Athmanandhasagara-7
By ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
RG-KA-82739 · RERA PRM/KA/RERA/1268/378/PR/060324/006663 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared, 1 case
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Athmanandhasagara-7 is a Plotted Development project by ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/060324/006663 on 6 Mar 2024. Possession is promised by 27 Nov 2027.
At a glance
Project
- NameAthmanandhasagara-7
- TypePlotted Development
- Location
- MYSORE
- 571130
- Pincode571130
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1268/378/PR/060324/006663
- ReraGenie IDRG-KA-82739
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Mar 2024
- Promised completion27 Nov 2027
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed107 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sri R. V. Venkataramaiah | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 1.62 cr | Rs 28.82 lakh |
| On-site expenditure-Salaries of workers | Rs 64.71 lakh | Rs 26.61 lakh |
| On-site expenditure-Site Overhead | Rs 52.94 lakh | Rs 14.99 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 8.82 lakh | Rs 19,499 |
| On-site expenditure-Consultants Fees | Rs 5.88 lakh | - |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Engineer | C B Lakshman Rao |
| Chartered Accountant | Madhusudana |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 18 | III Additional Senior Civil Judge | - |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed107
As listed on the registration, under the names the promoter filed them with; the newest 80 of 107 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/060324/006663 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate Issued by Chartered Accountant Form 4.PDF | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6.PDF | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: 1 Certificate issued by Chartered Account Form 4.PDF | 13 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: 2 Certificate Issued by Engineer Form 6 .PDF | 13 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 13 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 13 Jan 2026 |
| 1. Form 1 - CA Certificate in prescribed format uploadedFile: 1 Form 1 - Certificate issued by Chartered Account.PDF | 26 Feb 2024 |
| 2. JDA dated 17-2-2011 is still validFile: 2 JDA dated 17-2-2011 is still valid--.pdf | 26 Feb 2024 |
| 3. Rectified DA & GPAFile: 3 Rectified DA & GPA.pdf | 26 Feb 2024 |
| 4. Layout Work OrderFile: 4 Layout Work Order.pdf | 26 Feb 2024 |
| 5. CDP MapFile: 5 CDP Map.pdf | 26 Feb 2024 |
| 6. Horticulture department NOCFile: 6 Horticulture department NOC.pdf | 26 Feb 2024 |
| 7. Common area that is Road, CA, Park and Open spaceFile: 7 Common area that is Road, CA, Park and Open space.pdf | 26 Feb 2024 |
| 8. Brief Estimated Cost of ConstructionFile: 8 Brief Estimated Cost of Construction.PDF | 26 Feb 2024 |
| 9. Water Supply NOCFile: 9 Water Supply NOC.pdf | 26 Feb 2024 |
| 10. STPFile: 10 STP.pdf | 26 Feb 2024 |
| 11. Land Cost CalculationFile: 11 Land Cost Calculation Sheet.pdf | 26 Feb 2024 |
| 12. Source of water supply is BorewellFile: 12 Source of water supply.jpeg | 26 Feb 2024 |
| RTC, survey 253 | - |
| Mutation, survey 253 | - |
| Encumbrance Certificate, survey 253 | - |
| Conversion/Alienation Order, survey 253 | - |
| Sale/Title/Gift Deed, survey 253 | - |
| JDA, survey 253 | - |
| Khatha, survey 253 | - |
| Registration CertificateFile: Registration Certificate.pdf | - |
| Organization StructureFile: Organisation Structure.pdf | - |
| Certificate issued by CA Form 1File: 1 Form 1 - Certificate issued by Chartered Account.PDF | - |
| Certificate issued by Engineer Form 3File: Engineer Certificate Form 3.PDF | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| AffidavitFile: No Case Affidavit.PDF | - |
| Certificate from Chartered AccountFile: 1 Form 1 - Certificate issued by Chartered Account.PDF | - |
| Certificate issued by ArchitectFile: Architect's Certificate.pdf | - |
| Balance Sheet 2022 - 2023File: 1 Balance Sheet FY 2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: 1 Balance Sheet FY 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: 1 Balance Sheet FY 2020-21.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: 2 Profit and Loss Statement FY 2022-23.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: 2 Profit and Loss Statement FY 2021-22.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: 2 Profit and Loss Account Fy 2020-21.pdf | - |
| Director's Report 2022 - 2023File: 3 Directors Report FY 2022-23.pdf | - |
| Director's Report 2021 - 2022File: 3 Directors Report FY 2021-22.pdf | - |
| Director's Report 2020 - 2021File: 3 Directors Report FY 2020-21.pdf | - |
| Cash Flow Statement 2022 - 2023File: 4 Cash Flow Statement FY 2022-23.pdf | - |
| Cash Flow Statement 2021 - 2022File: 4 Cash Flow Statement FY 2021-22.pdf | - |
| Auditor's Report 2022 - 2023File: 5 Auditors Report FY 2022-23.pdf | - |
| Auditor's Report 2021 - 2022File: 5 Auditors Report FY 2021-22.pdf | - |
| Auditor's Report 2020 - 2021File: 5 Auditors Report FY 2020-21.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: 6 Income Tax Return Acknowledgement FY 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: 6 Income Tax Return Acknowledgement FY 2021-22.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: 6 Income Tax Return Acknowledgement FY 2020-21.pdf | - |
| Plan Approval Letter | - |
| CHESCOM NOC and Receipt | - |
| Approved Plan | - |
| Approved Plan | - |
| Approved Plan | - |
| Approved Plan | - |
| Project Specification | - |
| Approved Plan | - |
| Approved Plan | - |
| ADVOCATE TITLE SEARCH | - |
| Conversion Order | - |
| Agreement for Sale | - |
| Proforma of Allotment Letter | - |
| Brochure | - |
| FORM B | - |
Promoter's earlier projects40
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Nithyanandhasagara 4 | Huyilalu Village, Ilawala Hobli, Mysore Taluk, Mysore District. | Ongoing | Sep 2028 | Not due yet |
| SAHA ELITE - 2 | K. Hemmanahalli Village, Ilawala Hobli, Mysore Taluk and Mysore District. | Ongoing | Sep 2028 | Not due yet |
| JSS 4TH SAGE BLOCK B | Madapura Village and Aragowdanahalli Village, Varuna Hobli, Mysore Taluk and Mysore District. | Ongoing | Jun 2028 | Not due yet |
| Saha Fortune | Huyilalu Village & Belawadi Village Ilawala Hobli, Mysore Taluk, Mysore District. | Ongoing | Sep 2027 | Not due yet |
| Saha Aspire | Marashettihalli Village, Varuna Hobli, Mysore Taluk, Mysore District. | Ongoing | Jul 2027 | Not due yet |
| Athmanandhasgara 6 | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District | Ongoing | Jun 2027 | Not due yet |
| KUBERANANDHASAGARA 12B | Maidanahalli Village, Ilwala Hobli, Mysore Taluk & Mysore District | Ongoing | Mar 2027 | Not due yet |
| JSS 4TH STAGE BLOCK A | Madapura Village, Varuna Hobli, Mysuru Taluk and Mysuru District. | Ongoing | Mar 2027 | Not due yet |
| SHREE ENCLAVE MYSORE (iT PARK) 5 | Janthagalli village, Varuna Hobli, Mysore Taluk and Mysore District . | Ongoing | Sep 2026 | Not delivered |
| Sukhanandhasagara 5 | Bommanahalli Village, Ilawala Hobli, Mysore Taluk, Mysore District. | Ongoing | Aug 2026 | Not delivered |
| Shreesha Hill View 2A | Sarakari Utthanahalli Village, Varuna Hobli, Mysore Taluk, Mysore District. | Ongoing | Aug 2026 | Not delivered |
| JSS 4TH STAGE BLOCK C | Madapura Village, Varuna Hobli, Mysore Taluk, Mysore District. | Ongoing | Aug 2026 | Not delivered |
| Athmanandhasagara 2A | Nagawala Village & Bommanahalli Village, Ilawala Hobli, Mysore Taluk, Mysore District. | Ongoing | Aug 2026 | Not delivered |
| Sukhanandhasagara 4 | Bommanhalli Village, Ilawala Hobli, Mysore Taluk and Mysore District. | Ongoing | Apr 2026 | Not delivered |
| Kuberanandhasagara Layout Phase 8 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout Phase 3 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout Phase 2 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout Phase 1 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout 11 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2025 | Not delivered |
| Kuberanandhasagara Layout 10 | Maidhanahalli Village, Ilwala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 4 | Nagawala Village, Ilwala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 3 | Nagawala Village, Ilwala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 2 | Nagawala Village, Ilwala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara Layout Phase 1 | Nagawala Village, Ilwala Hobli, Mysore Taluk, Mysore District. | Ongoing | May 2025 | Not delivered |
| Athmanandhasagara 5C | Nagawala Village, Ilwala Hobli , Mysuru Taluk and Mysore District. | Ongoing | Dec 2024 | Not delivered |
| Athmanandhasagara 5B | Nagawala Village, Ilwala Hobli , Mysuru Taluk and Mysore District. | Ongoing | Dec 2024 | Not delivered |
| Athmanandhasagara 5A | Nagawala Village, Ilwala Hobli, Mysore Taluk and Mysore District. | Ongoing | Dec 2024 | Not delivered |
| Stavya Layout | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2022 | Not delivered |
| Sree Sapthamathruka Layout Phase 4 | Marashettihalli Village, Varuna Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2022 | Not delivered |
| Paramanandhasagara and Sukhanandhasagara Layout Phase 1 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Paramanandhasagara Layout Phase 2 | Huyilalu village, Ilwala hobli,, Mysore taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Nithyanandhasagara Layout Phase 3 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2022 | Not delivered |
| Nithyanandhasagara Layout Phase 2 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District | Ongoing | May 2022 | Not delivered |
| Nithyanandhasagara Layout Phase 1 | Huyilalu Village, Ilawala Hobli, Mysore Taluk and Mysore District. | Ongoing | May 2022 | Not delivered |
| Venkatagiri Layout | Goruru Village, Kasaba Hobli, Mysore Taluk and Mysore District. | Completed | - | No date filed |
| Venkatadri Layout | Belawadi Village, Ilawala Hobli, Mysore Taluk and Mysore District. | Completed | - | No date filed |
| Svasthi Retreat | Marashettihalli Village, Varuna Hobli, Mysuru Taluk and Mysuru District. | Completed | - | No date filed |
| Sree Sapthamathruka Layout Phase 3 | Yandahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore District. | Completed | - | No date filed |
| Sree Sapthamathruka Layout Phase 2 | andahalli & Madapura Village, Varuna Hobli, Mysore Taluk and Mysore District. | Completed | - | No date filed |
| Sree Sapthamathruka Layout Phase 1/A | Yandahalli Village, Varuna Hobli, Mysore Taluk and Mysore District. | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mysore
Computed across the 700+ Mysore projects on ReraGenie, from their own filings.
Keep Athmanandhasagara-7 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mysore700+ in Mysore
Filed coordinates, straight-line distance. 17 registered projects within 2 km.
Amruthasagara
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
Athmanandhasagara 1A
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
Athmanandhasagara 2A
ESS AND ESS INFRASTRUCTUREPRIVATE LIMITED
Athmanandhasagara 5A
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
Athmanandhasagara 5C
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
G9 Veksha
M/S T Prabhavathi and B R Madam firm
See every Mysore project, with the district possession charts
Builder: ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED
ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED has 25 registrations on RERA Karnataka, including SHREE ENCLAVE MYSORE (iT PARK) 5 and JSS 4TH SAGE BLOCK B. Its filings declare 84 earlier projects, 37 of them declared completed. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Mysore district page.
Frequently asked questions
What are my rights if Athmanandhasagara-7 is delayed beyond 27 Nov 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Athmanandhasagara-7?
The registered promoter entity is ESS AND ESS INFRASTRUCTURE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Athmanandhasagara-7?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Athmanandhasagara-7?
The professionals named in the filing: Engineer: C B Lakshman Rao; Chartered Accountant: Madhusudana. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Athmanandhasagara-7?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.