Home / Browse projects / Mumbai Suburban, Maharashtra / Sapphire I
Sapphire I
RG-MH-20379 · RERA P51800006372 · Last updated on MahaRERA portal: 28 Sep 2019
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 46 complaints at MahaRERA
- Completion date moved by 57 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sapphire I is a Others project by ITMC Developers Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006372 on 14 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. The completion date has moved by 57 months from the original filing. 46 complaints are on record with the regulator.
At a glance
Project
- NameSapphire I
- TypeOthers
- Location
- Adi Shankaracharya Marg
- Vikroli East
- Kurla
- Mumbai Suburban
- 400083
- Pincode400083
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800006372
- ReraGenie IDRG-MH-20379
Builder
- NameITMC Developers Pvt. Ltd.
- Entity typeCompany
- Managing DirectorVivek Jayesh Tanna
- Other registrations1 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Aug 2017
- Promised completion30 Dec 2023
- Revised completionRevised to 30 Dec 2023 (originally 31 Mar 2019)
- Buildings1 building record
- Documents filed51 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sapphire I | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Sep 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 75%.
Sapphire I: 40% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 75% |
| Podiums (if any) | 30% |
| Plinth | 75% |
| Stilt Floor | 70% |
| Slabs of Super Structure | 45% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 20% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Sep 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ellora Project Consultants Pvt Ltd |
| Engineer | Ellora Project Consultants |
| Chartered Accountant | Anup B.Agrawal & Co. |
| Chartered Accountant | Mohandas & Co |
| Partner | Role in project |
|---|---|
| ITMC Developers Pvt. Ltd. | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterI Mr. Jayesh Tanna, promoter of the project Sapphire I a SRA project at plot having C TS No 4A/1A/2A part, 4A/1A/2B part, 4A/1A/2C part at Kurla, Kurla, Mumbai Suburban, 400083 duly registered with MahaRERA having project registration number: P51800006372 hereby say that while registering the project with MahaRERA authority in the month of July 2017, the project completion date was mentioned as 31.03.2019. I further say that, the project is a SRA project under DCR 33(10) and 33(14D) and permission of the sale building is linked to the construction of the Rehab Building and due to some issues w
Reason as filed by the promoterAll the slum dwellers/members have not vacated the site which has caused hurdles/obstruction in the progress of the construction work of the project, thereby resulting in escalation of the expenditure/costs and the timelines towards the completion of the Rehab as well as Sale Project. Moreover due to the current financial crisis prevailing in the market, the generation of funds has become difficult which added fuel to fire. Accordingly, in order to arrive at a solution a meeting of the flat purchasers of Sapphire Project was called out on 26.01.2020 to carve out the resolution plan for the suc
Complaints filed with MahaRERA46
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000001106 | Saji Samuel | ITMC Developers Pvt. Ltd. | 24/10/2017 |
| CC006000000192965 | SAJI SAMUEL | ITMC Developers Pvt. Ltd. | 23/02/2021 |
| CC006000000001403 | MANDEEP SINHA & ANUSHKA SINHA | Mr. Deep Tanna | 24/10/2017 |
| CC006000000000599 | Mayank Chauhan and Brig Balwant Singh Chauhan | ITMC DEVELOPERS PVT LTD | 13/09/2017 |
| CC006000000012211 | Mrs. Rajani Jagdish Badhan | ITMC DEVELOPERS PVT. LTD. | 15/12/2017 |
| CC006000000001140 | Shraddhanand More | Indiabulls Distribution Services Ltd | 24/10/2017 |
| CC006000000000525 | Satish Kalani | ITMC Developers Pvt Ltd | 24/10/2017 |
| CC006000000001678 | Mahesh Lohia | ITMC Developers Pvt. Ltd | 02/11/2017 |
| CC006000000001155 | Sreekumar Nair | Shree Sai Group of Companies | 27/10/2017 |
| CC006000000001413 | Krishna Kumar Neduguil | ITMC Developers Pvt. Ltd. | 24/10/2017 |
| CC006000000001478 | Mohit Kumar | International Trading & Manufacturing Co | 26/10/2017 |
| CC006000000001435 | Radha Arakkal | Jayesh Tanna, ITMC, Shree Sai Group of Companies | 24/10/2017 |
| CC006000000054796 | International Trading & Manufacturing Company | Samir Parekh | 09/06/2018 |
| CC006000000197277 | PARAMHANS JAGMOHAN SINGH | ITMC Developers Pvt. Ltd. | 16/06/2021 |
| CC006000000192515 | Ravindra Laxman Vengurlekar | ITMC Developers Pvt Ltd | 09/02/2020 |
| CC006000000196667 | Mahesh Kumar Lohia | ITMC Developers Pvt. Ltd. | 07/04/2021 |
| CC006000000196490 | Sunita Rupchand Laungani | ITMC Developers Pvt. Ltd. | 25/03/2021 |
| CC006000000196544 | Adish Jain | ITMC Developer Pvt. Ltd. | 30/03/2021 |
| CC006000000197677 | ITMC Developers Pvt Ltd | Ravindra Laxman Vengurlekar | 20/07/2021 |
| CC006000000198231 | Neelikattu | ITMC Developers Pvt. Ltd. | 04/09/2021 |
| CC006000000209517 | Santosh Kumar Singh | ITMC Developers Pvt. Ltd. | 23/12/2021 |
| CC006000000209519 | Santosh Kumar Singh | M/s. ITMC Developers Pvt Ltd | 23/12/2021 |
| CC006000000251481 | Itmcdeveloper Itmcdeveloper | Sunita Laugani | 15/06/2022 |
| CC12501709 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501698 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501700 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501701 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501702 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501703 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501704 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501705 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501706 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501707 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12501708 | Blessings Infra Developers LLP | ITMC Developers Pvt. Ltd. | 25/05/2025 |
| CC12502929 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502930 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502932 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502933 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502934 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502935 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502936 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502937 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502938 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502939 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12502940 | MANHARBHAI KAKADIA | ITMC Developers Pvt. Ltd. | 20/08/2025 |
| CC12504538 | Mrs Radha Arakkal | ITMC Developers Pvt. Ltd. | 19/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Mar 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed51
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 5)File: sapphire 1.pdf | 28 Sep 2019 |
| Proforma of Allotment letterFile: Draft agreement Sapphire i.pdf | 15 Jan 2019 |
| Certificates of CA (Form 5)File: Sapphire 1.pdf | 13 Oct 2018 |
| Details of encumbrancesFile: Encumbrances Sapphire I.pdf | 30 Mar 2018 |
| Building plan approvalFile: IOD.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 001.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 002.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 003.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 004.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 005.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 006.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 007.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 008.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 009.pdf | 29 Mar 2018 |
| Layout approvalFile: SCAN 010.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 001.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 002.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 003.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 004.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 005.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 006.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 007.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 008.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 009.pdf | 29 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: SCAN 010.pdf | 29 Mar 2018 |
| Building Plan Approval (IOD)File: IOD.pdf | 29 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 29 Mar 2018 |
| Proforma of Allotment letterFile: Final Sappphire.pdf | 6 Nov 2017 |
| Details of encumbrancesFile: Encumbrance Sale 1.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Form B Affidavit powai sale 1.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ceritificate of percentage Powai Sale 1.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate for Sapphire Sales Building No 1 Powai.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate Powai Sale 1.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: AOF Powai Sale 1.pdf | 29 Jul 2017 |
| Building plan approvalFile: ioa.pdf | 25 Jul 2017 |
| Layout approvalFile: scan-001-ok.pdf | 25 Jul 2017 |
| Layout approvalFile: scan-002.pdf | 25 Jul 2017 |
| Layout approvalFile: scan-003.pdf | 25 Jul 2017 |
| Layout approvalFile: scan-004.pdf | 25 Jul 2017 |
| Layout approvalFile: scan-005.pdf | 25 Jul 2017 |
| Layout approvalFile: scan-006.pdf | 25 Jul 2017 |
| PAN CardFile: ITMC DPL_Pan card New.pdf | 25 Jul 2017 |
| Copy of the legal title reportFile: Powai 12140 sq titel.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-001-ok.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-002.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-003.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-004.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-005.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: scan-006.pdf | 25 Jul 2017 |
| Building Plan Approval (IOD)File: ioa.pdf | 25 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC upto 10th floor sale bldg chandan nagar (original).pdf | 25 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 51 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Sapphire I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vikroli East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 182 registered projects within 2 km.
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt
Mumbai Housing And Area Development Board
Om Siddhivinayak CHS and Gurukrupa CHS
Shreeji Developers
AKASSH AMAZONIA TOWER 1
HEER MEHTA LANDMARK DEVELOPERS PRIVATE LIM
Ajmera Solis
Shree Yogi Realcon Private Limited
CENTRAL PARK
V LAXMI NURSES DEVELOPERS LLP
Swastik Platinum
SUVASYA BUILDERS AND DEVELOPERS LLP
See every Mumbai Suburban project, with the district possession charts
Builder: ITMC Developers Pvt. Ltd.
ITMC Developers Pvt. Ltd. has 2 registrations on MahaRERA, including Sapphire I and SSG Springville. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that Sapphire I shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Sapphire I is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sapphire I?
The registered promoter entity is ITMC Developers Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sapphire I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sapphire I?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Sapphire I?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sapphire I?
The professionals named in the filing: Architect: Ellora Project Consultants Pvt Ltd; Engineer: Ellora Project Consultants; Chartered Accountant: Anup B.Agrawal & Co.; Chartered Accountant: Mohandas & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sapphire I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback