SANKALP WINDSOR HOUSE

By SANKALP CONSTRUCTIONS PRIVATE LIMITED

RG-KA-19234 · RERA PRM/KA/RERA/1251/472/PR/151222/005527 · Last updated on RERA Karnataka portal: 18 Nov 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 82 documents Report an error

SANKALP WINDSOR HOUSE is a Residential/Group Housing project by SANKALP CONSTRUCTIONS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/151222/005527 on 15 Dec 2022. Possession is promised by 31 Dec 2025.

At a glance

Project

  • NameSANKALP WINDSOR HOUSE
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/151222/005527
  • ReraGenie IDRG-KA-19234

Builder

  • NameSANKALP CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN29AACCS5166N1ZQ
  • Authorized SignatoryV K JAGADISH BABU
  • Managing DirectorV K JAGADISH BABU
  • DirectorsNIKHIL JAGADISH, GEETHA JAGADISH, V K JAGADISH BABU
  • Project HeadMALLIKARJUNA K S
  • Other registrations13 more →
  • Declared earlier projects19 →

Key dates

this monthRegisteredDec 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Dec 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANKALP WINDSOR HOUSE---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 18 Nov 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 18 Nov 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area894 sq m
Named landowners1
LandownerVillageDistrict
S D MAMATHA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.50 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 6.38 cr-
On-site expenditure-Consultants FeesRs 8.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.50 lakh-
On-site expenditure-Salaries of workersRs 1.00 lakh-
On-site expenditure-Site OverheadRs 1.00 lakh-
Payment of PremiumsRs 1.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectINDRAJIT S KEMBHAVI
EngineerTADIMARY SRINIVASA CHAR VASUDEVAN
Chartered AccountantLOKESH K P

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed82

As listed on the registration, under the names the promoter filed them with; the newest 80 of 82 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/151222/005527 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
BWSSB NOCFile: Water NOC-SWH.pdf18 Nov 2022
Copy of fee paid receipt for BWSSB NOCFile: Water NOC Fees SWH.pdf18 Nov 2022
BESCOM NOCFile: NOC-BESCOM.PDF30 Mar 2022
AFFIDAVIT FOR WATER SUPPLYFile: Affidavit-Water NOC.pdf30 Mar 2022
WATER NOC APPLICATION & ACKNOWLEDGEMENTFile: Water NOC Ack & Appln.pdf30 Mar 2022
Affidavit in lieu of NOC to be issued from CESCOMFile: Affidavit-Electrical.PDF3 Mar 2022
Affidavit in lieu of NOC to be issued from BWSSBFile: Affidavit-Water.PDF3 Mar 2022
Layout plan showing Septic Tank, Soak Pit and Sewer LineFile: plan showing Septic Tank location with section.pdf3 Mar 2022
CA certificateFile: FORM 1 CA SWH.pdf16 Feb 2022
Title of the propertyFile: Legal Opinion SWH Roopa Shetty 27-9-2021.PDF16 Feb 2022
Chain of title documents -Sale Deed for YeshodharaFile: Sale deed-Judicial Layout1.pdf16 Feb 2022
Chain of title documents -Partition Deed in favour of S D MamathaFile: Partition Deed.PDF16 Feb 2022
E-KATHA in the name of S.D. Mamatha issued by BBMPFile: e-Khata S D Mamatha.pdf16 Feb 2022
Sub-registrar Guidance valueFile: Guideline certificate Sankalp Windsor -2022_001.pdf16 Feb 2022
Notarized Non- litigation affidavitFile: Affidavit-Non litigation.pdf16 Feb 2022
EC from 01-04-2004 to up to dateFile: EC SWH 1-4-2004 To 13-2-2022.pdf16 Feb 2022
Building licenseFile: Building Licence.PDF16 Feb 2022
Visible drawingFile: Drawing Lines0425 original.jpg16 Feb 2022
Engineer certificateFile: FORM 3 Eng SWH.PDF16 Feb 2022
Architect certificateFile: Form 2 Arch SWH.PDF16 Feb 2022
Power supply connectionFile: NOC Electricity.pdf16 Feb 2022
Water Supply DeclarationFile: Declaration Affidavit Water Supply SWH.pdf16 Feb 2022
Proforma Agreement of SaleFile: Agreement of Sale SWH RERA.pdf16 Feb 2022
Proforma Sale DeedFile: Sale Deed - SWH RERA.pdf16 Feb 2022
Registration CertificateFile: 16 Incorporation Certificate.pdf-
Organization StructureFile: 19 ORGANIZATION CHART.pdf-
Certificate issued by CA Form 1File: FORM 1 CA SWH.pdf-
Certificate issued by Architect Form 2File: Form 2 Arch SWH.PDF-
Certificate issued by Engineer Form 3File: FORM 3 Eng SWH.PDF-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit-Non litigation.pdf-
Certificate from Chartered AccountFile: CA amount withdrawn N A.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet 202021.pdf-
Balance Sheet 2019 - 2020File: Balance sheet 1920 UDIN.pdf-
Balance Sheet 2018 - 2019File: Balance sheet.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P L 202021.pdf-
Audited Profit and Loss Statement 2019 - 2020File: P L Acco 20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and Loss.pdf-
Director's Report 2020 - 2021File: Board Report 202021.pdf-
Director's Report 2019 - 2020File: Directors report.pdf-
Director's Report 2018 - 2019File: Directors report.PDF-
Cash Flow Statement 2020 - 2021File: CF 202021.pdf-
Cash Flow Statement 2019 - 2020File: cash flow.PDF-
Auditor's Report 2020 - 2021File: Audit Report 202021.pdf-
Auditor's Report 2019 - 2020File: Audit Report 1920.pdf-
Auditor's Report 2018 - 2019File: Auditors report.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR6 A Y 202122.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR V 20.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR 6 V.pdf-
Commencement Certificate-
Electricity bill SWH-
Drawing Lines 0425-
Drawing Lines 0425-
Drawing Lines 0425-
JDA-
Proforma of Agmt for Sale SWH-
Allotment Letter Proforma-
Form B-
Affidavit-
Joint affidavit cum declaration-
Electricity bill SWH-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Loan raised documentFile: Windsor SBI - NOC - Loan Ac No 9984.pdf-

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 not delivered by the promised date2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SANKALP SQUARENO.363/10/11A/1 LOTTEGOLLAHALLI WARD NO.008 YELAHANKAOngoingMar 2026Not delivered
SANKALP TIARANO.106 8TH MAIN JAYALAKSHMIPURAM DEVARAJ MOHALLAOngoingJul 2025Not delivered
SANKALP SKY VILLASNO.1155 AND 1156 VIJAYANAGAR 1ST STAGE DEVARAJ MOHALLAOngoingApr 2024Not delivered
SANKALP IMPERIAL HOUSENO.677 N3 VASANTH MAHAL ROAD NAZARBAD MOHALLAOngoingMar 2024Not delivered
SANKALP TEMPLE TREESy No 96/1 Vijayanagar 4th Stage, 2nd Phase RMP Layout Near Ring Road, Basavana Halli, MysoreOngoingMar 2023Not delivered
SANKALP REGIESNO.418 CONTOUR ROAD GOKULAM 3RD STAGECompleted-No date filed
SANKALP MAGNUMNO.13/A INDUSTRIAL SUBURB KHILLE MOHALLA J P NAGAR MYSURUCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SANKALP WINDSOR HOUSE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSANKALP WINDSOR HOUSEOther 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: SANKALP CONSTRUCTIONS PRIVATE LIMITED

SANKALP CONSTRUCTIONS PRIVATE LIMITED has 14 registrations on RERA Karnataka, including SANKALP WINDSOR HOUSE and SANKALP SQUARE. Its filings declare 19 earlier projects, 8 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SANKALP WINDSOR HOUSE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SANKALP WINDSOR HOUSE?

The registered promoter entity is SANKALP CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its GSTIN 29AACCS5166N1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SANKALP WINDSOR HOUSE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SANKALP WINDSOR HOUSE?

The professionals named in the filing: Architect: INDRAJIT S KEMBHAVI; Engineer: TADIMARY SRINIVASA CHAR VASUDEVAN; Chartered Accountant: LOKESH K P. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANKALP WINDSOR HOUSE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANKALP WINDSOR HOUSE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANKALP WINDSOR HOUSE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.