Home / Browse projects / Mumbai Suburban, Maharashtra / SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE

Completed No litigation declared Others project

SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE

By M/S SAI SHAKTI REALTORS

RG-MH-82928 · RERA P51800018363 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedregistration recorded completed
16 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 40%
53 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 160 documents Report an error

SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE is a Others project by M/S SAI SHAKTI REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018363 on 26 Oct 2018. The registration is recorded completed; possession was promised by 30 Jun 2028. 52 of the 105 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAI ORCHID AND SAI FORTUNE BUSINESS CENTRE
  • TypeOthers
  • Location
    • TILAK ROAD
    • GHATKOPAR EAST
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800018363
  • ReraGenie IDRG-MH-82928

Builder

  • NameM/S SAI SHAKTI REALTORS
  • Entity typePartnership
  • PartnersLEEBIN SREEDHARAN MUTHAYAN, DEVANG NITIN KAMDAR, DHAVAL PRAKASH KAMDAR, PRAKASH CHAMPAKLAL KAMDAR, RAJESH PRABHUDAS KAMDAR
  • PartnersNITIN PRABHUDAS KAMDAR, SREEDHARAN KRISHNAN MUTHATHYAN

Key dates

this monthRegisteredOct 2018PromisedJun 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Oct 2018
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed160 files

Current status

50%52 of 105 units booked

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI ORCHIDNA9727027
SAI FORTUNE BUSINESS CENTRENA191707878

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 40%.

SAI ORCHID100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SAI FORTUNE BUSINESS CENTRE49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered9
BuildingClosed/CoveredTotal
SAI ORCHID88
SAI FORTUNE BUSINESS CENTRE11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,305 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MAHANAGARPALIKA
Permissible FSI5405.0
Proposed, not sanctioned5,405 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCorporate Park VN Purav Marg Swastik Park Chembur Mumbai 400071

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTIWASKAR AND ASSOCIATES
EngineerMOHD.ANISUR RAHMAN
Chartered AccountantPratik V Shah
Chartered AccountantMayur R Parekh
PartnerRole in project
M/S SAI SHAKTI REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Jul 2023

Documents filed160

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Sai Orchid Part OC.pdf11 May 2026
Occupational CertificateFile: Occupation Certificate.pdf9 May 2026
Form 1File: SSR-FORM 1-March2026.pdf20 Apr 2026
Form 2File: SSR-FORM 2-March2026.pdf20 Apr 2026
Form 3File: SSR-FORM 3-March2026.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: SSR-Disclosure of Inventory-March2026.pdf20 Apr 2026
Form 1File: SSR-Form 1-DEC25-QRTR.pdf20 Jan 2026
Form 2File: SSR Form 2-DEC25-QRTR.pdf20 Jan 2026
Form 3File: SSR- Form 3-DEC25-QRTR.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: SSR- Disclosure of Inventory-DEC25-QRTR.pdf20 Jan 2026
Form 1File: SSR-Form 1- Q2-2025.pdf20 Oct 2025
Form 2File: SSR Form 2-Q2-2025.pdf20 Oct 2025
Form 3File: SSR-Form-3-Q2-2025.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: SSR-Inventory-Q2-2025.pdf20 Oct 2025
Form 2A (FY 2024-2025)File: SSR-Form 2A-FY 2024-25.pdf29 Sep 2025
Form 5 (FY 2024-2025)File: SSR-Form 5-FY 2024-25.pdf29 Sep 2025
Form 5 (FY 2022-2023)File: Form 5- FY 2022-2023.pdf29 Sep 2025
Form 5 (FY 2023-2024)File: SSR-Form 5-FY 2023-24.pdf29 Sep 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form-2.pdf14 Aug 2025
Form 3File: Form-3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory30062024.pdf14 Aug 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: FORM 2.pdf14 Aug 2025
Form 3File: Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory30092024.pdf14 Aug 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form 2.pdf14 Aug 2025
Form 3File: Form 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory31122024.pdf14 Aug 2025
Form 1File: Form 1.pdf14 Aug 2025
Form 2File: Form 2.pdf14 Aug 2025
Form 3File: Form-3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory31032025.pdf14 Aug 2025
Form 1File: Form 1.pdf19 Jul 2025
Form 2File: FORM 2.pdf19 Jul 2025
Form 3File: FORM 3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF INVENTORY.pdf19 Jul 2025
Certificates of CA (Form 3)File: Form-3.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf8 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Jan 2025
Certificates of CA (Form 3)File: Form 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf9 Oct 2024
Certificates of CA (Form 3)File: Form-3.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf15 Jul 2024
Details of encumbrancesFile: Details of Encumbrances concerned to Finance.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3.pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf20 Jan 2024
Certificates of CA (Form 3)File: Form 3.pdf20 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER 2.pdf6 Dec 2023
Certificates of CA (Form 3)File: NEW CA CERTIFICATE.pdf4 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Engineer Certificate for quality assurance.pdf18 Oct 2023
Certificates of CA (Form 3)File: Form 3 - CA Certificate.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Annual Report on Statement of Accounts.pdf18 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 2023-10-03-Format-A-Declaration.pdf5 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 2023-10-03-Letter-Explanation.pdf5 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure-A.pdf5 Oct 2023
Certificates of CA (Form 3)File: Form-3 Certificate as on 30-06-2023 Signed.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1 17-07-2023.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf20 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: SSR Full CC Final 20-01-23.pdf14 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sai Orchid Part OC.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSR Form-2 FY 22-23 Q4.pdf19 Apr 2023
Certificates of CA (Form 3)File: SSR Form-3 Certificate as on 31-03-2023 Signed.pdf19 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5).pdf19 Apr 2023

How this compares with Mumbai Suburban

50%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

2 kmSAI ORCHID AND SAI FORTUCompleted 136Lapsed / revoked 106Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 384 registered projects within 2 km.

Builder: M/S SAI SHAKTI REALTORS

M/S SAI SHAKTI REALTORS has 1 registration on MahaRERA, including SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE?

The registered promoter entity is M/S SAI SHAKTI REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE?

The professionals named in the filing: Architect: TIWASKAR AND ASSOCIATES; Engineer: MOHD.ANISUR RAHMAN; Chartered Accountant: Pratik V Shah; Chartered Accountant: Mayur R Parekh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.