Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Oct 2024Possession promisedmoved 21 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 86 documents Report an error

SALARPURIA SATTVA MISTY CHARM is a Residential/Group Housing project by SALARPURIA HOUSING PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180507/001635 on 7 May 2018. Possession is promised by 31 Oct 2024. The completion date has moved by 21 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSALARPURIA SATTVA MISTY CHARM
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/180507/001635
  • ReraGenie IDRG-KA-36979

Builder

  • NameSALARPURIA HOUSING PRIVATE LIMITED
  • Entity typeCompany
  • CINU45201WB2001PTC092918
  • Authorized SignatoryR. Yoganarasimha Rao
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2018First promiseJan 2023Revised toOct 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on7 May 2018
  • Promised completion31 Oct 2024
  • Revised completionRevised to 31 Oct 2024 (originally 31 Jan 2023)
  • Buildings11 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1---47047
Tower 2---54054
Tower 3---66066
Tower 4---66066
Tower 5---82082
Tower 6---82082
Tower 7---78078
Tower 8---78078
Tower 9---82082
Tower 10---82082
Tower 11---80080

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities43

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Civic Ameneties AreaYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Open Parking AreaYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area48,364 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 167.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectzachariah consultants
EngineerM/s. ISA Structural Studio

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJan 2023 → Oct 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/231104/001635Oct 2023 → Oct 2024

Reason as filed by the promoterAwaiting Approvals

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00187/2026-SALARPURIA HOUSING PRIVATE LIMITED02/03/2026

Documents filed86

As listed on the registration, under the names the promoter filed them with; the newest 80 of 86 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180507/001635 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Certificate of Incorporation - SHPL.pdf-
Architect Certificate for Work Completion Schedule till DateFile: EX 1 Architect Completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: EX-5 Civil Engineer.pdf-
CA Certificate for Funds UtilizationFile: CA Ex-3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: EX 2 Architect pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: EX-6 Civil Engineer Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Ex-4.pdf-
AffidavitFile: Form-B Affidavit.pdf-
Latest Encumbrance CertificateFile: Misty charms EC 01-04-2023 to 19-10-2023.pdf-
Details Of Sold/ Un-sold UnitsFile: MISTY CHARM - SOLD UNSOLD SCANNED SIGNED.pdf-
Document 1File: Form 4 Misty Charm Q2 2023-24.pdf-
Document 2File: Form-5 & POC Misty Charm.pdf-
Document 3File: Form 6 & POC Misty Charm.pdf-
Document 4File: Tower 2.jpeg-
Document 5File: Tower 3.jpeg-
Document 6File: Tower 4.jpeg-
Document 7File: Tower 5.jpeg-
Document 8File: Tower 6.jpeg-
Document 9File: Tower 7.jpeg-
Document 10File: Tower 8.jpeg-
Document 11File: Tower 9.jpeg-
Document 12File: Tower 10.jpeg-
Document 13File: Tower 11.jpeg-
Document 14File: Airport NOC.pdf-
Document 15File: BSNL NOC.pdf-
Document 16File: SEIAA NOC.pdf-
Document 17File: BESCOM NOC.pdf-
Document 18File: KSPCB NOC.pdf-
Document 19File: WATER NOC.pdf-
Document 20File: Fire NOC.pdf-
Document 21File: Misty Charm CFO Application Acknowledgement.pdf-
CC-plan approval-
approved plan-SITE PLAN-
approved layout plan-
Draft Sale Deed-Misty Charm-draft-31012018-
Agreement to sell-Misty Charm-draft-31012018-
sale deed & RTC-
approved section of building-
Misty Charm DP Plan-
Application_for Allotment-Misty Charm-
misty_charm_brochure-
specification-Misty Charm-
EC upto 19-12-2017-
Khatha-Form 9-Land Tax Assessment-
JDA-Misty Charm-
Any other document-
Conversion Certificate-
Approval-NOC-
Mallasandra-Fire NOC-
Kanakapura Road-AAI NOC-
Kanakapura Road-Bescom NOC-
Mallasandra-Water NOC-
Kanakapura Road-CFE-
Mallasandra-EC-SEIAA-
KanakapuraRd-BSNL noc-
Unnamed document-
Pending-
Pending-
approved section of building-
Legal Opinion - Misty Charm-
Balance Sheet 2016 - 2017File: SHPL Balance sheet with schedule 16-17.pdf-
Balance Sheet 2015 - 2016File: SHPL BS with schedule 15-16.pdf-
Balance Sheet 2014 - 2015File: SHPL BS 2014-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: SHPL P & L with schedules 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: SHPL P & L with schedules 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: SHPL_P_L_with_schedule_14-15.pdf-
Director's Report 2016 - 2017File: SHPL Directors report 2017.pdf-
Director's Report 2015 - 2016File: SHPL _Directors Report 2016.pdf-
Director's Report 2014 - 2015File: SHPL Director Report 2015.pdf-
Cash Flow Statement 2016 - 2017File: SHPL cash flow 16-17.pdf-
Cash Flow Statement 2015 - 2016File: SHPL cash flow 2015-16.pdf-
Auditor's Report 2016 - 2017File: SHPL_auditors_report_2016-17.pdf-
Auditor's Report 2015 - 2016File: SHPL_auditors_report_2015-16.pdf-
Auditor's Report 2014 - 2015File: SHPL-Auditor Report-14-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR ack for 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: SHPL ITR ack 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: SHPL ITR ack 2014-15.pdf-
Form-B-Misty Charm-
Prospectus/BrochureFile: Misty_Charm_brochure_web.pdf-
Advertisement Copy 1File: Mistycharm_AD.jpg-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
SALARPURIA-SATTVA GREENAGE-Completed-No date filed
SALARPURIA-SATTVA ASPIRE-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SALARPURIA SATTVA MISTY CHARM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSALARPURIA SATTVA MISTY Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 42 registered projects within 2 km.

Builder: SALARPURIA HOUSING PRIVATE LIMITED

SALARPURIA HOUSING PRIVATE LIMITED has 1 registration on RERA Karnataka, including SALARPURIA SATTVA MISTY CHARM. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SALARPURIA SATTVA MISTY CHARM is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SALARPURIA SATTVA MISTY CHARM?

The registered promoter entity is SALARPURIA HOUSING PRIVATE LIMITED, a company as per the filing. Its CIN U45201WB2001PTC092918 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SALARPURIA SATTVA MISTY CHARM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SALARPURIA SATTVA MISTY CHARM?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SALARPURIA SATTVA MISTY CHARM?

The professionals named in the filing: Architect: zachariah consultants; Engineer: M/s. ISA Structural Studio. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SALARPURIA SATTVA MISTY CHARM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SALARPURIA SATTVA MISTY CHARM. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SALARPURIA SATTVA MISTY CHARM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.