Home / Browse projects / Bengaluru Rural, Karnataka / Sowparnika Rhythm of Rain

Registration approved No litigation declared Residential/Group Housing project

Sowparnika Rhythm of Rain

By SOWPARNIKA HOMES PRIVATE LIMITED

RG-KA-38593 · RERA PRM/KA/RERA/1250/304/PR/290125/007454 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jan 2032Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 98%
22 of 725Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 182 documents Report an error

Sowparnika Rhythm of Rain is a Residential/Group Housing project by SOWPARNIKA HOMES PRIVATE LIMITED in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/290125/007454 on 29 Jan 2025. Possession is promised by 15 Jan 2032. 703 of the 725 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameSowparnika Rhythm of Rain
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
    • 560067
  • Pincode560067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/304/PR/290125/007454
  • ReraGenie IDRG-KA-38593

Builder

  • NameSOWPARNIKA HOMES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45400KA2014PTC074654
  • GSTIN29AAUCS5844F1ZO
  • Authorized SignatoryMEENAKSHI RAMJI
  • DirectorsMEENAKSHI RAMJI, S SREENIVASAN, MEENAKSHI RAMJI
  • Project HeadM. Arun Kumar
  • Other registrations4 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2025PromisedJan 2032

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Jan 2025
  • Promised completion15 Jan 2032
  • Revised completionNone
  • Buildings1 building record
  • Documents filed182 files

Current status

97%703 of 725 units booked
29.8%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building---7250725

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 98%.

Building: 23% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work98%
Foundation footing work95%
Upto Plinth Level95%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)70%
Retaining wall (All types)40%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing10%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work10%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallNoNot applicable
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,796 sq m
Named landowners8
LandownerVillageDistrict
SOWPARNIKA HOMES PRIVATE LIMITED--
Sowparnika Homes Private Limited--
Sowparnika Homes Private Limited--
Sowparnika Homes Private Limited--
Sowparnika Homes Private Limited--
Sowparnika Homes Private Limited--
Sowparnika Homes Private Limited--
Sowparnika Homes Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 484.23 cr
Cost incurredRs 144.17 cr
Spent of the estimate29.77%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 261.15 crRs 57.69 cr
Project Scheme CostRs 63.18 cr-
Project Marketing CostRs 58.76 cr-
Project Adminstration CostRs 54.84 crRs 48.13 cr
Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for constructionRs 45.00 crRs 38.35 cr
Payment of chargesRs 1.31 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANIRAJ D
EngineerVAIBHAV KUMAR J G
Chartered AccountantCHITTEPU YESHWANT REDDY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed182

As listed on the registration, under the names the promoter filed them with; the newest 80 of 182 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/290125/007454 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 ROR Q2 2627.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate ROR Q1 2627.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Rhythm of Rain -Q2 2627.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4, Rhythm of Rain-FY 25-26 Q1 (2).pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate ROR Q1 2627.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Rhythm of Rain -Q1 2627.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4, CA (QU) Rhythm of Rain compressed.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form - 5 - Architect Certificate (QU) Rhytham of Rain Q4.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 - Rhythm of Rain (QU)-Q4.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Rhythm of Rain.pdf13 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate QU Rhytham of Rain Q3 compressed.pdf13 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Rhythm of Rain QU Q3.pdf13 Jan 2026
Q3 2025-26 Water supply and sewage board13 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Jan 2026
Q3 2025-26 KPTCL- BESCOM13 Jan 2026
Q3 2025-26 Fire and Safety13 Jan 2026
Q3 2025-26 Airport Authority of India13 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department13 Jan 2026
Authenticated Copies of RTCsFile: Sowparnika Rhythm of Rain - Authenticated Copies of RTCs.pdf22 Jan 2025
No Litigation AffidavitFile: Sowparnika Rhythm of Rain - No Litigation Affidavit - Revised.pdf22 Jan 2025
ADLR Certified Survey Sketch & Village mapFile: Sowparnka Rhythm of Rain - Joint Survey Sketch & Village Map.pdf22 Jan 2025
Original Single Plot Layout Plan / Development Plan (DP)File: Sowparnika Rhythm of Rain - DP.pdf22 Jan 2025
Original Single Plot layout plan work order / DP Commencement CertificateFile: Sowparnika Rhythm of Rain - DP - Commencement Certificate.pdf22 Jan 2025
Building Permit / Commencement CertificateFile: Sowparnika Rhythm of Life - Building Permit.pdf22 Jan 2025
Plan Sanctions - 1 of 11 - Site PlanFile: Sowparnika Rhythm of Rain - Plan Sanctions - 1 of 11 - Site Plan.pdf22 Jan 2025
Plan Sanctions - 2 of 11 - Basement Floor Plan - Building 1File: Sowparnika Rhythm of Rain - Plan Sanctions - 2 of 11 - Basement Floor Plan - Building 1.pd22 Jan 2025
Plan Sanctions - 3 of 11 - Basement Floor Plan - Building 2File: Sowparnika Rhythm of Rain - Plan Sanctions - 3 of 11 - Basement Floor Plan - Building 2.pd22 Jan 2025
Plan Sanctions - 4 of 11 - Ground Floor - Building 1File: Sowparnika Rhythm of Rain - Plan Sanctions - 4 of 11 - Ground Floor - Building 1.pdf22 Jan 2025
Plan Sanctions - 5 of 11 - Ground Floor Plan - Building 2File: Sowparnika Rhythm of Rain - Plan Sanctions - 5 of 11 - Ground Floor Plan - Building 2.pdf22 Jan 2025
Plan Sanctions - 6 of 11 - 1st Floor Plan - Building 1File: Sowparnika Rhythm of Rain - Plan Sanctions - 6 of 11 - 1st Floor Plan - Building 1.pdf22 Jan 2025
Plan Sanctions - 7 of 11 - 1st & Typical Floor Plan - Building 2File: Sowparnika Rhythm of Rain - Plan Sanctions - 7 of 11 - 1st & Typical Floor Plan - Building22 Jan 2025
Plan Sanctions - 8 of 11 - Typical Floor Plan - Building 1File: Sowparnika Rhythm of Rain - Plan Sanctions - 8 of 11 - Typical Floor Plan - Building 1.pdf22 Jan 2025
Plan Sanctions - 9 of 11- Terrace Floor Plan - Building 1File: Sowparnika Rhythm of Rain - Plan Sanctions - 9 of 11- Terrace Floor Plan - Building 1.pdf22 Jan 2025
Plan Sanctions - 10 of 11 - Terrace, Elevation & Section - Building 2File: Sowparnika Rhythm of Rain - Plan Sanctions - 10 of 11 - Terrace, Elevation & Section - Bui22 Jan 2025
Plan Sanctions - 11 of 11 - Section & Elevation - Building 1File: Sowparnika Rhythm of Rain - Plan Sanctions - 11 of 11 - Section & Elevation - Building 1.p22 Jan 2025
Council of Architecture - Registration CertificateFile: Sowparnika Rhythm of Rain - Council of Architecture - Registration Certificate - Self Atte22 Jan 2025
NOC - KSPCBFile: Sowparnika Rhythm of Rain - NOC - KSPCB.pdf22 Jan 2025
No Litigation Under PTCLFile: Sowparnika Rhythm of Rain - No Litigation Under PTCL.pdf22 Jan 2025
Structural Engineer - Registration Certificate - Self AttestedFile: Sowparnika Rhythm of Rain - Structural Engineer - Registration Certificate - Self Attested22 Jan 2025
Self Attested Land Calculatuon SheetFile: Sowparnika Rhythm of Rain - Self Attested Land Calculatuon Sheet.pdf22 Jan 2025
STP Flow Diagram - Signed by EngineerFile: Sowparnika Rhythm of Rain - STP Flow Diagram - Signed.pdf22 Jan 2025
Section 3(1) - No Violation AffidavitFile: Sowparnika Rhythm of Rain - Section 3(1) - No Violation Affidavit - Revised.pdf22 Jan 2025
Draft Agreement of SaleFile: Sowparnika Rhythm of Rain - Draft Agreement of Sale Upated.pdf22 Jan 2025
Project Specifications - SignedFile: Sowparnika Rhythm of Rain - Project Specifications - Signed.pdf22 Jan 2025
RTC, survey 10/4-
Mutation, survey 10/4-
Encumbrance Certificate, survey 10/4-
Conversion/Alienation Order, survey 10/4-
Sale/Title/Gift Deed, survey 10/4-
Khatha, survey 10/4-
RTC, survey 10/5-
Mutation, survey 10/5-
Encumbrance Certificate, survey 10/5-
Conversion/Alienation Order, survey 10/5-
Sale/Title/Gift Deed, survey 10/5-
Khatha, survey 10/5-
RTC, survey 10/6-
Mutation, survey 10/6-
Encumbrance Certificate, survey 10/6-
Conversion/Alienation Order, survey 10/6-
Sale/Title/Gift Deed, survey 10/6-
Khatha, survey 10/6-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationStatusPromisedDelivered
Sowparnika Euphoria in the EastSy. No. 86/1, Sy. No. 86/3, Sy. No. 86/4 of Doddagattiganabbe Village and , Sy. No. 60/2 & Sy. No. 61/4 of Pujena Agrahara Village , HosakoteOngoingMay 2031Not due yet

How this compares with Bengaluru Rural

97%of this project is bookeddistrict median 45%
20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Sowparnika Rhythm of Rain on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmSowparnika Rhythm of RaiOther 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: SOWPARNIKA HOMES PRIVATE LIMITED

SOWPARNIKA HOMES PRIVATE LIMITED has 5 registrations on RERA Karnataka, including Sowparnika The Native and SOWPARNIKA EUPHORIA IN THE EAST. Its filings declare 5 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Sowparnika Rhythm of Rain is delayed beyond 15 Jan 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Sowparnika Rhythm of Rain?

The registered promoter entity is SOWPARNIKA HOMES PRIVATE LIMITED, a company as per the filing. Its CIN U45400KA2014PTC074654 and GSTIN 29AAUCS5844F1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Sowparnika Rhythm of Rain?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Sowparnika Rhythm of Rain?

The professionals named in the filing: Architect: MANIRAJ D; Engineer: VAIBHAV KUMAR J G; Chartered Accountant: CHITTEPU YESHWANT REDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sowparnika Rhythm of Rain?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sowparnika Rhythm of Rain. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sowparnika Rhythm of Rain to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.