Red flags
- Rs 70.00 crore secured on the land, in favour of AXIS BANK LTD
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAPTASHREE GLOBAL TECH CENTER is a Commercial project by SAPTASHREE TECH WORLD in Thane, Maharashtra, registered with MahaRERA as P51700055086 on 29 Feb 2024. Possession is promised by 31 Dec 2028. 152 of the 328 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameSAPTASHREE GLOBAL TECH CENTER
- TypeCommercial
- Location
- S R BARVE MARG
- THANE
- Thane (M Corp.)
- 400604
- Pincode400604
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700055086
- ReraGenie IDRG-MH-17596
Builder
- NameSAPTASHREE TECH WORLD
- Entity typePartnership
- GSTIN27ADHFS2073B1ZA
- PartnersSOHANSINGH AMARSINGH THAKUR, AMARSINGH NARAYANSINGH THAKUR, ANKIT PREMJI GALA, PREMJI JETHALAL GALA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Feb 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed99 files
Current status
Figures as on 12 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAPTASHREE GLOBAL TECH CENTER | NA | 18 | 18 | 0 | 328 | 328 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 89%.
SAPTASHREE GLOBAL TECH CENTER: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 89% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 30% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 74% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 8% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 3% |
Progress on shared amenities15
As on 12 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAPTASHREE GLOBAL TECH CENTER | NA | Rs 201.25 cr | Rs 70.70 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | APICES STUDIO PVT LTD |
| Engineer | R.C. TIPNIS |
| Engineer | J Kumar Shekhara |
| Chartered Accountant | A K O R D & CO. |
| Chartered Accountant | MAYUR GOSRANI |
| Chartered Accountant | R G V A & Associates |
| Partner | Role in project |
|---|---|
| SAPTASHREE TECH WORLD | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Feb 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Saptashree Tech World Q1 FY 26-27.PDF | 12 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 Saptashree Tech World Q1 FY 26-27.pdf | 12 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3 Saptashree Tech World Q1 FY 26-27 signed.pdf | 12 Aug 2026 |
| Form 2A (FY 2025-2026)File: 2A-Saptashree Tech World - March-26.pdf | 29 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 Saptashree Tech World Q4 FY 25-26.PDF | 23 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 Saptashree Tech World Q4 FY 25-26.PDF | 23 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 of Project Saptashree Global Tech Q4 FY 25-26.pdf | 23 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 of Project Saptashree Global Tech Q4 FY 25-26.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Saptashree Global Tech World Q4 FY 25-26 Signed.pdf | 23 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 Saptashree Global Tech World Q4 FY 25-26 Signed.pdf | 23 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1-TECHWORLD-Q325.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: FORM-2-Q3-TECHWORLD.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_Q3 Saptashree Global Tech Center_Signed_compressed.pdf | 16 Feb 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 23-24 PROMOTER SINGED.pdf | 19 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Saptashree Global Tech Center.pdf | 9 Dec 2025 |
| Withdrawal Update Form 1File: form 1-2025-09-30_RERA APPLICATION SEPTEMBER.pdf | 24 Nov 2025 |
| Withdrawal Update Form 2File: FORM 2- TECH WORLD - SEPT-25.pdf | 24 Nov 2025 |
| Withdrawal Update Form 3File: Form 3_SEPT-25-SAPTASHREE TECH - FINAL_compressed.pdf | 24 Nov 2025 |
| Withdrawal Update Form 1File: FORM -1 JUNE-25-TECHWORLD-Final.pdf | 6 Sep 2025 |
| Withdrawal Update Form 2File: form 2 - june-25- saptashree tech world (1).pdf | 6 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 Apr25 -Jun 25 Saptashree Tech.pdf | 6 Sep 2025 |
| Form 2A (FY 2024-2025)File: 2A_TECHWORLD_SIGNED.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: STW_SOLD UNSOLD INVENTORY.pdf | 24 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: declarations.pdf | 24 Jun 2025 |
| Form 1File: 2025-03-31 RERA CERTIFICATE-MARCH.pdf | 24 Jun 2025 |
| Form 2File: FORM-2 Saptashree Global Tech MARCH-25.pdf | 24 Jun 2025 |
| Form 3File: Form 3 Q4-SAPTASHREE TECH WORLD (1) promoter signed_compressed.pdf | 24 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed- Table F Revised.pdf | 16 May 2025 |
| Form 3File: Form 3 signed- Table F Revised.pdf | 16 May 2025 |
| Form 1File: SIGNED ARCHITECTS CERTIFICATE 31-12-2024 (1).pdf | 16 May 2025 |
| Form 2File: FORM 2-DEC-24-SGT.pdf | 16 May 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD IVENTORY.pdf | 16 May 2025 |
| Self-declaration of Quarterly ProgressFile: Saptashree declaration.pdf | 16 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Q4_compressed.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 Saptashree Global Tech MARCH-25.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: revised disclosure of soldunsold Q4 (1).pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 signed- Table F Revised.pdf | 8 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SIGNED ARCHITECTS CERTIFICATE 31-12-2024 (1).pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 - WITH SIGNED AND STAMP.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-DEC-24-SGT.pdf | 11 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD IVENTORY.pdf | 11 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: DECLARATION OF ENCUMBRANCE.pdf | 10 Feb 2025 |
| CERSAI detailsFile: DECLARATION-CRESAI - ASSETS BASED.pdf | 10 Feb 2025 |
| CERSAI detailsFile: DECLARATION OF CERSAI-DEBTOR BASED.pdf | 10 Feb 2025 |
| Details of encumbrances concerned to LegalFile: DECLARATION OF ENCUMBRANCE.pdf | 10 Feb 2025 |
| Layout approvalFile: Compressed_Santioned Amended Plan_Nov 2024.pdf | 31 Dec 2024 |
| Building plan approvalFile: Compressed_Santioned Amended Plan_Nov 2024.pdf | 31 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Compressed_Santioned Amended Plan_Nov 2024.pdf | 31 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Letter A-1 3 5 6__2024-11-05.pdf | 31 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Compressed_Santioned Amended Plan_Nov 2024.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVENTORY-MARCH-24.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVENTORY- JUNE-24.pdf | 31 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD INVENTORY- SEPT-24.pdf | 31 Dec 2024 |
| Declaration about Commencement CertificateFile: DECLARATION FOR COMMENENCEMENT CERTIFICATE.pdf | 31 Dec 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance and Legal.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4_01 Apr 2024.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1- 30-6-2024 REVISED.pdf | 30 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_SEPT-24.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3- MARCH-24_compressed.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 3-JUNE-24_compressed.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PROMOTER SIGNED Q4_compressed.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PROMOTER SIGNED Q1_compressed.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PROMOTER SIGNED Q2_compressed.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-30-9-24.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-30-6-24.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 - 31-3-24 signed.pdf | 30 Dec 2024 |
| CERSAI detailsFile: UNDERTAKING FOR CERSAI- ASEETS BASED.pdf | 30 Dec 2024 |
| CERSAI detailsFile: Debtor Based Declaration.pdf | 30 Dec 2024 |
| CERSAI detailsFile: Report_Asset Based.pdf | 30 Dec 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance and Legal.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24 PROMOTER SINGED.pdf | 30 Dec 2024 |
| Proforma of Agreement for saleFile: RERA Sales Agreement.pdf | 1 Jul 2024 |
| Proforma of Allotment letterFile: revised allotment letter.pdf | 10 Feb 2024 |
| Other - FinanceFile: RERA AREA STATEMENT.pdf | 10 Feb 2024 |
| Copy of the legal title reportFile: Legal Title.pdf | 9 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE_ANKIT GALA.pdf | 9 Feb 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE_PREMJI GALA.pdf | 9 Feb 2024 |
| Building plan approvalFile: APPROVED LAYOUT AND FLOOR PLAN.PDF | 25 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED LAYOUT AND FLOOR PLAN.PDF | 25 Jan 2024 |
| Declaration about Commencement CertificateFile: DECLARATION_CC_with gmail.pdf | 25 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAPTASHREE GLOBAL TECH CENTER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near THANE7,600+ in Thane
Filed coordinates, straight-line distance. 260 registered projects within 2 km.
Dosti 604
Dosti Corporation Business Park
ONE ARTHASYA
TOP FLOOR REALTY LLP
ASHAR MERAC PHASE I
AJAY PRATAP ASHAR
EMPERIA I PARK
MANOMETER (INDIA) LLP
Ace Signature IT Park
Yojit Builder
O22 Business Park
MIDAS TOUCH
See every Thane project, with the district possession charts
Builder: SAPTASHREE TECH WORLD
SAPTASHREE TECH WORLD has 1 registration on MahaRERA, including SAPTASHREE GLOBAL TECH CENTER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SAPTASHREE GLOBAL TECH CENTER is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAPTASHREE GLOBAL TECH CENTER?
The registered promoter entity is SAPTASHREE TECH WORLD, a partnership as per the filing. Its GSTIN 27ADHFS2073B1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAPTASHREE GLOBAL TECH CENTER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAPTASHREE GLOBAL TECH CENTER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAPTASHREE GLOBAL TECH CENTER?
The professionals named in the filing: Architect: APICES STUDIO PVT LTD; Engineer: R.C. TIPNIS; Engineer: J Kumar Shekhara; Chartered Accountant: A K O R D & CO.; Chartered Accountant: MAYUR GOSRANI; Chartered Accountant: R G V A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAPTASHREE GLOBAL TECH CENTER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback