Registered No litigation declared Others project

SAGAR SANGEET CHS ADITYARAJ PARADISE

By ADITYARAJ HOUSING DEVELOPERS

RG-MH-06101 · RERA P51800051660 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 80%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

SAGAR SANGEET CHS ADITYARAJ PARADISE is a Others project by ADITYARAJ HOUSING DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051660 on 27 Jun 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameSAGAR SANGEET CHS ADITYARAJ PARADISE
  • TypeOthers
  • Location
    • BUILDING NO 259 & 260
    • KANNAMWAR NAGAR-1
    • Hariyali
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • RERA no.P51800051660
  • ReraGenie IDRG-MH-06101

Builder

  • NameADITYARAJ HOUSING DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABWFA6404D1ZE
  • PartnersROCKY RAJKUMAR KHUSHALANI, HITESH LILADHAR SHAHANAND, KISHOR MANJI PATEL

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

56.0%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAGAR SANGEET CHS ADITYARAJ PARADISENA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.

SAGAR SANGEET CHS ADITYARAJ PARADISE: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,242 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 May 2026
LandownerVillageDistrict
KANNAMWAR NAGAR SAGAR SANGEET CHS LTDHariyaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI1242.14
Proposed, not sanctioned1,242 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANNAMWAR NAGAR VIKHROLI EAST
Estimated costRs 42.00 cr
Cost incurredRs 23.50 cr
Work done55.95%
BuildingWingEstimatedIncurred
SAGAR SANGEET CHS ADITYARAJ PARADISENARs 42.00 crRs 23.50 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKIT MAKANI Makani
EngineerNAVINDERPAL SINGH
EngineerYunus Khan
Chartered AccountantCHIRAG SURANA
Chartered AccountantMessrs CAP & Co
PartnerRole in project
ADITYARAJ HOUSING DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Sagar Sangeet CHS Aditiyaraj Paradise Form 2A Engineer Quality Assurance Certificate FY 201 Jun 2026
Withdrawal Update Form 1File: Sagar Sangeet CHS Aditiyaraj Paradise Form 1 Architect Certificate Q4 March 2026.pdf28 May 2026
Withdrawal Update Form 2File: Sagar Sangeet CHS Aditiyaraj Paradise Form 2 Engineer Certificate Q4 March 2026.pdf28 May 2026
Withdrawal Update Form 3File: Sagar Sangeet CHS Adityaraj Paradise Form 3 CA Certificate Q4 March 2026.pdf28 May 2026
Form 1File: Form 1 Bldg no 259 260 Q3 Scan.pdf3 Feb 2026
Form 2File: Form 2 Bldg no 259 260 Q3 Scan.pdf3 Feb 2026
Form 3File: Form 3 Bldg no 259 260 Q3.pdf3 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold declaration bldg no 259 260 Q3.pdf3 Feb 2026
Self-declaration of Quarterly ProgressFile: QPR declaration bldg no259 260 Q3.pdf3 Feb 2026
Form 1File: Form 1 259 260 Q2 Signed.pdf13 Jan 2026
Form 2File: Form 2 Scan 259 260 Q2.pdf13 Jan 2026
Form 3File: Form 3 Scan 259 260 Q2 Signed compressed.pdf13 Jan 2026
Disclosure of Sold and Booked InventoryFile: disclosure sold unsold.pdf13 Jan 2026
Self-declaration of Quarterly ProgressFile: Self declaration QPR.pdf13 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 259-260 signed (2).pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED.pdf19 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf19 Jul 2025
Form 1File: form 1 259-260 signed (2).pdf19 Jul 2025
Form 2File: FORM 2.pdf19 Jul 2025
Form 3File: FORM 3 SIGNED.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Annexure Disclosure Sold Unsold.pdf19 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration QPR.pdf19 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A.pdf19 Jul 2025
Form 1File: FORM 1.pdf11 Jul 2025
Form 2File: Form 2.pdf11 Jul 2025
Form 3File: Form 3 -.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold declaration.pdf11 Jul 2025
Self-declaration of Quarterly ProgressFile: QPR declaration.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE 2024 BLDG NO 259-260.pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf23 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC 27022024.pdf6 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf6 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - QUALITY ASSURANCES.pdf6 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Adityaraj Housing Developers_11zon.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED_11zon.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED FORM 3_11zon.pdf1 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf31 May 2024
Other - FinanceFile: SELF DECLARATION.pdf31 May 2024
Other - FinanceFile: ANNEXURE A NOTARIZE.pdf31 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf25 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A QUALITY ASSURANCES BLDG NO 259 260.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BLDG NO 259 260.pdf20 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 20 DISCLOSURE OF INTEREST RGK.pdf15 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 20 DISCLOSURE OF INTEREST RRK.pdf15 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 20 DISCLOSURE OF INTEREST KMP.pdf15 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 20 DISCLOSURE OF INTEREST HLS.pdf15 Jun 2023
Layout approvalFile: 5 layout.pdf12 Jun 2023
Building plan approvalFile: 6 IOA.pdf12 Jun 2023
PAN CardFile: 1 Pan Card AHD.pdf12 Jun 2023
Copy of the legal title reportFile: 2 Legal Title AHD.pdf12 Jun 2023
Details of encumbrances concerned to FinanceFile: 3B NO ENCUMBRANCE LEGAL.pdf12 Jun 2023
Details of encumbrances concerned to LegalFile: 3B NO ENCUMBRANCE LEGAL.pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: 5 layout.pdf12 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 IOA.pdf12 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 9 CC.pdf12 Jun 2023
Declaration about Commencement CertificateFile: 10 CC DECLARATION.pdf12 Jun 2023
Declaration in FORM BFile: Form B Promoter.pdf12 Jun 2023
CERSAI detailsFile: 18 CERSAI.pdf12 Jun 2023
Proforma of Agreement for saleFile: Proforma of Agreement for Sale.pdf12 Jun 2023
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf12 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 36 FORMAT A.pdf12 Jun 2023
Deviation Report with respect to Allotment letterFile: 37 DEVIATION ALLOTMENT.pdf12 Jun 2023
Deviation Report with respect to model copy of AgreementFile: 38 DEVIATION SALE AGREEMENT.pdf12 Jun 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAGAR SANGEET CHS ADITYARAJ PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANNAMWAR NAGAR-16,700+ in Mumbai Suburban

Builder: ADITYARAJ HOUSING DEVELOPERS

ADITYARAJ HOUSING DEVELOPERS has 1 registration on MahaRERA, including SAGAR SANGEET CHS ADITYARAJ PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAGAR SANGEET CHS ADITYARAJ PARADISE is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAGAR SANGEET CHS ADITYARAJ PARADISE?

The registered promoter entity is ADITYARAJ HOUSING DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABWFA6404D1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAGAR SANGEET CHS ADITYARAJ PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAGAR SANGEET CHS ADITYARAJ PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAGAR SANGEET CHS ADITYARAJ PARADISE?

The professionals named in the filing: Architect: ANKIT MAKANI Makani; Engineer: NAVINDERPAL SINGH; Engineer: Yunus Khan; Chartered Accountant: CHIRAG SURANA; Chartered Accountant: Messrs CAP & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAGAR SANGEET CHS ADITYARAJ PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAGAR SANGEET CHS ADITYARAJ PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAGAR SANGEET CHS ADITYARAJ PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.