ReraGenieLog inGet a buyer report

Home / Browse projects / Mysore, Karnataka / SANKALP CENTRAL PHASE 3A

Registration approved No litigation declared Residential/Group Housing project

SANKALP CENTRAL PHASE 3A

By SANKALP CONSTRUCTIONS PRIVATE LIMITED

RG-KA-09038 · RERA PRM/KA/RERA/1268/378/PR/180424/006798 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2030Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 95%
77 of 142Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 123 documents Report an error

SANKALP CENTRAL PHASE 3A is a Residential/Group Housing project by SANKALP CONSTRUCTIONS PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/180424/006798 on 18 Apr 2024. Possession is promised by 30 Jun 2030. 65 of the 142 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameSANKALP CENTRAL PHASE 3A
  • TypeResidential/Group Housing
  • Location
    • MYSORE
    • 570020
  • Pincode570020
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/180424/006798
  • ReraGenie IDRG-KA-09038

Builder

  • NameSANKALP CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201KA1989PTC010315
  • GSTIN29AACCS5166N1ZQ
  • Authorized SignatoryV K Jagadish Babu
  • Managing DirectorV K Jagadish Babu
  • DirectorsV K Jagadish Babu, Geetha Jagadish, Nikhil Jagadish
  • Project HeadNataraj G
  • Other registrations11 more →
  • Declared earlier projects19 →

Key dates

this monthRegisteredApr 2024PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Apr 2024
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings4 building records
  • Documents filed123 files

Current status

46%65 of 142 units booked
9.2%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING - J---47047
WING - K---32032
WING - L---47047
WING - M---16016

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 95%.

Building: 21% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work95%
Foundation footing work90%
Upto Plinth Level80%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)40%
Retaining wall (All types)15%
RCC or MS Framed structure45%
Masonry Construction7%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes30%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes25%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes35%
TerraceYes0%
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,784 sq m
Named landowners1
LandownerVillageDistrict
Shalom Voyagers Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 78.84 cr
Cost incurredRs 7.29 cr
Spent of the estimate9.25%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 63.85 crRs 6.90 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 6.11 crRs 20.41 lakh
On-site expenditure-Site OverheadRs 4.15 crRs 1.23 lakh
On-site expenditure-Salaries of workersRs 2.17 crRs 9.00 lakh
On-site expenditure-Consultants FeesRs 1.61 crRs 6.64 lakh
Payment of taxesRs 57.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 38.00 lakhRs 1.19 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJamuna Chalam
EngineerArun Kumar S.N.
Chartered AccountantSantosh K L

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed123

As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/180424/006798 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SCP3A - F4 CA Cert (QU) Sep-2026.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: SCP3A - F5 Architect Cert (QU) Sept-2026.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: SCP3A - F6 Engineer Cert (QU) Sept-2026.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Airport Authority of India14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: SCP3A - F4 CA Cert (QU) June-2026.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: SCP3A - F5 Architect Cert (QU) June-2026.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: SCP3A - F6 Engineer Cert (QU) June-2026.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q1 2026-27 Airport Authority of India14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SCP3A - F4 CA Cert (QU) Mar-2026.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: SCP3A - F5 Architect Cert (QU) Mar-2026.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: SCP3A - F6 Engineer Cert (QU) Mar-2026.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: SCP3A - F4 CA Cert (QU) Dec-2025.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: SCP3A - F5 Architect Cert (QU) Dec-2025.pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: SCP3A - F6 Engineer Cert (QU) Dec-2025.pdf15 Jan 2026
Q3 2025-26 Water supply and sewage board15 Jan 2026
Q3 2025-26 KPTCL- BESCOM15 Jan 2026
Sources of funds to complete the projectFile: Sources of funds to complete the project - SCP3A.pdf8 Apr 2024
CA CertificateFile: CA Certificate-SCP3A.pdf28 Mar 2024
Supporting document for Sources of funds to complete the projectFile: Sources of funds - SCP3A.pdf28 Mar 2024
Bank account affidavitFile: Bank Affidavit - SCP3A.pdf28 Mar 2024
Court orderFile: Court of order of honourable High Court of Karnataka.pdf28 Mar 2024
Sale DeedFile: Sale Deed in favour of Land Owner.pdf28 Mar 2024
Change of land use orderFile: Change of Land Use.pdf28 Mar 2024
Khatha extractFile: Khatha Certificate.PDF28 Mar 2024
Area Calculations certified by EngineerFile: Area Calculations - SCP3A.pdf28 Mar 2024
Development plan (single plot plan)File: Development Plan - Single Layout plan.PDF28 Mar 2024
Development plan (single plot layout) orderFile: DP - Single Layout plan order.PDF28 Mar 2024
CDP map showing the proposed siteFile: CDP map.jpg28 Mar 2024
Village map showing the proposed siteFile: Village map of the site.pdf28 Mar 2024
Form of Sanction (Building license)File: Form of Sanction - Building Licence.pdf28 Mar 2024
Demarcated Site PlanFile: Demarcated Site Plan - SCP3A.png28 Mar 2024
Floor PlansFile: Floor plans.jpg28 Mar 2024
Section of BuildingFile: Section of Building.jpg28 Mar 2024
Elevation PlanFile: Elevation Plan.jpg28 Mar 2024
CLU order for proposed site number/sy numberFile: Change of Land Use.pdf28 Mar 2024
DP orderFile: DP - Single Layout plan order.PDF28 Mar 2024
Area calculation sheet certified by the EngineerFile: Area Calculations - SCP3A.pdf28 Mar 2024
Self-attested copy of engineer license certificateFile: Engineer Registration Certificate.pdf28 Mar 2024
STP flow chartFile: STP Flow Chart.pdf28 Mar 2024
Self-attested copy of the NOC issued by Fire ForceFile: Self-attested Fire NOC.pdf28 Mar 2024
Self-attested copy of the NOC issued by CESCOMFile: Self-attested CESCOM NOC.pdf28 Mar 2024
Self-attested copy of the NOC issued for Water SupplyFile: Self-attested Water NOC.pdf28 Mar 2024
Self-attested Airport NOCFile: Self-attested Airport NOC.pdf28 Mar 2024
Self-attested land cost calculation sheetFile: Land cost calculation - SCP3A.pdf28 Mar 2024
Proforma Agreement for SaleFile: Proforma Agreement for Sale-SCP3A.pdf28 Mar 2024
Estimated cost duly certified by the engineerFile: Estimated cost of construction - SCP3A.pdf28 Mar 2024
Registration CertificateFile: Company Registration Certificate.pdf-
Organization StructureFile: Organization Structure.pdf-
Certificate issued by CA Form 1File: Certificate issued by Chartered Accountant.pdf-
Certificate issued by Architect Form 2File: Certificate issued by Architect.pdf-
Certificate issued by Engineer Form 3File: Certificate issued by Engineer.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit Non-Litigation.pdf-
Balance Sheet 2022 - 2023File: Balance Sheet with CA UDIN alongwith schedules FY 2022-23.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet with CA UDIN alongwith schedules FY 2021-22.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet with CA UDIN alongwith schedules FY 2020-21.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss Account with CA UDIN alongwith schedules FY 2022-23.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Profit and Loss Account with CA UDIN alongwith schedules FY 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit and Loss Account with CA UDIN alongwith schedules FY 2020-21.pdf-
Director's Report 2022 - 2023File: Director's Report - FY 2022-2023.pdf-
Director's Report 2021 - 2022File: Director's Report - FY 2021-2022.pdf-
Director's Report 2020 - 2021File: Director's Report - FY 2020-2021.pdf-
Cash Flow Statement 2022 - 2023File: Cash Flow Statement - FY 2022-2023.pdf-
Cash Flow Statement 2021 - 2022File: Cash Flow Statement - FY 2021-2022.pdf-
Auditor's Report 2022 - 2023File: Auditor's Report - FY 2022-2023.pdf-
Auditor's Report 2021 - 2022File: Auditor's Report - FY 2021-22.pdf-
Auditor's Report 2020 - 2021File: Auditor's Report - FY 2020-2021.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Income Tax Return Acknowledgemt - FY 2022-2023.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Income Tax Return Acknowledgemt - FY 2021-2022.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Income Tax Return Acknowledgemt - FY 2020-2021.pdf-
Form of Sanction - SCP3-
Electricity permission from CESCOM-

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 not delivered by the promised date2 under way, not due yet5 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SANKALP CROWN PHASE 2Site No. 15 and 16, 1st Main Road (Jawa Main Road), Yadavagiri, Devaraja MohallaOngoingMar 2029Not due yet
SANKALP CROWN PHASE 1Site No. 15 and 16, 1st Main Road (Jawa Main Road), Yadavagiri, Devaraja MohallaOngoingMar 2028Not due yet
SANKALP WINDSOR HOUSEBBMP Khata No.1528/1493/1412 (SITE NO.1412), Judicial Layout Jakkur Plantation Village Yelahanka Ward , Bengaluru North , YelahankaOngoingDec 2025Not delivered
SANKALP SQUARE363/10/11A/1 Lottegollahalli, Ward No 008, Yelahanka, BengaluruOngoingMar 2025Not delivered
SANKALP IMPERIAL HOUSENo 677 N3 Vasanth Mahal Road, Nazarbad Mohalla, MysoreOngoingMar 2024Not delivered
SANKALP TIARANo 106 8th Main , Jayalakshmi Puram, Devaraja Mohalla, MysoreCompleted-No date filed
SANKALP TEMPLE TREESy No 96/1 Vijayanagar 4th Stage, 2nd Phase RMP Layout Near Ring Road, Basavana Halli, MysoreCompleted-No date filed
SANKALP SKY VILLAS1155 and 1156, Vijayanagar 1st Stage, Devaraja Mohalla, MysoreCompleted-No date filed
SANKALP REGIES418, Contoor Road, Gokulam 3rd Stage, MysoreCompleted-No date filed
SANKALP MAGNUM13/A, Industrial Suburb, 3rd Stage, Kille Mohalla, MysoreCompleted-No date filed

How this compares with Mysore

46%of this project is bookeddistrict median 34%
28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep SANKALP CENTRAL PHASE 3A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmSANKALP CENTRAL PHASE 3AOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: SANKALP CONSTRUCTIONS PRIVATE LIMITED

SANKALP CONSTRUCTIONS PRIVATE LIMITED has 12 registrations on RERA Karnataka, including SANKALP WELLINGTON PARK and Sankalp Magnum. Its filings declare 19 earlier projects, 13 of them declared completed. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if SANKALP CENTRAL PHASE 3A is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SANKALP CENTRAL PHASE 3A?

The registered promoter entity is SANKALP CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA1989PTC010315 and GSTIN 29AACCS5166N1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SANKALP CENTRAL PHASE 3A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SANKALP CENTRAL PHASE 3A?

The professionals named in the filing: Architect: Jamuna Chalam; Engineer: Arun Kumar S.N.; Chartered Accountant: Santosh K L. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANKALP CENTRAL PHASE 3A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANKALP CENTRAL PHASE 3A. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANKALP CENTRAL PHASE 3A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.