Home / Browse projects / Bengaluru Urban, Karnataka / SAI CRYSTAL

Registration approved No litigation declared Residential/Group Housing project

SAI CRYSTAL

By ADARSH CONSTRUCTIONS

RG-KA-69362 · RERA PRM/KA/RERA/1251/308/PR/110823/006170 · Last updated on RERA Karnataka portal: 11 Aug 2023

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Jun 2025Possession promisedno revision filed
1Complaints at RERA Karnatakaon this registration
Jump to the 104 documents Report an error

SAI CRYSTAL is a Residential/Group Housing project by ADARSH CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/110823/006170 on 11 Aug 2023. Possession is promised by 30 Jun 2025. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAI CRYSTAL
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/110823/006170
  • ReraGenie IDRG-KA-69362

Builder

  • NameADARSH CONSTRUCTIONS
  • Entity typePartnership Firm
  • Authorized SignatoryUMAKANTHA REDDY T

Key dates

this monthRegisteredAug 2023PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Aug 2023
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed104 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI CRYSTAL---84084

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 11 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 11 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners3
LandownerVillageDistrict
B M HARISH--
SUBRAMANI--
MANJU BARGHAV B--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 23.06 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 22.75 cr-
Administrative CostRs 25.00 lakh-
On-site expenditure-Consultants FeesRs 6.40 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHANUMATHY G
EngineerSRINIVAS RAO BOLIMUNTA
Chartered AccountantVS Krishna Murthy

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01527/2025-ADARSH CONSTRUCTIONS26/12/2025

Documents filed104

As listed on the registration, under the names the promoter filed them with; the newest 80 of 104 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/110823/006170 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RERA Bank Account StatementFile: RERA Account Bank Statement.pdf11 Aug 2023
Source Of FundsFile: Source of Funds.pdf11 Aug 2023
Financials with Partner SignatureFile: Financials - with Partner Sign.pdf11 Aug 2023
Katha from CMC HebbagodiFile: Katha From CMC Hebbagodi.pdf11 Aug 2023
Building LicenseFile: Building License CMC Hebbagodi.pdf11 Aug 2023
Relinquishment DeedFile: Relinquishment Deed.pdf11 Aug 2023
Single Plot Layout and Order CopyFile: Single Plot Layout and Order.pdf11 Aug 2023
Certified Carpet Area Calculation with common areasFile: Certified Carpet Area Calculation.pdf11 Aug 2023
Engineer License Self AttestedFile: Engineer License Self Attested.pdf11 Aug 2023
Form - 6 Engineer CertificateFile: FORM 6 - Engineer Certificate.pdf11 Aug 2023
Guidance Value Certified CopyFile: SR Value Certified Copy.pdf11 Aug 2023
ARCHITECT COA CERTIFICATEFile: COA Certificate.pdf11 Aug 2023
FORM - 2 ARCHITECT CERTIFICATEFile: FORM 2 - ARCHITECT CERTIFICATE.pdf11 Aug 2023
SALE AGREEMENT PROFORMAFile: Agreement for sale - RERA.pdf11 Aug 2023
RTC, survey 89/4-
Mutation, survey 89/4-
Encumbrance Certificate, survey 89/4-
Conversion/Alienation Order, survey 89/4-
JDA, survey 89/4-
Khatha, survey 89/4-
RTC, survey 90/2-
Mutation, survey 90/2-
Encumbrance Certificate, survey 90/2-
Conversion/Alienation Order, survey 90/2-
JDA, survey 90/2-
Khatha, survey 90/2-
RTC, survey 90/2-
Mutation, survey 90/2-
Encumbrance Certificate, survey 90/2-
Conversion/Alienation Order, survey 90/2-
JDA, survey 90/2-
Khatha, survey 90/2-
Registration CertificateFile: Firm Registration Certificate.pdf-
Partnership DeedFile: Re-Constitution Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 - CA Certificate.pdf-
Certificate issued by Architect Form 2File: FORM 2 - ARCHITECT CERTIFICATE.pdf-
Certificate issued by Engineer Form 3File: FORM 3 - Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: NO Litigation Affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 - CA Certificate.pdf-
Balance Sheet 2021 - 2022File: Financials as on 31-3-23 with CA UDIN.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Financials as on 31-3-23 with CA UDIN.pdf-
Director's Report 2021 - 2022File: Financials as on 31-3-23 with CA UDIN.pdf-
Cash Flow Statement 2021 - 2022File: Financials as on 31-3-23 with CA UDIN.pdf-
Auditor's Report 2021 - 2022File: Financials as on 31-3-23 with CA UDIN.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Financials as on 31-3-23 with CA UDIN.pdf-
Commencement Certificate-
BESCOM NOC with Fees Paid-
Water NOC with Fees Paid-
Ground Floor Plan-
Stilt Floor Plan-
Site Plan-
Building plan 1 to 3 Floor and Terrace Floor-
Building plan 1 to 3 Floor and Terrace Floor-
Project Specifications and Amenities-
Building plan 1 to 3 Floor and Terrace Floor-
STRUCTURAL STABILITY CERTIFICATE-
Legal Opinion-
JDA-
REGISTERED GPA-
Allotment letter-
Form - B-
Affidavit 3-1 with Project Address-
Joint Affidavit Cum Declaration-
BESCOM NOC with Fees Paid-
Water NOC with Fees Paid-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep SAI CRYSTAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: ADARSH CONSTRUCTIONS

ADARSH CONSTRUCTIONS has 1 registration on RERA Karnataka, including SAI CRYSTAL. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if SAI CRYSTAL is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SAI CRYSTAL?

The registered promoter entity is ADARSH CONSTRUCTIONS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SAI CRYSTAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAI CRYSTAL?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at SAI CRYSTAL?

The professionals named in the filing: Architect: BHANUMATHY G; Engineer: SRINIVAS RAO BOLIMUNTA; Chartered Accountant: VS Krishna Murthy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI CRYSTAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI CRYSTAL. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI CRYSTAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.