SANKALP CROWN PHASE 2
By SANKALP CONSTRUCTIONS PRIVATE LIMITED
RG-KA-91269 · RERA PRM/KA/RERA/1268/378/PR/180823/006182 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
SANKALP CROWN PHASE 2 is a Residential/Group Housing project by SANKALP CONSTRUCTIONS PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/180823/006182 on 18 Aug 2023. Possession is promised by 31 Mar 2029. 137 of the 208 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.
At a glance
Project
- NameSANKALP CROWN PHASE 2
- TypeResidential/Group Housing
- Location
- MYSORE
- 570020
- Pincode570020
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1268/378/PR/180823/006182
- ReraGenie IDRG-KA-91269
Builder
- NameSANKALP CONSTRUCTIONS PRIVATE LIMITED
- Entity typeCompany
- CINU45201KA1989PTC010315
- GSTIN29AACCS5166N1ZQ
- Authorized SignatoryV K Jagadish Babu
- Managing DirectorV K Jagadish Babu
- DirectorsV K Jagadish Babu, Geetha Jagadish, Nikhil Jagadish
- Project HeadNataraj G
- Other registrations11 more →
- Declared earlier projects19 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Aug 2023
- Promised completion31 Mar 2029
- Revised completionNone
- Buildings2 building records
- Documents filed102 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 2 | - | - | - | 104 | 0 | 104 |
| TOWER 3 | - | - | - | 104 | 0 | 104 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 97%.
Building: 51% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 97% |
| Upto Plinth Level | 95% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 75% |
| Retaining wall (All types) | 80% |
| RCC or MS Framed structure | 90% |
| Masonry Construction | 85% |
| Plastering inside , outside & Ceiling | 65% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 50% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 20% |
| Railing and Grill fixing | 60% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 8% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 50% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 45% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 20% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 65% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 10% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 60% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 80% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 65% |
| Fire escapes | Yes | 60% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 40% |
| Basement | Yes | 80% |
| Terrace | Yes | 75% |
| Outer Wall | Yes | 70% |
| Open parking areas | Yes | 40% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shalom Voyagers Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 62.80 cr | Rs 4.79 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 4.00 cr | Rs 57.23 lakh |
| On-site expenditure-Salaries of workers | Rs 1.40 cr | Rs 9.50 lakh |
| On-site expenditure-Consultants Fees | Rs 1.20 cr | - |
| On-site expenditure-Site Overhead | Rs 80.00 lakh | - |
| Payment of taxes | Rs 70.00 lakh | Rs 1.06 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 60.00 lakh | Rs 1.64 lakh |
| Payment of charges | Rs 30.00 lakh | - |
| Payment of Premiums | Rs 20.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Jamuna Chalam |
| Engineer | Arun Kumar S.N. |
| Chartered Accountant | Santosh K L |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed102
As listed on the registration, under the names the promoter filed them with; the newest 80 of 102 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/180823/006182 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SCN2 - F4 CA Cert (QU) Sep-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: SCN2 - F5 Architect Cert (QU) Sept-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: SCN2 - F6 Engineer Cert (QU) Sept-2026.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SCN2 - F4 CA Cert (QU) June-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: SCN2 - F5 Architect Cert (QU) June-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: SCN2 - F6 Engineer Cert (QU) June-2026.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SCN2 - F4 CA Cert (QU) Mar-2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: SCN2 - F5 Architect Cert (QU) Mar-2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: SCN2 - F6 Engineer Cert (QU) Mar-2026.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SCN2 - F4 CA Cert (QU) Dec-2025.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: SCN2 - F5 Architect Cert (QU) Dec-2025.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: SCN2 - F6 Engineer Cert (QU) Dec-2025.pdf | 15 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 15 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 15 Jan 2026 |
| Audited Financial Statements with UDIN along with schedules for FY 2020-21File: Audited Financial Statements FY 2020-21.pdf | 8 Aug 2023 |
| Audited Financial Statements with UDIN along with schedules for FY 2021-22File: Audited Financial Statements FY 2021-22.pdf | 8 Aug 2023 |
| Audited Financial Statements with UDIN along with schedules for FY 2022-23File: Audited Financial Statements FY 2022-23.pdf | 8 Aug 2023 |
| Sources of funds to complete the projectFile: Sources of Funds.pdf | 8 Aug 2023 |
| Change of land use orderFile: Change of Land Use.pdf | 8 Aug 2023 |
| Khatha certificate and extractFile: Khatha Certificate.PDF | 8 Aug 2023 |
| NOC from HDFCFile: HDFC NOC.pdf | 8 Aug 2023 |
| Certified carpet areasFile: Certified Carpet area calculations.pdf | 8 Aug 2023 |
| Village map showing the proposed siteFile: Village map of the site.pdf | 8 Aug 2023 |
| Registered relinquishment deedFile: Relinquishment Deed.pdf | 8 Aug 2023 |
| Sanctioned drawings of ground and basement planFile: Sanctioned drawing of ground floor and basement plan.pdf | 8 Aug 2023 |
| Sanctioned drawings from 1st Floor to Terrance Floor planFile: Sanctioned drawings from 1st Floor to Terrace Floor.pdf | 8 Aug 2023 |
| Engineer licence certificateFile: Registration Certificate - Engineer.pdf | 8 Aug 2023 |
| Certificate from Registered Engineer indicating the structural safetyFile: Structural Stability Certificate.pdf | 8 Aug 2023 |
| CESCOM NOCFile: CESCOM NOC.pdf | 8 Aug 2023 |
| Registration CertificateFile: Company Registration Certificate.pdf | - |
| Organization StructureFile: Organization Structure.pdf | - |
| Certificate issued by CA Form 1File: Certificate issued by Chartered Accountant.pdf | - |
| Certificate issued by Architect Form 2File: Certificate issued by Architect.pdf | - |
| Certificate issued by Engineer Form 3File: Certificate issued by Engineer.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Affidavit Non-Litigation.pdf | - |
| Balance Sheet 2021 - 2022File: Balance Sheet - FY 2022-2023.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet - FY 2021-2022.pdf | - |
| Balance Sheet 2019 - 2020File: Balance Sheet - FY 2020-2021.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: Profit and Loss Statement - FY 2022-23.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: Profit and Loss Statement - FY 2021-22.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Profit and Loss Statement - FY 2020-21.pdf | - |
| Director's Report 2021 - 2022File: Director's Report - FY 2022-2023.pdf | - |
| Director's Report 2020 - 2021File: Director's Report - FY 2021-2022.pdf | - |
| Director's Report 2019 - 2020File: Director's Report - FY 2020-2021.pdf | - |
| Cash Flow Statement 2021 - 2022File: Cash Flow Statement - FY 2022-2023.pdf | - |
| Cash Flow Statement 2020 - 2021File: Cash Flow Statement - FY 2021-2022.pdf | - |
| Auditor's Report 2021 - 2022File: Auditor's Report - FY 2022-2023.pdf | - |
| Auditor's Report 2020 - 2021File: Auditor's Report - FY 2021-22.pdf | - |
| Auditor's Report 2019 - 2020File: Auditor's Report - FY 2020-2021.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: Income Tax Return Acknowledgemt - FY 2021-2022.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: Income Tax Return Acknowledgemt - FY 2020-2021.pdf | - |
| Form of Sanction | - |
| Electricity Permission from CESCOM | - |
| Water Permission | - |
| Demarcated Area Plan - Phase 2 | - |
| Floor Plan of the apartments | - |
| Project Specifications | - |
| Section and Elevation | - |
| Legal Scrutiny Report | - |
| Joint Development Agreement and Power of Attorney | - |
| Change of Land Use | - |
| Sale Deed | - |
| Proforma Agreement for Sale - SANKALP CROWN PHASE 2 | - |
| Proforma Allotment Letter | - |
| Clarification on non-production of brochure | - |
| Declaration (Form B) | - |
| Section 3(1) Notarized Affidavit | - |
| JD Affidavit Cum Declaration | - |
| Electricity | - |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| SANKALP CROWN PHASE 1 | Site No. 15 and 16, 1st Main Road (Jawa Main Road), Devaraja Mohalla, Yadavagiri | Ongoing | Mar 2028 | Not due yet |
| SANKALP WINDSOR HOUSE | BBMP Khata No.1528/1493/1412 (SITE NO.1412), Judicial Layout Jakkur Plantation Village Yelahanka Ward , Bengaluru North , Yelahanka | Ongoing | Dec 2025 | Not delivered |
| SANKALP TIARA | No 106 8th Main , Jayalakshmi Puram, Devaraja Mohalla, Mysore | Ongoing | Jul 2025 | Not delivered |
| SANKALP SQUARE | 363/10/11A/1 Lottegollahalli, Ward No 008, Yelahanka, Bengaluru | Ongoing | Mar 2025 | Not delivered |
| SANKALP IMPERIAL HOUSE | No 677 N3 Vasanth Mahal Road, Nazarbad Mohalla, Mysore | Ongoing | Mar 2024 | Not delivered |
| SANKALP TEMPLE TREE | Sy No 96/1 Vijayanagar 4th Stage, 2nd Phase RMP Layout Near Ring Road, Basavana Halli, Mysore | Completed | - | No date filed |
| SANKALP SKY VILLAS | 1155 and 1156, Vijayanagar 1st Stage, Devaraja Mohalla, Mysore | Completed | - | No date filed |
| SANKALP REGIES | 418, Contoor Road, Gokulam 3rd Stage, Mysore | Completed | - | No date filed |
| SANKALP MAGNUM | 13/A, Industrial Suburb, 3rd Stage, Kille Mohalla, Mysore | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mysore
Computed across the 700+ Mysore projects on ReraGenie, from their own filings.
Keep SANKALP CROWN PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mysore700+ in Mysore
Filed coordinates, straight-line distance. 13 registered projects within 2 km.
SANKALP CROWN PHASE 1
SANKALP CONSTRUCTIONS PRIVATE LIMITED
SANKALP CENTRAL PHASE 3B
SANKALP CONSTRUCTIONS PRIVATE LIMITED
SANKALP CENTRAL PHASE 3A
SANKALP CONSTRUCTIONS PRIVATE LIMITED
SANKALP CROWN PHASE 2B
SANKALP CONSTRUCTIONS PRIVATE LIMITED
Juniper Hill
Vasya Builder and Consultants
Elite vista 27
ELITE PRODUCTS MYSORE
See every Mysore project, with the district possession charts
Builder: SANKALP CONSTRUCTIONS PRIVATE LIMITED
SANKALP CONSTRUCTIONS PRIVATE LIMITED has 12 registrations on RERA Karnataka, including SANKALP WELLINGTON PARK and Sankalp Magnum. Its filings declare 19 earlier projects, 13 of them declared completed. Read the full track record. See more projects on the Mysore district page.
Frequently asked questions
What are my rights if SANKALP CROWN PHASE 2 is delayed beyond 31 Mar 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SANKALP CROWN PHASE 2?
The registered promoter entity is SANKALP CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA1989PTC010315 and GSTIN 29AACCS5166N1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SANKALP CROWN PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SANKALP CROWN PHASE 2?
The professionals named in the filing: Architect: Jamuna Chalam; Engineer: Arun Kumar S.N.; Chartered Accountant: Santosh K L. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SANKALP CROWN PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback