Home / Browse projects / Bengaluru Urban, Karnataka / RR SIGNATURE

Registration approved Residential/Group Housing project

RR SIGNATURE

By MSR INFRAA

RG-KA-06431 · RERA PRM/KA/RERA/1251/309/PR/180208/001441

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • Separate project account declared
Mar 2019Possession promisedmoved 12 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 50 documents Report an error

RR SIGNATURE is a Residential/Group Housing project by MSR INFRAA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/180208/001441 on 8 Feb 2018. Possession is promised by 15 Mar 2019. The completion date has moved by 12 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRR SIGNATURE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/180208/001441
  • ReraGenie IDRG-KA-06431

Builder

  • NameMSR INFRAA
  • Entity typePartnership Firm
  • Authorized SignatoryM SANJEEVA RAJU
  • Other registrations1 more →

Key dates

this monthRegisteredFeb 2018First promiseMar 2018Revised toMar 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 Feb 2018
  • Promised completion15 Mar 2019
  • Revised completionRevised to 15 Mar 2019 (originally 15 Mar 2018)
  • Buildings2 building records
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A - Block---1100110
B - Block---1380138

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,616 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 99.81 cr

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/309/PR/190719/001441Mar 2018 → Mar 2019

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/201119/0007098-MSR INFRAA19/11/2020

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/180208/001441 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: MSR Infraa Registration firm.jpg-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate work as on date - Project Extension.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Eng Certificate work as on date - Project Extension.pdf-
CA Certificate for Funds UtilizationFile: CA fund utilized-PENDING.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc Certificate Pending work as on date - Project Extension.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Eng Certificate Pending work as on date - Project Extension.pdf-
CA Certificate for Funds required for Project CompletionFile: CA fund required.pdf-
AffidavitFile: FORM B (New).pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Image (1708)-
Approved plans-i-
approved layout plan-
sale deed-
Proforma of Agreement for sale-
Existing layout plan-
Existing layout plan-
RR Sale Deed & RTC-
Approved plans-i-
Area Development Plan-
Proforma for Allotment letter-
Broucher-
Noc's 6-
Specifications-
ec-
RRs KHATHA-
Development Agr-
Convertion Order-
Balance Sheet 2015 - 2016File: FI 2015 - 16.pdf-
Balance Sheet 2014 - 2015File: FI 2014 - 15.pdf-
Balance Sheet 2013 - 2014File: FI 2013 - 14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: PL 2015 - 16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: PL 2014 - 15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: PL 2013 - 14.pdf-
Director's Report 2015 - 2016File: Director re.pdf-
Director's Report 2014 - 2015File: Director re.pdf-
Director's Report 2013 - 2014File: Director re.pdf-
Cash Flow Statement 2015 - 2016File: Cash flow Statement.pdf-
Cash Flow Statement 2014 - 2015File: Cash flow Statement.pdf-
Auditor's Report 2015 - 2016File: Audit Report 20161.pdf-
Auditor's Report 2014 - 2015File: Audit Report 20151.pdf-
Auditor's Report 2013 - 2014File: Audit Report 20141.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ack 2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ack 2015.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ack 2014.pdf-
form-b-
Prospectus/BrochureFile: RR Signature e-brochure.pdf-
Advertisement Copy 1File: adv copy.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_180208_001441.xlsx-
Occupancy CertificateFile: OC Certificate 11 03 19.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: RERA RRS Project Completion Affidavit.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep RR SIGNATURE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: MSR INFRAA

MSR INFRAA has 2 registrations on RERA Karnataka, including RR WISH TALES and RR SIGNATURE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if RR SIGNATURE is delayed beyond 15 Mar 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of RR SIGNATURE?

The registered promoter entity is MSR INFRAA, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in RR SIGNATURE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RR SIGNATURE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in RR SIGNATURE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RR SIGNATURE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RR SIGNATURE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.