Registration lapsed No litigation declared Residential / Group Housing project

Sahyadri Residency Phase I

By M/S NIRMAN DEVELOPERS

RG-MH-89021 · RERA P51700013099 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
7 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 98%
70 of 82Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 145 documents Report an error

Sahyadri Residency Phase I is a Residential / Group Housing project by M/S NIRMAN DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700013099 on 14 Sep 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. The completion date has moved by 12 months from the original filing. 12 of the 82 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameSahyadri Residency Phase I
  • TypeResidential / Group Housing
  • Location
    • Murbad
    • Thane
    • 421401
  • Pincode421401
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700013099
  • ReraGenie IDRG-MH-89021

Builder

  • NameM/S NIRMAN DEVELOPERS
  • Entity typePartnership
  • PartnersVINOD BALARAM KENE, MILIND SUDHAKAR DESHMUKH, NITIN BALARAM BHOIR, ASHISH BALARAM BHOIR

Key dates

34 months past promisethis monthRegisteredSep 2017First promiseDec 2022Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on14 Sep 2017
  • Promised completion30 Dec 2023
  • Revised completionRevised to 30 Dec 2023 (originally 30 Dec 2022)
  • Buildings2 building records
  • Documents filed145 files

Current status

15%12 of 82 units booked

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 4NA6638240
BUILDING 7/ANA9942042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.

BUILDING 485%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
BUILDING 7/A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,536 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Satish Motiram PowaleMurbadThane

Approvals and building plan

Sanctioning authorityMurbad Nagar Panchayat
Permissible FSI3138.22
Proposed, not sanctioned3,138 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMURBAD, THANE 421401

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeo Associates
ArchitectGULAMSABIR MOHAMMADHALIM CHAUDHARY
EngineerGeo Associates
Chartered AccountantRAHUL N GHARAT & CO
Chartered AccountantDilip Gosar
PartnerRole in project
M/S NIRMAN DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700015297Dec 2022 → Dec 2023

Reason as filed by the promoterAs you are aware, there was complete site closure from March 2020 till September 2020 due to Covid-19. Thereafter also we could not start the work in full swing due to a shortage of labor and a paucity of funds. Furthermore, there were also certain restrictions imposed by the State government to curb the covid-19 pandemic during the second wave of the pandemic which was unable to collect advances from customers due to financial difficulties faced by our prospective buyers who were looking to book or invest in our project. We are seeking extension for project Completion date which enable us to

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Sep 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Sep 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Apr 2024

Documents filed145

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 145 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Jun 23.pdf24 Jun 2026
Form 2File: Form 2_Jun 23.pdf24 Jun 2026
Form 3File: Form 3 jun 2023.pdf24 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers June 2023.pdf24 Jun 2026
Form 1File: sep 23.pdf24 Jun 2026
Form 2File: Form2_Sep2023.pdf24 Jun 2026
Form 3File: Form 3 sep 2023.pdf24 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers September 2023.pdf24 Jun 2026
Form 1File: Dec 23.pdf24 Jun 2026
Form 2File: Form2_Dec2023.pdf24 Jun 2026
Form 3File: Form 3 Dec 2023.pdf24 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers december 2023.pdf24 Jun 2026
Form 1File: June 18.pdf23 Jun 2026
Form 2File: Form 2_Jun 18.pdf23 Jun 2026
Form 3File: Form 3 jun 2018.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers june 2018.pdf23 Jun 2026
Form 1File: Sep 18.pdf23 Jun 2026
Form 2File: Form 2_Sep 18.pdf23 Jun 2026
Form 3File: Form 3 Sep 2018.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers September 2018.pdf23 Jun 2026
Form 1File: Dec 18.pdf23 Jun 2026
Form 2File: Form 2Dec 18.pdf23 Jun 2026
Form 3File: Form 3 Dec 2018.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers december 2018.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers March 2019.pdf23 Jun 2026
Form 3File: Form 3 Mar 2019.pdf23 Jun 2026
Form 2File: Form 2_Mar 19.pdf23 Jun 2026
Form 1File: Mar 19.pdf23 Jun 2026
Form 1File: June 19.pdf23 Jun 2026
Form 2File: Form 2_Jun 19.pdf23 Jun 2026
Form 3File: Form 3 jun 2019.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers June 2019.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers September 2019.pdf23 Jun 2026
Form 3File: Form 3 Sep 2019.pdf23 Jun 2026
Form 2File: Form 2_Sep 19.pdf23 Jun 2026
Form 1File: Sep 19.pdf23 Jun 2026
Form 1File: Dec 19.pdf23 Jun 2026
Form 2File: Form 2_Dec 19.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers december 2019.pdf23 Jun 2026
Form 3File: Dec_19.pdf23 Jun 2026
Form 3File: Form 3 Mar 2020.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers March 2020.pdf23 Jun 2026
Form 1File: Mar 20.pdf23 Jun 2026
Form 2File: Form 2_MAR 20.pdf23 Jun 2026
Form 2File: Form 2_Jun 20.pdf23 Jun 2026
Form 1File: June 20.pdf23 Jun 2026
Form 3File: Form 3 June 2020.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers june 2020.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers September 2020.pdf23 Jun 2026
Form 1File: Form 1 sep 20.pdf23 Jun 2026
Form 2File: Form 2_Sep 20.pdf23 Jun 2026
Form 3File: Sep 20.pdf23 Jun 2026
Form 3File: form3 Dec 20.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers december 2020.pdf23 Jun 2026
Form 2File: Form 2_Dec 20.pdf23 Jun 2026
Form 1File: Dec 20.pdf23 Jun 2026
Form 1File: Mar 21.pdf23 Jun 2026
Form 2File: Form 2_Mar_ 21.pdf23 Jun 2026
Form 3File: Mar 21 form 3.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developer March 2021.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developers june 2021.pdf23 Jun 2026
Form 3File: Form 3 june 21.pdf23 Jun 2026
Form 2File: Form 2_Jun 21.pdf23 Jun 2026
Form 1File: June 21.pdf23 Jun 2026
Form 1File: form 1 sep 21.pdf23 Jun 2026
Form 3File: Sep 21.pdf23 Jun 2026
Form 2File: Form 2_Sep_ 21.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developer September 2021.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developer december 2021.pdf23 Jun 2026
Form 3File: Dec_2021.pdf23 Jun 2026
Form 2File: Form 2_Dec 21.pdf23 Jun 2026
Form 1File: Dec 21.pdf23 Jun 2026
Form 1File: Mar 22.pdf23 Jun 2026
Form 2File: Form 2_MAR 22_V2.pdf23 Jun 2026
Form 3File: March 22.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developer March 2022.pdf23 Jun 2026
Disclosure of Sold and Booked InventoryFile: Nirman Developer june 2022.pdf23 Jun 2026
Form 3File: Form 3 Jun 2022.pdf23 Jun 2026
Form 2File: Form 2_Jun 22.pdf23 Jun 2026
Form 1File: June 22.pdf23 Jun 2026

How this compares with Thane

15%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sahyadri Residency Phase I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Murbad7,600+ in Thane

2 kmSahyadri Residency PhaseCompleted 4Lapsed / revoked 5Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: M/S NIRMAN DEVELOPERS

M/S NIRMAN DEVELOPERS has 1 registration on MahaRERA, including Sahyadri Residency Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Sahyadri Residency Phase I shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sahyadri Residency Phase I is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sahyadri Residency Phase I?

The registered promoter entity is M/S NIRMAN DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sahyadri Residency Phase I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sahyadri Residency Phase I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sahyadri Residency Phase I?

The professionals named in the filing: Architect: Geo Associates; Architect: GULAMSABIR MOHAMMADHALIM CHAUDHARY; Engineer: Geo Associates; Chartered Accountant: RAHUL N GHARAT & CO; Chartered Accountant: Dilip Gosar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sahyadri Residency Phase I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sahyadri Residency Phase I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sahyadri Residency Phase I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.