaranya tower ClarificationFile: 6 Sattva Aaranya tower declaration.pdf24 Dec 2025
RTC, survey 15/2-
Mutation, survey 15/2-
Encumbrance Certificate, survey 15/2-
Conversion/Alienation Order, survey 15/2-
Sale/Title/Gift Deed, survey 15/2-
JDA, survey 15/2-
Khatha, survey 15/2-
RTC, survey 15/3-
Mutation, survey 15/3-
Encumbrance Certificate, survey 15/3-
Conversion/Alienation Order, survey 15/3-
Sale/Title/Gift Deed, survey 15/3-
JDA, survey 15/3-
Khatha, survey 15/3-
RTC, survey 16/1-
Mutation, survey 16/1-
Encumbrance Certificate, survey 16/1-
Conversion/Alienation Order, survey 16/1-
Sale/Title/Gift Deed, survey 16/1-
JDA, survey 16/1-
Khatha, survey 16/1-
Registration CertificateFile: Certificate_of_Incorporation.pdf-
Memorandum of AssociationFile: MOA.pdf-
Article of AssociationFile: AOA.pdf-
GST CertificateFile: SATTVA RESI PRIVATE LIMITED_GST.pdf-
Organization StructureFile: Aaranya-Organisation Chart.pdf-
Certificate issued by CA Form 1File: Form 1 CA Certificate - Sattva Aranya.pdf-
Certificate issued by Architect Form 2File: Form 2-Aaranya.pdf-
Certificate issued by Engineer Form 3File: Form-3-Aaranya.pdf-
Project Chartered Accountant-
Project Engineer-

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date7 under way, not due yet
ProjectLocationStatusPromisedDelivered
Sattva Vasanta Skye Litigationland bearing Sy no.90/P1 (154) measuring 36 guntas, Sy no.130 measuring 2 acres, Sy no.161 measuring 1 acre 18 guntas, Sy no.112 measuring 2 acres, Sy no.113 measuring 1 acre 37 guntas, Sy no.123 measuring 6 acres and Sy no.128 measuring 1 acre 22 guntas situated at Kannamangala Village, Kasaba Hobli, Devanahalli Taluk, totally measuring an extent of 15 Acres 33 GuntasOngoingMay 2031Not due yet
Sattva Vasanta CoveKHATHA NO 4/112-6/128-34/113-45/90/P154-16/123-14/123 @ SY NO. 90(P), 112, 113(P), 123, 128(P), 130, 161 OF KANNAMANGALA VILLAGE , KASABA HOBLI, DEVANAHALLI TALUK , Devanahalli , Bengaluru RuralOngoingMay 2031Not due yet
Sattva Forest RidgeSurvey No.43/3, presently bearing BBMP Khata No. 114/43/3, situated at Anjanapura Village, Uttarahalli Hobli , Anjanapura 80 Feet Road, Ward No. 196, Bangalore , Bengaluru South , Bengaluru UrbanOngoingDec 2029Not due yet
Sattva LuminaSy. No.20/2, 20/3, 20/4, 20/5, 28/2, 28/4, 28/5, 29/1, 30/1, 30/2, 30/3, 30/4 and 30/5 of Rajanukunte Village , Hesaraghatta Hobli, Yelahanka Taluk , Yelahanka , Bengaluru UrbanOngoingNov 2029Not due yet
Park Cubix Phase 2katha number 3963/2714/341/342/1/342/2/343/1/343/2/345/2/359/360/361/2/362/1/362/2/367/1/B issued Devanahalli town municipal council, , Survey No. 341/1, 342/1, 342/2, 343/1, 343/2, 345/2, 359, 360, 361/2, 362/1, 362/2, and 367/1 all situated at Devanahalli Village, Kasaba Hobli , Devanahalli , Bengaluru Rural, KarnatakaOngoingSep 2029Not due yet
Sattva SongbirdSurvey No.16/1, Survey No.16/2 and Survey No.89, all situated at Cheemasandra Village, , Bidarahalli Hobli, Bangalore East Taluk, Budigere Road , Bengaluru East , Bengaluru UrbanOngoingMay 2029Not due yet
SATTVA SPRINGSlands bearing Survey No.179, Survey No.182/1, Survey No.182/2 , Kaggalipura Village, Uttarahalli Hobli, Bengaluru South Taluk , Bengaluru South , Bengaluru UrbanOngoingJul 2027Not due yet
Sattva SimpliCitySY. NO. 25/1,41/1(NEW SY. NO. 41/9 ) & 41/7, KATHA NO. 3878/25/1/41/1/41/7 , PATTANAGERE & MYLASANDRA VILLAGE, HEMMIGEPURA, WARD NO 198, KENGERI HOBLI , Bengaluru South , Bengaluru UrbanOngoingDec 2025Not delivered

How this compares with Bengaluru Urban

24%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SATTVA AARANYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSATTVA AARANYAOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Sattva Resi Private Limited

Sattva Resi Private Limited has 12 registrations on RERA Karnataka, including Sattva Vasanta Cove and Sattva Vasanta Skye. Its filings declare 17 earlier projects, 4 of them declared completed. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SATTVA AARANYA is delayed beyond 23 Jan 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SATTVA AARANYA?

The registered promoter entity is Sattva Resi Private Limited, a company as per the filing. Its CIN U45309KA2022PTC160813 and GSTIN 29ABICS4269F1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SATTVA AARANYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SATTVA AARANYA?

The professionals named in the filing: Architect: Ramamurthy Gopalakrishnan; Engineer: YOGESH H P; Chartered Accountant: Avneep L Mehta. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SATTVA AARANYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SATTVA AARANYA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SATTVA AARANYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.