Home / Browse projects / Mumbai Suburban, Maharashtra / Sarvasya
Sarvasya
RG-MH-88185 · RERA P51800046693 · Last updated on MahaRERA portal: 4 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sarvasya is a Residential / Group Housing project by MAVERICK REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046693 on 29 Aug 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 5 of the 28 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSarvasya
- TypeResidential / Group Housing
- Location
- Goradia
- Ghatkopar East
- Kurla
- Mumbai Suburban
- 400077
- Pincode400077
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800046693
- ReraGenie IDRG-MH-88185
Builder
- NameMAVERICK REALTORS
- Entity typeOthers
- PartnersHARSH PARESH SHAH, TUSHAR BABULAL KUVADIA
- Named personsPARESH KANTILAL SHAH, HARSH PARESH SHAH, TUSHAR BABULAL KUVADIA, Maverick Real Estate Pvt Ltd
- Other registrations8 more →
- Completed2 of 9
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Aug 2022
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed93 files
Current status
Figures as on 4 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Devpuri CHS Ltd | NA | 15 | 15 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 5%.
Devpuri CHS Ltd: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed33
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Devpuri Co-op Housing Society Ltd | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Devpuri CHS Ltd | NA | Rs 12.70 cr | Rs 9.01 cr |
| - | NA | Rs 1.62 cr | Rs 1.44 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | V S VAIDYA & ASSOCIATES Mr Rajesh Khadeparkar LS |
| Engineer | Associated Structural Consultants LLP |
| Engineer | Pravin Pitale Corporate Engineers |
| Chartered Accountant | S K RAMBHIA & ASSOCIATES |
| Chartered Accountant | Sachin Sunil and Associates |
| Partner | Role in project |
|---|---|
| MAVERICK REALTORS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: DEVPURIDT200723.pdf | 4 Jul 2026 |
| Form 2File: Devpuri Form230062023.pdf | 4 Jul 2026 |
| Form 3File: Form 3 Devpuri.pdf | 4 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Devpuri Sold Unsold Inventory June2023.pdf | 4 Jul 2026 |
| Form 1File: J572C06LSCERTDEVPURIdt101023.pdf | 4 Jul 2026 |
| Form 2File: Devpuri Form2 30092023.pdf | 4 Jul 2026 |
| Form 3File: Devpuri Form3 30092023 With Sign.pdf | 4 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Devpuri Sold Unsold Inventory Sep2023.pdf | 4 Jul 2026 |
| Form 1File: DevpuriFrom131122023.pdf | 4 Jul 2026 |
| Form 2File: Devpuri Form2 31122023.pdf | 4 Jul 2026 |
| Form 3File: Devpuri Form3 31122023.pdf | 4 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Devpuri Sold Unsold Inventory Dec2023.pdf | 4 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: 30 09 2024.pdf | 29 May 2026 |
| Form 1File: Devpuri 30092024.pdf | 29 May 2026 |
| Form 2File: Form 2 Devpuri 30092024.pdf | 29 May 2026 |
| Form 3File: Form 3 Maverick devpuri 30092024.pdf | 29 May 2026 |
| Form 3File: Ca Certificate Devpuri DEC-24 F.pdf | 29 May 2026 |
| Form 2File: Form 2 Devpuri 31122024.pdf | 29 May 2026 |
| Form 1File: J5172 C10A LS CERT DEVPURI 31122024.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: 31 12 2024.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: 31 03 2025.pdf | 29 May 2026 |
| Form 1File: J5172 C11 LS CERT DEVPURI 31032025.pdf | 29 May 2026 |
| Form 2File: Form 2 Devpuri 31 03 2025.pdf | 29 May 2026 |
| Form 3File: FORM 3 Mevrick Devpuri Mar 25.pdf | 29 May 2026 |
| Form 3File: Form 3 MAVERICK DEVPURI 30062024.pdf | 29 May 2026 |
| Form 1File: Devpuri 30062024.pdf | 29 May 2026 |
| Form 2File: Form 2 Devpuri 30062024.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: 30 06 2024.pdf | 29 May 2026 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Devpuri Form230062023.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MaverickDevpuriSarvasya30062023.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEVPURIDT200723.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J572C06LSCERTDEVPURIdt101023.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DevpuriFrom131122023.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 DEVPURIdt05042024C.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: J5172 C09 LS CERT DEVPURI dt17082024C.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Devpuri Form3 30092023.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Devpuri Form3 31122023.pdf | 15 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Devpuri Form3 31032024.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Devpuri Form230092023comps.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Devpuri Form231122023comps.pdf | 15 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DevpuriForm231032024compressed.pdf | 15 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 Sarvasya Mar'24Comp.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form-5_FY23-24_Devpuri.pdf | 15 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC up to 5th floor.pdf | 7 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: a) Form 1 Devpuri 310302023.pdf | 7 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Maverick Devpuri 31032023.pdf | 7 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf | 7 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: (13) QUALITY ASSURANCE Form 2A.pdf | 7 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Maverick Devpuri 31032023.pdf | 7 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form-5_FY22-23_Devpuri_Final.pdf | 7 Aug 2023 |
| OtherFile: Change or transfer of the separate designated bank account.pdf | 7 Aug 2023 |
| OtherFile: Format A.pdf | 7 Aug 2023 |
| OtherFile: Self Declaration Name and Bank Account change.pdf | 7 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEVPURI FORM 1 31122022.pdf | 20 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2Devpuri31122022.pdf | 20 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Devpuri Form 3 31122022.pdf | 19 Jun 2023 |
| Proforma of Agreement for saleFile: Draft Sale Agreement DEVPURI.pdf | 5 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration for Encumbrances.pdf | 17 Apr 2023 |
| Details of encumbrances concerned to LegalFile: Declaration for Encumbrances.pdf | 17 Apr 2023 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE-1-21.pdf | 23 Aug 2022 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE-22-42.pdf | 23 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Sheet.pdf | 23 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for Sale 2-1-22.pdf | 23 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Agreement for Sale 2-23-43.pdf | 23 Aug 2022 |
| Layout approvalFile: IOA APPROVAL 2pg.pdf | 22 Aug 2022 |
| Layout approvalFile: IOA APPROVA 3 pg.pdf | 22 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: IOA APPROVAL 2pg.pdf | 22 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: IOA APPROVA 3 pg.pdf | 22 Aug 2022 |
| Building plan approvalFile: IOA APPROVAL 2pg.pdf | 18 Aug 2022 |
| Building plan approvalFile: IOA APPROVA 3 pg.pdf | 18 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA APPROVAL 2pg.pdf | 18 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA APPROVA 3 pg.pdf | 18 Aug 2022 |
| Layout approvalFile: IOA APPROVAL.pdf | 16 Aug 2022 |
| Building plan approvalFile: IOA APPROVAL.pdf | 16 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: IOA APPROVAL.pdf | 16 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA APPROVAL.pdf | 16 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: (10) Form 2 - Certificate of Cost_Devpuri - Final.pdf | 16 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Maverick Realtors (Form 3).pdf | 16 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Rera Bank Account.pdf | 16 Aug 2022 |
| Building plan approvalFile: (6) (i) IOA APPROVAL_DEVPURI.pdf | 1 Aug 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| OM SAKTHI | VALJI LADDHA ROAD MULUND WEST MUMBAI-400080 | 31 | Completed | Nov 2015 | Late, Dec 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sarvasya on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ghatkopar East6,700+ in Mumbai Suburban
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: MAVERICK REALTORS
MAVERICK REALTORS has 9 registrations on MahaRERA, including NEELKANTH TIRTH CO. OP. HOUSING SOC. LTD. and MAVERICK MOOLDEEP. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Sarvasya shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Sarvasya is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sarvasya?
The registered promoter entity is MAVERICK REALTORS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sarvasya?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sarvasya?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sarvasya?
The professionals named in the filing: Architect: V S VAIDYA & ASSOCIATES Mr Rajesh Khadeparkar LS; Engineer: Associated Structural Consultants LLP; Engineer: Pravin Pitale Corporate Engineers; Chartered Accountant: S K RAMBHIA & ASSOCIATES; Chartered Accountant: Sachin Sunil and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sarvasya?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback