Home / Browse projects / Bengaluru Rural, Karnataka / SANJEEVINI AARKA
SANJEEVINI AARKA
By SANJEEVINI PROPERTIES PRIVATE LIMITED
RG-KA-16600 · RERA PRM/KA/RERA/1250/304/PR/191126/009117 · Last updated on RERA Karnataka portal: 16 Nov 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out every unit and the land chain as filed and places this filing against the promoter's other registrations and every project registered within 2 km.
See what the report covers Free either way: .Saved.
SANJEEVINI AARKA is a Residential/Group Housing project by SANJEEVINI PROPERTIES PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/191126/009117 on 19 Nov 2026. Possession is promised by 30 Sep 2029.
At a glance
Project
- NameSANJEEVINI AARKA
- TypeResidential/Group Housing
- Location
- Hosakote
- Bengaluru Rural
- 560067
- Pincode560067
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/304/PR/191126/009117
- ReraGenie IDRG-KA-16600
Builder
- NameSANJEEVINI PROPERTIES PRIVATE LIMITED
- Entity typeCompany
- CINU45309KA2016PTC097494
- GSTIN29AAXCS8174K1Z5
- Authorized SignatorySuresh H A
- Managing DirectorUmesh Gowda H A
- DirectorsUmesh Gowda H A, Suresh H A, Venkatalakshmamma, Ashagowda, Banu Priya
- Project HeadSuresh H A
- Other registrations1 more →
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on19 Nov 2026
- Promised completion30 Sep 2029
- Revised completionNone
- Buildings3 building records
- Documents filed127 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Block | - | - | - | 68 | 0 | 68 |
| B Block | - | - | - | 80 | 0 | 80 |
| C Block | - | - | - | 41 | 0 | 41 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 16 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 16 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership6
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Kavitha H L | - | - |
| Veena H S | - | - |
| Kiran Hoskote Srinivas | - | - |
| Bharathi H S | - | - |
| Chethan H L | - | - |
| Prabhamani H K | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 69.64 cr | - |
| Payment of taxes | Rs 6.74 cr | - |
| On-site expenditure-Site Overhead | Rs 6.59 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 5.68 cr | - |
| On-site expenditure-Consultants Fees | Rs 1.06 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Deekshith Kumar E |
| Engineer | Chanakya N |
| Chartered Accountant | Nirmala Sreenivasulu |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed127
As listed on the registration, under the names the promoter filed them with; the newest 80 of 127 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/191126/009117 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| kindly upload proper water supply NOC pertaining to water supply assurance/affidavit regarding respoFile: affidavit for water noc.pdf | 16 Nov 2026 |
| Covering LetterFile: Covering letter to RERA.pdf | 13 Nov 2026 |
| Loan amount should be deposited into RERA designated account as per notification dated 19/07/2023File: Declaration for Project Loan merged.pdf | 13 Nov 2026 |
| What are all the sources of funds to complete the project? With supporting documentsFile: source of funds Merged.pdf | 13 Nov 2026 |
| connected MR showing flow of titles in favour of landownerFile: MR.pdf | 13 Nov 2026 |
| Defect free EC from 1-4-2011 to till dateFile: EC Merged.pdf | 13 Nov 2026 |
| Advocate search reportFile: Advocate search report.pdf | 13 Nov 2026 |
| ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR Certified survey sketch.pdf | 13 Nov 2026 |
| Approved building plan - Original CopyFile: Plan Merged.pdf | 13 Nov 2026 |
| Building LicenseFile: building license.pdf | 13 Nov 2026 |
| Upload all original sanctioned drawings, floor plan, sectional drawings and elevationsFile: Plan Merged.pdf | 13 Nov 2026 |
| Details of amenities and facilities provided as per plan. thereof including fire fighting facilitiesFile: Declaration for Amenities.pdf | 13 Nov 2026 |
| Brochure of the project with amenities detailsFile: aminities and brouchure_compressed.pdf | 13 Nov 2026 |
| Latitude and Longitude of the proposed project does not match with the project locationFile: Declaration for latitude and Longitude.pdf | 13 Nov 2026 |
| Kindly upload the approved planFile: Plan Merged.pdf | 13 Nov 2026 |
| Upload approved sectional drawingsFile: Plan Merged.pdf | 13 Nov 2026 |
| Kindly update the escrow account details properly and possession date in AFSFile: Proforma for Agreement of Sale.pdf | 13 Nov 2026 |
| Kindly upload proper water supply NOC pertaining to water supply assuranceFile: Declaration for Source of Water merged.pdf | 13 Nov 2026 |
| upload SEIAA NOCFile: SEIAA NOC.pdf | 13 Nov 2026 |
| Uploaded units are not matching with the KSPCB NOC UnitsFile: KSPCB DECLARATION.pdf | 13 Nov 2026 |
| Borewell ImagesFile: Image 1.jpeg | 13 Nov 2026 |
| Borewell ImagesFile: Image 2.jpeg | 13 Nov 2026 |
| Borewell ImagesFile: Image 3.jpeg | 13 Nov 2026 |
| Borewell ImagesFile: Image 4.jpeg | 13 Nov 2026 |
| Borewell ImagesFile: Image 5.jpeg | 13 Nov 2026 |
| Kindly upload brief project estimation with licenced engineer signatureFile: Merged Brief Estimated Cost Certified by Engineer.pdf | 13 Nov 2026 |
| Kindly upload the Land cost calculation sheet as per the guidance value(Self-attested copy) along wiFile: Land cost Declaration merged.pdf | 13 Nov 2026 |
| Guidance ValueFile: Guidence value Self Attested.pdf | 13 Nov 2026 |
| RTC, survey 130/2 | - |
| Mutation, survey 130/2 | - |
| Encumbrance Certificate, survey 130/2 | - |
| Conversion/Alienation Order, survey 130/2 | - |
| Sale/Title/Gift Deed, survey 130/2 | - |
| JDA, survey 130/2 | - |
| Khatha, survey 130/2 | - |
| RTC, survey 130/3 | - |
| Mutation, survey 130/3 | - |
| Encumbrance Certificate, survey 130/3 | - |
| Conversion/Alienation Order, survey 130/3 | - |
| Sale/Title/Gift Deed, survey 130/3 | - |
| JDA, survey 130/3 | - |
| Khatha, survey 130/3 | - |
| RTC, survey 130/4 | - |
| Mutation, survey 130/4 | - |
| Encumbrance Certificate, survey 130/4 | - |
| Conversion/Alienation Order, survey 130/4 | - |
| Sale/Title/Gift Deed, survey 130/4 | - |
| JDA, survey 130/4 | - |
| Khatha, survey 130/4 | - |
| RTC, survey 130/5 | - |
| Mutation, survey 130/5 | - |
| Encumbrance Certificate, survey 130/5 | - |
| Conversion/Alienation Order, survey 130/5 | - |
| Sale/Title/Gift Deed, survey 130/5 | - |
| JDA, survey 130/5 | - |
| Khatha, survey 130/5 | - |
| RTC, survey 130/6 | - |
| Mutation, survey 130/6 | - |
| Encumbrance Certificate, survey 130/6 | - |
| Conversion/Alienation Order, survey 130/6 | - |
| Sale/Title/Gift Deed, survey 130/6 | - |
| JDA, survey 130/6 | - |
| Khatha, survey 130/6 | - |
| RTC, survey 130/7 | - |
| Mutation, survey 130/7 | - |
| Encumbrance Certificate, survey 130/7 | - |
| Conversion/Alienation Order, survey 130/7 | - |
| Sale/Title/Gift Deed, survey 130/7 | - |
| JDA, survey 130/7 | - |
| Khatha, survey 130/7 | - |
| Registration CertificateFile: Cetificate of incorporation pvt ltd.pdf | - |
| Memorandum of AssociationFile: MOA.pdf | - |
| Article of AssociationFile: AOA.pdf | - |
| GST CertificateFile: GST Certificate.pdf | - |
| Organization StructureFile: Cetificate of incorporation pvt ltd.pdf | - |
| Certificate issued by CA Form 1File: Final FOrm 1.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect.pdf | - |
| Certificate issued by Engineer Form 3File: Form -3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| The Adwaith by Sanjeevini | Sy. No. 116/2, 116/5, 116/13, 116/14, 116/15, 117/14, 117/7, 117/6 and 117/9, Gunjurpalya Village, Gunjur Post, Varthur Hobli, Bangalore East | Ongoing | Jul 2028 | Not due yet |
| Sanjeevini Vaibhav | Site No. 167, Old No. 42, Pattandura Agrahara Village, K R Puram Hobli, Bangalore East Taluk | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 660+ Bengaluru Rural projects on ReraGenie, from their own filings.
Free quarterly report: Bengaluru Rural on RERA Karnataka, quarter by quarter. What registered each quarter, the flat types and carpet areas being built, the taluks and the completion pipeline, from these same filings.
Buyer report
Built from this project's RERA Karnataka filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Every unit as filed, tower by tower: carpet area, undivided share of the land and parking, with the sizes placed against the other projects of the taluk
- The land chain survey by survey: conversion order, deed, khata and joint development, in date order
- Joined against the promoter's other registrations on RERA Karnataka and every project registered within 2 km, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep SANJEEVINI AARKA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural660+ in Bengaluru Rural
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
DS MAX SKY FIELDS
DS Max Properties Private Limited
Sowparnika Rhythm of Rain
SOWPARNIKA HOMES PRIVATE LIMITED
WORLD OF GARDENS
RLP TRENDSQUARES PROJECTS PRIVATE LIMITED
DS MAX SKYSAMPURN
DS MAX PROPERTIES PRIVATE LIMITED
Amrutha Lake Vista
Amrutha Shelters Private Limited
See every Bengaluru Rural project, with the district possession charts
Builder: SANJEEVINI PROPERTIES PRIVATE LIMITED
SANJEEVINI PROPERTIES PRIVATE LIMITED has 2 registrations on RERA Karnataka, including SANJEEVINI AARKA and THE ADWAITH BY SANJEEVINI. Its filings declare 2 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if SANJEEVINI AARKA is delayed beyond 30 Sep 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of SANJEEVINI AARKA?
The registered promoter entity is SANJEEVINI PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U45309KA2016PTC097494 and GSTIN 29AAXCS8174K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in SANJEEVINI AARKA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at SANJEEVINI AARKA?
The professionals named in the filing: Architect: Deekshith Kumar E; Engineer: Chanakya N; Chartered Accountant: Nirmala Sreenivasulu. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SANJEEVINI AARKA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback