Home / Browse projects / Bengaluru Urban, Karnataka / RK CELESTA
RK CELESTA
RG-KA-70479 · RERA PRM/KA/RERA/1251/308/PR/271023/006349 · Last updated on RERA Karnataka portal: 9 Jan 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
RK CELESTA is a Residential/Group Housing project by RK BUILDERS AND DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/271023/006349 on 27 Oct 2023. Possession is promised by 31 Dec 2025. 1 of the 114 units on this registration are recorded sold or booked, and 18 of 18 construction stages are filed complete.
At a glance
Project
- NameRK CELESTA
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/308/PR/271023/006349
- ReraGenie IDRG-KA-70479
Builder
- NameRK BUILDERS AND DEVELOPERS
- Entity typePartnership Firm
- GSTIN29ABEFR9664C1ZT
- Authorized SignatoryChikkaramareddy Manjunath
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on27 Oct 2023
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed146 files
Current status
Figures as on 9 Jan 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RK CELESTA | - | - | - | 114 | 0 | 114 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 9 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 18 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 9 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | Yes | 100% |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 100% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 100% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | No | Not applicable |
| Terrace | Yes | 100% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership6
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Bharathi Chikkarama Reddy | - | - |
| Hemanth Kumar R | - | - |
| Ramakrishnappa Yellappa | - | - |
| Hemanth Kumar | - | - |
| Bharathi Chikkarami Reddy | - | - |
| Rama Krishnappa Yellappa | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 25.81 cr | Rs 1.19 cr |
| Payment of taxes | Rs 1.14 cr | Rs 78,300 |
| Administrative Costs | Rs 1.08 cr | Rs 1.04 lakh |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 97.00 lakh | Rs 37.25 lakh |
| Cost of Approvals | Rs 70.48 lakh | - |
| On-site expenditure-Consultants Fees | Rs 25.00 lakh | - |
| On-site expenditure-Salaries of workers | - | Rs 3.13 lakh |
| On-site expenditure-Site Overhead | - | Rs 1.53 lakh |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | - | Rs 89,959 |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Blends Design Private Limited |
| Engineer | Concons Consultants Private Limited |
| Chartered Accountant | Bhaskar Reddy V |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed146
As listed on the registration, under the names the promoter filed them with; the newest 80 of 146 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/271023/006349 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RKB Form 4 RERA.pdf | 9 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: KRERA Form-5 Architect (QU) Jan 2026 (1).pdf | 9 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: KRERA -Form -6, Engineer 4(QU) (2).pdf | 9 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 9 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 9 Jan 2026 |
| Q3 2025-26 Fire and Safety | 9 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 9 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 9 Jan 2026 |
| The percentage and cost details on the project ongoing status is updated now as per Form 6File: Form 6 Engineers Certificate.pdf | 12 Oct 2023 |
| The project location details updated and rectified nowFile: Updated project location.pdf | 12 Oct 2023 |
| Annexure - A is updated in the proforma of the Allotment letterFile: RK Builders Allotment letter with Annexure - A.pdf | 12 Oct 2023 |
| Designated Bank A/c as CA certificate is correct and updated in applicationFile: RK Builders RERA 70% Disgnated Account.pdf | 24 Sep 2023 |
| Audited Profit and Loss A/c and Balance Sheet with CA UDINFile: RK Builders CA Certificate.pdf | 24 Sep 2023 |
| Source of Funds to complete the project declaration letter attachedFile: RK Builders and Developers Source of Funds.pdf | 24 Sep 2023 |
| Road widening area Relinquishment deed uploaded nowFile: RK Reliqishment Deed.pdf | 24 Sep 2023 |
| FAR as per santioned plan updated in RERA applicationFile: updated the project ongoing status.pdf | 24 Sep 2023 |
| Unable to edit the Number of parking mentioned in the project details pageFile: RK Builders Car Parking Clarification letter.pdf | 24 Sep 2023 |
| Project ongoing staus amount spent on Project updatedFile: updated the project ongoing status.pdf | 24 Sep 2023 |
| Type of inventory and number of inventory with the BHK wise updatedFile: RK Builders BHK wise details.pdf | 24 Sep 2023 |
| Proforma allotment letterFile: RK Builders And Developers Allotment Letter.pdf | 24 Sep 2023 |
| Source of water supplyFile: RK Builders and Developers Water Supply Clarification.pdf | 24 Sep 2023 |
| Cost details updated with land guidence valueFile: RK Builders CA Certificate.pdf | 24 Sep 2023 |
| Total estimated cost of the project is updated the application now it is matched with CA certificateFile: RK Builders CA Certificate.pdf | 28 Aug 2023 |
| Source of funds already updated in the application Own funds, Bank of Baroda LoanFile: RK Builders CA Certificate.pdf | 28 Aug 2023 |
| Designated bank a/c number as per CA certificate is correct not enabled in the application to updateFile: RK B ACCOUNT.pdf | 28 Aug 2023 |
| Profit and Loss account and Balance sheet 2022-23 is provisional one CA UDIN not availableFile: RKB PRFIT LOSS.pdf | 28 Aug 2023 |
| Single plot layout order now enclsoedFile: Single Layout APPROVAL ORDER.pdf | 28 Aug 2023 |
| CDP map showing the proposed site is uploaded in colourFile: CDP Showing Sy No 182-1 and 182-2.pdf | 28 Aug 2023 |
| Floor Plans Basement and Ground FloorFile: RK Builders Basement and Ground Floor Plan.pdf | 28 Aug 2023 |
| Floor Plans 1st floor and 2nd Floor to 7 Floor Typical PlanFile: RK Builders 1st Floor Plan & Typical Floor Plan 2nd to 7th Floors.pdf | 28 Aug 2023 |
| Floor Plans Terrace PlanFile: RK Builders Terrance Plan.pdf | 28 Aug 2023 |
| Sectional and Elevation PlansFile: RK Builders Sectional and Elevation Drawing.pdf | 28 Aug 2023 |
| Road widening area relinguishment deed uploadedFile: Relinquishment Deed.pdf | 28 Aug 2023 |
| Archiects Certificate With COA number uploadedFile: Architects Certificate.pdf | 28 Aug 2023 |
| Break up of types of Units BHK wise updatedFile: RKB BHKwise inventory.pdf | 28 Aug 2023 |
| FAR as per the sanction planFile: Area Statement.pdf | 28 Aug 2023 |
| Architect COA copyFile: Arcitects COA Number.pdf | 28 Aug 2023 |
| Fire force NOC colourFile: NOC HIGH RISE BUILDING-.pdf | 28 Aug 2023 |
| Airport NOC colourFile: AIRPORTS AUTHORITY OF INDIA NOC.pdf | 28 Aug 2023 |
| BESCOM NOC ColourFile: BESCOM NOC.pdf | 28 Aug 2023 |
| Section 3(1) Notarized AffidavitFile: Notarized affidavit Under Section 3(1).pdf | 28 Aug 2023 |
| Proforma of Allotment letterFile: LETTER OF ALLOTMENT.pdf | 28 Aug 2023 |
| Proforma Areement of SaleFile: RK AGREEMENT f.pdf | 28 Aug 2023 |
| Cost of Construction certified by the registered civil engineerFile: Engineers Certificate Form 3.pdf | 28 Aug 2023 |
| Stability Certificate colouredFile: STRUCTRAL STABILITY.pdf | 28 Aug 2023 |
| Source of from Attible Municiapal Office Water supply NOC colouredFile: ATTIBELE MUNICIPAL OFFICE WATER SUPPLY NOC.pdf | 28 Aug 2023 |
| RK Builders and Developers PANFile: RK B&D pan.pdf | 28 Aug 2023 |
| Certificate of Estimated Cost of Construction from EngineerFile: R K CELESTA - R K BUILDERS & DEVELOPERS_1 (1).pdf | 28 Aug 2023 |
| Unable to Edit the Bank details in ApplicationFile: Unable to Edit the Bank details in Application.pdf | 28 Aug 2023 |
| Unable to Edit the total no of Parkings in the Inventory Page of the applicationFile: Unable to Edit the total no of Parkings.pdf | 28 Aug 2023 |
| Land Cost as per guidance value as per CA certificateFile: R K Builders Form 1 CA Certificate.pdf | 29 Jul 2023 |
| Provisional Profit and Loss accountFile: RKB PRFIT LOSS.pdf | 29 Jul 2023 |
| Plan and area updated as per planFile: Area Statement.pdf | 29 Jul 2023 |
| Compromise memo in OS 3/1992File: OS31992.pdf | 29 Jul 2023 |
| Notarized form BFile: FORMB.pdf | 29 Jul 2023 |
| Notarized JD cum declaration affidavitFile: JD cum Declaration Affidavit.pdf | 29 Jul 2023 |
| All title Deeds and sale deedsFile: SALE DEED.pdf | 29 Jul 2023 |
| Non Litigation affidavitFile: Non Litigation Affidavit.pdf | 29 Jul 2023 |
| RTCFile: RTC RK.pdf | 29 Jul 2023 |
| Commencement CertificateFile: STRR Commencement Certificate.pdf | 29 Jul 2023 |
| Single plot layoutFile: Single Plot layout.PDF | 29 Jul 2023 |
| Single plot layout orderFile: Single plot layout order.pdf | 29 Jul 2023 |
| Certified carpet area calculationFile: Certified Carpet Area calculation.pdf | 29 Jul 2023 |
| CDP map showing proposed siteFile: CDP map showing the proposed site.pdf | 29 Jul 2023 |
| Village Map showing proposed siteFile: Village Map Attibele.pdf | 29 Jul 2023 |
| Sanctioned drawings floor planFile: FLOOR PLANS.pdf | 29 Jul 2023 |
| Relinquishment deedFile: Relinquishment Deed.pdf | 29 Jul 2023 |
| Architect CertificateFile: Architects Certificate (3).pdf | 29 Jul 2023 |
| project ongoing status updateFile: RJ Celesta project Status.pdf | 29 Jul 2023 |
| Inventory type and number of inventory with BHK wise break up details updated carpet area certificatFile: Certified Carpet Area calculation.pdf | 29 Jul 2023 |
| Fire fore NOC self attestedFile: FIire NOC attested.pdf | 29 Jul 2023 |
| Airport NOC self attestedFile: Airport NOC attested.pdf | 29 Jul 2023 |
| BESCOM NOC self attestedFile: BESCOM NOC attested.pdf | 29 Jul 2023 |
| Project specification CertificateFile: Project Specification certificate.pdf | 29 Jul 2023 |
| Amenities and Common area detailsFile: Amenities and common Area details.pdf | 29 Jul 2023 |
| Notarized affidavit 3(1)File: Notarized affidavit Under Section 3(1).pdf | 29 Jul 2023 |
| Proforma Allottement letterFile: LETTER OF ALLOTMENT.pdf | 29 Jul 2023 |
| Proforma Agreement for sale AFSFile: Agreement for sale.pdf | 29 Jul 2023 |
| Cost of construction certificateFile: Engineers Certificate Form 3.pdf | 29 Jul 2023 |
| STP Design drawing certificateFile: STP Design Certificate.pdf | 29 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep RK CELESTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: RK BUILDERS AND DEVELOPERS
RK BUILDERS AND DEVELOPERS has 1 registration on RERA Karnataka, including RK CELESTA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if RK CELESTA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of RK CELESTA?
The registered promoter entity is RK BUILDERS AND DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29ABEFR9664C1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in RK CELESTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at RK CELESTA?
The professionals named in the filing: Architect: Blends Design Private Limited; Engineer: Concons Consultants Private Limited; Chartered Accountant: Bhaskar Reddy V. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RK CELESTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback