Registration approved Residential/Group Housing project

SALARPURIA-SATTVA EXOTIC

By SALARPURIA REAL ESTATES PRIVATE LIMITED

RG-KA-31662 · RERA PRM/KA/RERA/1251/309/PR/190427/002538

Source: official RERA Karnataka filing

Red flags

  • 8 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Aug 2024Possession promisedmoved 9 months from the original
8Complaints at RERA Karnatakaon this registration
Jump to the 51 documents Report an error

SALARPURIA-SATTVA EXOTIC is a Residential/Group Housing project by SALARPURIA REAL ESTATES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/190427/002538 on 27 Apr 2019. Possession is promised by 30 Aug 2024. The completion date has moved by 9 months from the original filing. 8 complaints are on record with the regulator.

At a glance

Project

  • NameSALARPURIA-SATTVA EXOTIC
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/190427/002538
  • ReraGenie IDRG-KA-31662

Builder

  • NameSALARPURIA REAL ESTATES PRIVATE LIMITED
  • Entity typeCompany
  • CINU70109WB1993PTC058014
  • Authorized SignatoryMr.P.K.Mishra
  • Other registrations3 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2019First promiseNov 2023Revised toAug 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on27 Apr 2019
  • Promised completion30 Aug 2024
  • Revised completionRevised to 30 Aug 2024 (originally 30 Nov 2023)
  • Buildings3 building records
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower1---1100110
Tower 2---1170117
Tower 3---1180118

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities42

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Open parking areasYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,469 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 91.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKUMARASWAMY ACHAR K
EngineerMANOHAR N

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionNov 2023 → Aug 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka8

Case no.ComplainantRespondentFiled
00349/2024-SALARPURIA REAL ESTATES PRIVATE LIMITED02/04/2024
00472/2024-SALARPURIA REAL ESTATES PRIVATE LIMITED24/05/2024
00513/2024-SALARPURIA REAL ESTATES PRIVATE LIMITED28/05/2024
01030/2024-SALARPURIA REAL ESTATES PRIVATE LIMITED19/10/2024
01040/2024-SALARPURIA REAL ESTATES PRIVATE LIMITED21/10/2024
01463/2025-SALARPURIA REAL ESTATES PRIVATE LIMITED10/12/2025
01464/2025-SALARPURIA REAL ESTATES PRIVATE LIMITED10/12/2025
00409/2026-SALARPURIA REAL ESTATES PRIVATE LIMITED17/04/2026

Documents filed51

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/190427/002538 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: ROC.pdf-
Kattigenahalli-Plan sanction-
Approved Layout Plan-
Draft Sale Deed-Exotic-draft-09102018-
Agreement to sell-Exotic-draft-09102018-
Exotic-documents-
Exotica- section plan-
Area Development Plan-
APPLICATION FOR ALLOTMENT FOR A RESIDENTIAL UNIT IN EXOTIC-
Exotic Brochure-
Exotic specification-
Exotic-EC-
Affidavit-S 3-
Exotic-Khatha cerrtificate & extract-
JDA--2435-
Relinquishment Deed-
CONVERTION-
Exotic-Fire NOC-
Kattigenahalli-Airport NOC-
Kattigenahalli-BESCOM Noc-
BWSSB NOC-UNDER PROCESS-
Kattigenahalli-CFE-
Kattigenahalli-EC-
Kattigenahalli-BSNL NOC-
Unnamed document-
Section plans-
Pending-
Balance Sheet 2017 - 2018File: SREPL BS with schedules 2016-17.pdf-
Balance Sheet 2016 - 2017File: 2015-16 Sal Real Estate -BS with Schedules.pdf-
Balance Sheet 2015 - 2016File: 2014-15 Sal Real Estate -BS with Schedules1.pdf-
Audited Profit and Loss Statement 2017 - 2018File: SREPL P & L with schedules 2016-17.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 2015-16 Sal Real Estate -P& L with Schedule1.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2014-15 Sal Real Estate -P& L with Schedules.pdf-
Director's Report 2017 - 2018File: SREPL Director report 2016.pdf-
Director's Report 2016 - 2017File: SREPL Directors report 2016.pdf-
Director's Report 2015 - 2016File: Directors Report-Salarpuria 2015.pdf-
Cash Flow Statement 2017 - 2018File: SREPL Cash flow 2016-17.pdf-
Cash Flow Statement 2016 - 2017File: 2015-16 Sal Real Estate -Cash flow.pdf-
Auditor's Report 2017 - 2018File: SREPL Auditors report 2016-17.pdf-
Auditor's Report 2016 - 2017File: 2015-16 Sal Real Estate- Auditors Report1.pdf-
Auditor's Report 2015 - 2016File: 2014-15 Sal Real Estate- Auditors Report1.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: SREPL ITR ack FY 2016-17.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: SREPL Directors report 2016.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: SREPL IT ack 2014-15.pdf-
Form-B-Exotic-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_190427_002538 (1).xlsx-
Occupancy CertificateFile: Exotic-OC.pdf-
Completion certificate issued by the competent authorityFile: Exotic-OC.pdf-
Registered Agreement of SaleFile: T3-404 - Registered Sale deed_compressed.pdf-
Registered conveyance deed for an individual unitFile: T3-404 - Registered Sale deed_compressed.pdf-
InsuranceFile: Exotic Building Insurance.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SALARPURIA-SATTVA EXOTIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmSALARPURIA-SATTVA EXOTICOther 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 13 registered projects within 2 km.

Builder: SALARPURIA REAL ESTATES PRIVATE LIMITED

SALARPURIA REAL ESTATES PRIVATE LIMITED has 4 registrations on RERA Karnataka, including salarpuria sattva park cubix and SALARPURIA-SATTVA EXOTIC. Its filings declare 5 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SALARPURIA-SATTVA EXOTIC is delayed beyond 30 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SALARPURIA-SATTVA EXOTIC?

The registered promoter entity is SALARPURIA REAL ESTATES PRIVATE LIMITED, a company as per the filing. Its CIN U70109WB1993PTC058014 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SALARPURIA-SATTVA EXOTIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SALARPURIA-SATTVA EXOTIC?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SALARPURIA-SATTVA EXOTIC?

The professionals named in the filing: Architect: KUMARASWAMY ACHAR K; Engineer: MANOHAR N. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SALARPURIA-SATTVA EXOTIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SALARPURIA-SATTVA EXOTIC. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SALARPURIA-SATTVA EXOTIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.