Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Apr 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 50 documents Report an error

Samhita Asta is a Mixed Development project by Samhita Constructions in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/180905/002002 on 5 Sep 2018. Possession is promised by 23 Apr 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameSamhita Asta
  • TypeMixed Development
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/180905/002002
  • ReraGenie IDRG-KA-45438

Builder

  • NameSamhita Constructions
  • Entity typeCompany
  • Authorized SignatoryR PRATAP KUMAR REDDY
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2018First promiseJul 2021Revised toApr 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Sep 2018
  • Promised completion23 Apr 2022
  • Revised completionRevised to 23 Apr 2022 (originally 23 Jul 2021)
  • Buildings1 building record
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Samhita Asta-----25

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,574 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.55 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2021 → Apr 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/180905/002002 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Samhita Constructions Registration Certificate.pdf-
CC-
Plan Sanction_Original-
Plan Sanction_Original-
SD_Template-
AS_Template-
Sale Deed & RTC - Asta-
Plan Sanction_Original-
309- THANISANDRA-
Allotment Letter - Asta-
Brochure - Asta-
Project Specifications_1503158089440-
EC - 01-04-04 to 03-08-18-
Katha Certificate & Extract-
JDA-
GPA-
Conversion Certificate- Samhita Asta-
tdr-
tdr-
tdr-
BWSSB Receipt-
Pollution Control Board Receipt-
Unnamed document-
Plan Sanction_Original-
Plan Sanction_Original-
Plan Sanction_Original-
Change of Land use-
Balance Sheet 2016 - 2017File: 3Balance Sheet AY 2017-18.pdf-
Balance Sheet 2015 - 2016File: 2Balance Sheet AY 2016-17.pdf-
Balance Sheet 2014 - 2015File: 1Balance Sheet - AY 2015-16.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 3Profit Loss AY 2017-18.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2Profit & Loss AY 2016-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: 1Profit & Loss AY 2015-16.pdf-
Director's Report 2016 - 2017File: Director's Report - Asta.pdf-
Director's Report 2015 - 2016File: Director's Report - Asta.pdf-
Director's Report 2014 - 2015File: Director's Report - Asta.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement - Asta.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement - Asta.pdf-
Auditor's Report 2016 - 2017File: 3Audit Report AY 2017-18-ilovepdf-compressed.pdf-
Auditor's Report 2015 - 2016File: 2Audit Report - AY 2016-17-ilovepdf-compressed.pdf-
Auditor's Report 2014 - 2015File: 1Audit Report AY 2015-16.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: 3ITR Ack-AY 2017-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 2ITR Ack-AY 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 1ITR Ack-AY 2015-16.pdf-
Form B - Asta-
Prospectus/BrochureFile: Brochure - Asta.pdf-
Advertisement Copy 1File: advertisement.JPG-
Tower Excel SheetFile: PRM-KA-RERA-1251-309-PR-180905-002002.xlsx-
Occupancy CertificateFile: Asta OC.pdf-
Completion certificate issued by the competent authorityFile: Asta OC.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Samhita Elite-OngoingAug 2019Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Samhita Asta on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Samhita Constructions

Samhita Constructions has 1 registration on RERA Karnataka, including Samhita Asta. Its filings declare 1 earlier project, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Samhita Asta is delayed beyond 23 Apr 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Samhita Asta?

The registered promoter entity is Samhita Constructions, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Samhita Asta?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Samhita Asta?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samhita Asta. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samhita Asta to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.