Home / Browse projects / Mysore, Karnataka / Saha Fortune

Registration approved No litigation declared Plotted Development project

Saha Fortune

By ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED

RG-KA-30298 · RERA PRM/KA/RERA/1268/378/PR/091123/006396 · Last updated on RERA Karnataka portal: 8 Nov 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 122 documents Report an error

Saha Fortune is a Plotted Development project by ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/091123/006396 on 9 Nov 2023. Possession is promised by 4 Sep 2027.

At a glance

Project

  • NameSaha Fortune
  • TypePlotted Development
  • Location
    • MYSORE
    • 571130
  • Pincode571130
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/091123/006396
  • ReraGenie IDRG-KA-30298

Builder

  • NameESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
  • Entity typeCompany
  • Authorized SignatoryShreekaanth Daas
  • Managing DirectorShreekaanth Daas
  • DirectorsShreekaanth Daas, Prathibha B
  • Project HeadShreekaanth Daas
  • Other registrations24 more →
  • Declared earlier projects84 →

Key dates

this monthRegisteredNov 2023PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Nov 2023
  • Promised completion4 Sep 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed122 files

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Land and ownership3

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners3
LandownerVillageDistrict
M/S. Ess and Ess Infrastructure Private Limited, Rep by its Managing Director Sri Shreekaanth Daas--
M/S. Ess and Ess Infrastructure Private Limited, Rep by its Managing Director Sri Shreekaanth Daas--
M/S. Ess and Ess Infrastructure Private Limited, Rep by its Managing Director Sri Shreekaanth Daas--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.50 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.93 cr-
On-site expenditure-Salaries of workersRs 77.01 lakh-
On-site expenditure-Site OverheadRs 63.01 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 10.50 lakh-
On-site expenditure-Consultants FeesRs 7.00 lakh-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerC B Lakshman Rao
Chartered AccountantA Vishwanatha

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed122

As listed on the registration, under the names the promoter filed them with; the newest 80 of 122 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/091123/006396 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
1. P&L Account and Balance Sheet with CA UDINFile: 1 P&L Account and Balance Sheet with CA UDIN.pdf8 Nov 2023
2. Clarification regarding Borrowing DetailsFile: 2 Clarification regarding Borrowing Details.pdf8 Nov 2023
3. Borrowing DetailsFile: 3 Borrowing Details.PDF8 Nov 2023
4. Charted Accountant certificate - Form 1File: 4 Charted Accountant certificate - Form 1.PDF8 Nov 2023
5. Annual Audit ReportFile: 5 Annual audit report.pdf8 Nov 2023
6. PRMKARERA1268378PR270922005275 Quarterly reportFile: 6 PRMKARERA1268378PR270922005275 Quarterly report.pdf8 Nov 2023
7. Correct ECFile: 7 Correct EC.pdf8 Nov 2023
8. EC from 12-10- 2016 to 31-1-2018 for sy no 237-1File: 8 EC from 12-10- 2016 to 31-1-2018 for sno 237-1.pdf8 Nov 2023
9. Title clearification of Sy No.237-1File: 9 Title clarification of Sy No 237-1.pdf8 Nov 2023
10. EC for sy no 242 from 1-7-2007 to 31-1-2018File: 10 EC for syno 242 from 1-7-2007 to 31-1-2018.pdf8 Nov 2023
11. Plot wise area Break up DetailsFile: 11 Plot wise area Break up Details.pdf8 Nov 2023
Individual plot Size, Dimension and Area detailsFile: 12 Individual plot Size, Dimension and Area details.pdf8 Nov 2023
13. Layout Work OrderFile: 13 Layout Work Order.pdf8 Nov 2023
14. CDPFile: 14 CDP.pdf8 Nov 2023
15. KSPCB Endorsement for other projectsFile: 15 KSPCB Endorsement for other projects.pdf8 Nov 2023
16. Architect's CertificateFile: 16 Architect's Certificate.pdf8 Nov 2023
17. Project Status UpdatedFile: 17 Project Status Updated.pdf8 Nov 2023
18. Common area that is Road, CA, Park and Open spaceFile: 18 Common area that is Road, CA, Park and Open space.pdf8 Nov 2023
19. Source of water supplyFile: 19 Source of water supply.pdf8 Nov 2023
20. Cost DetailsFile: 20 Cost Details.pdf8 Nov 2023
21. Land Cost Calculation SheetFile: 21 Land Cost Calculation Sheet.pdf8 Nov 2023
22. Brief Estimated Cost of ConstructionFile: 22 Brief Estimated Cost of Construction.PDF8 Nov 2023
23. Form-6, Engineer certificateFile: 23 Form-6, Engineer certificate.pdf8 Nov 2023
24. STP - Demarcated drawingFile: 24 STP.pdf8 Nov 2023
25. Proforma of Allotment LetterFile: 25 ALLOTMENT LETTER.pdf8 Nov 2023
26. Project SpecificationsFile: 26 Project Specifications.PDF8 Nov 2023
Water NOCFile: Water Board NOC.pdf8 Nov 2023
RTC, survey 115/1-
Mutation, survey 115/1-
Encumbrance Certificate, survey 115/1-
Conversion/Alienation Order, survey 115/1-
Sale/Title/Gift Deed, survey 115/1-
Khatha, survey 115/1-
RTC, survey 237/1-
Mutation, survey 237/1-
Encumbrance Certificate, survey 237/1-
Conversion/Alienation Order, survey 237/1-
Sale/Title/Gift Deed, survey 237/1-
Khatha, survey 237/1-
RTC, survey 242-
Mutation, survey 242-
Encumbrance Certificate, survey 242-
Conversion/Alienation Order, survey 242-
Sale/Title/Gift Deed, survey 242-
Khatha, survey 242-
Registration CertificateFile: Registration Certificate.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Form 1 - Certificate issued by Chartered Account.PDF-
Certificate issued by Engineer Form 3File: Engineer Certificate Form 3.PDF-
Project Chartered Accountant-
Project Engineer-
AffidavitFile: No Case Affidavit.PDF-
Certificate from Chartered AccountFile: Form 1 - Certificate issued by Chartered Account.PDF-
Balance Sheet 2022 - 2023File: 1 Balance Sheet FY 2021-22.pdf-
Balance Sheet 2021 - 2022File: 1 Balance Sheet FY 2021-22.pdf-
Balance Sheet 2020 - 2021File: 1 Balance Sheet FY 2020-21.pdf-
Audited Profit and Loss Statement 2022 - 2023File: 2 Profit and Loss Statement FY 2021-22.pdf-
Audited Profit and Loss Statement 2021 - 2022File: 2 Profit and Loss Statement FY 2021-22.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 2 Profit and Loss Account Fy 2020-21.pdf-
Director's Report 2022 - 2023File: 3 Directors Report FY 2021-22.pdf-
Director's Report 2021 - 2022File: 3 Directors Report FY 2021-22.pdf-
Director's Report 2020 - 2021File: 3 Directors Report FY 2020-21.pdf-
Cash Flow Statement 2022 - 2023File: 4 Cash Flow Statement FY 2021-22.pdf-
Cash Flow Statement 2021 - 2022File: 4 Cash Flow Statement FY 2021-22.pdf-
Auditor's Report 2022 - 2023File: 5 Auditors Report FY 2021-22.pdf-
Auditor's Report 2021 - 2022File: 5 Auditors Report FY 2021-22.pdf-
Auditor's Report 2020 - 2021File: 5 Auditors Report FY 2020-21.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: 6 Income Tax Return Acknowledgement FY 2020-21.pdf-
Plan Approval Letter-
CHESCOM NOC and Receipt-
Water Board NOC-
Approved Plan-
Approved Plan-
Approved Plan-
Project Specification-
Approved Plan-
Advocate Title Search-
Conversion Order-

Promoter's earlier projects40

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

25 not delivered by the promised date5 under way, not due yet34 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
JSS 4TH SAGE BLOCK BMadapura Village and Aragowdanahalli Village, Varuna Hobli, Mysore Taluk, Mysore District.OngoingJun 2028Not due yet
Athmanandhasgara 6Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingJun 2027Not due yet
KUBERANANDHASAGARA 12BMaidanahalli Village, Ilwala Hobli, Mysore Taluk & Mysore DistrictOngoingMar 2027Not due yet
JSS 4TH STAGE BLOCK AMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictOngoingMar 2027Not due yet
SREE SAPTHAMATHRUKA 5 &NANDI NAGARAMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru District.OngoingOct 2026Not due yet
Sukhanandhasagara 4Bommanhalli Village, Ilawala Hobli, Mysore Taluk & Mysore District.OngoingApr 2026Not delivered
Sree Sapthamathruka 1BMadapura Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictOngoingDec 2025Not delivered
Kuberanandhasagara Layout Phase 8Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 3Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 2Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout Phase 1Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Kuberanandhasagara Layout 11Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Kuberanandhasagara Layout 10Maidhanahalli Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 4Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 3Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 2Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 2Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District.OngoingMay 2025Not delivered
Athmanandhasagara Layout Phase 1Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2025Not delivered
Athmanandhasagara 5CNagawala Village, Ilwala Hobli ,Mysuru Taluk, Mysore District.OngoingDec 2024Not delivered
Athmanandhasagara 5BNagawala Village, Ilwala Hobli ,Mysuru Taluk, Mysore District.OngoingDec 2024Not delivered
Athmanandhasagara 5ANagawala Village, Ilwala Hobli, Mysore Taluk, Mysore DistrictOngoingDec 2024Not delivered
Shreesha Hill View Layout Phase 3Sarkari Utthanahalli Village, Varuna Hobli, Mysore Taluk and Mysore District.OngoingJan 2023Not delivered
Shreesha Hill View Layout Phase 2Sarkari Utthanahalli Village, VarunaHobli, Mysore Taluk and Mysore District.OngoingJan 2023Not delivered
Stavya LayoutHuyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Sree Sapthamathruka Layout Phase 4Marashettihalli Village, Varuna Hobli, Mysore Taluk, Mysore DistrictOngoingMay 2022Not delivered
Paramanandhasagara and Sukhanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District.OngoingMay 2022Not delivered
Paramanandhasagara Layout Phase 2Huyilalu village, Ilwala hobli,, Mysore taluk & district.OngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 3Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 2Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Nithyanandhasagara Layout Phase 1Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictOngoingMay 2022Not delivered
Venkatagiri LayoutGoruru Village, Kasaba Hobli, Mysore Taluk, Mysore DistrictCompleted-No date filed
Venkatadri LayoutBelawadi Village, Ilawala Hobli, Mysore Taluk and Mysore District.Completed-No date filed
Svasthi RetreatMarashettihalli Village, Varuna Hobli, Mysuru Taluk & Mysuru DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase1/AYandahalli Village, Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 3Yandahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore District.Completed-No date filed
Sree Sapthamathruka Layout Phase 2Yandahalli & Madapura Village,Varuna Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Sree Sapthamathruka Layout Phase 1Yandahalli Village, Varuna Hobli, Mysore Taluk and Mysore District.Completed-No date filed
Sree Sapthamathruka 6Janthagalli Village, Varuna Hobli, Mysuru Taluk & Mysuru District.Completed-No date filed
Sourish LayoutMadagalli Village, Ilawala Hobli, Mysore Taluk and Mysore DistrictCompleted-No date filed
Silicon Echo City 2Belawadi Village, Ilwala Hobli, Mysuru Taluk & Mysuru DistrictCompleted-No date filed

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep Saha Fortune on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmSaha FortuneOther 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED

ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED has 25 registrations on RERA Karnataka, including SHREE ENCLAVE MYSORE (iT PARK) 5 and JSS 4TH SAGE BLOCK B. Its filings declare 84 earlier projects, 37 of them declared completed. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if Saha Fortune is delayed beyond 4 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Saha Fortune?

The registered promoter entity is ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Saha Fortune?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Saha Fortune?

The professionals named in the filing: Engineer: C B Lakshman Rao; Chartered Accountant: A Vishwanatha. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saha Fortune?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saha Fortune. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saha Fortune to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.