ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Regency Luxuria Phase III

Registered No litigation declared Others project

Regency Luxuria Phase III

By REGENCY NIRMAN LTD

RG-MH-23679 · RERA P51700078991 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 28 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
14 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 80%
298 of 298Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

Regency Luxuria Phase III is a Others project by REGENCY NIRMAN LTD in Thane, Maharashtra, registered with MahaRERA as P51700078991 on 28 Jan 2025. Possession is promised by 30 Jun 2028. 0 of the 298 units on this registration are recorded sold or booked, and 14 of 33 construction stages are filed complete.

At a glance

Project

  • NameRegency Luxuria Phase III
  • TypeOthers
  • Location
    • Golavali
    • Dombivli
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700078991
  • ReraGenie IDRG-MH-23679

Builder

  • NameREGENCY NIRMAN LTD
  • Entity typeCompany
  • CINU41001MH2005PLC153966
  • GSTIN27AADCR5058B1ZK
  • Managing DirectorMAHESH SATYANARAYAN KHAIRARI
  • Managing DirectorMAHESH SATYANARAYAN KHAIRARI
  • DirectorsSubhash Satyanarayan Khairari, Ramkishore SATYANARAYAN KHAIRARI, Anil Jessaram Bathija, Manoj Ramawtar Lalpuria, Niraj Ramakant Sharma
  • DirectorsRakesh Ratan Kalwani, Udhav M Rupchandani, Vicky Udhav Rupchandani
  • Other registrations28 more →
  • Completed19 of 29
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredJan 2025PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Jan 2025
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed129 files

Current status

0%0 of 298 units booked

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 5NA34302400240
Commercial Building No 1NA2005050
Club House Ground FloorNA20088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

Building No 554%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Commercial Building No 140%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor45%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Club House Ground Floor45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed194

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots194
Closed/Covered194
BuildingClosed/CoveredTotal
Building No 5180180
Commercial Building No 11313
Club House Ground Floor11

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,205 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Aug 2025

Approvals and building plan

Sanctioning authorityKalyan Dombivli Muncipal Corporation
Permissible FSI33126.83
Proposed, not sanctioned33,127 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRABHAT BHAVAN, BLOCK B, 1ST FLOOR, 96, L.B.S. MARG, OPP. CIPLA, VIKHROLI (W), MUMBAI 400083.

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITAN CONSULTANTS
EngineerPANKAJ PASORIA
EngineerSWAMY MUSTIPALLI
Chartered AccountantN G Kukreja & Co
Chartered AccountantMehta & Shah
Chartered AccountantGUPTA RUSTAGI AND CO
PartnerRole in project
REGENCY NIRMAN LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Regency Luxuria Phase 3 31032026.pdf29 Jun 2026
Form 1File: Form 1 Architect Certificate Phase 3 300925.pdf19 Jun 2026
Form 2File: Form 2 Engineer Certificate Phase 3.pdf19 Jun 2026
Form 3File: Form 3 CA Certificate Phase3.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2.pdf19 Jun 2026
Form 1File: Form 1 Architect Certificate Phase 3 311225.pdf19 Jun 2026
Form 2File: Form 2 Engineer Certificate Phase 3.pdf19 Jun 2026
Form 3File: Form 3 CA Certificate Phase3.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q3.pdf19 Jun 2026
Form 1File: Form 1 Architect Certificate Luxuria Phase 3 31326.pdf19 Jun 2026
Form 2File: Form 2 Engineer Certificate Phase 3.pdf19 Jun 2026
Form 3File: Form 3 CA Certificate Phase3.pdf19 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q4.pdf19 Jun 2026
Form 1File: Form 1 Luxuria Phase 320250114_031811.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE Comp.pdf13 Apr 2026
Form 3File: Form 3.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold q4.pdf13 Apr 2026
Form 1File: Form 1 Luxuria Phase 320250114_031811.pdf13 Apr 2026
Form 2File: ENGINEER CERTIFICATE Comp.pdf13 Apr 2026
Form 3File: Form 3.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold q4.pdf13 Apr 2026
Form 5 (FY 2024-2025)File: Luxuria P III.pdf3 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE REGENCY LUXURIA PH-3.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Luxuria Phase III sold and unsold - final.pdf19 Apr 2025
Other - TechnicalFile: FORM 2A - QUALITY ASSURANCE CERTIFICATE REGENCY LUXURIA PHASE III.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Revised 24125.pdf24 Jan 2025
Layout approvalFile: Layout Plan Comp.pdf21 Jan 2025
Copy of Layout Approval (in case of layout)File: Layout Plan Comp.pdf21 Jan 2025
Declaration about Commencement CertificateFile: Format D Revised.pdf21 Jan 2025
Other - FinanceFile: Revised CLARIFICATION REGARDING BUILTUP AREA PHASE 3 REGENCY LUXURIA 16-1-25.pdf16 Jan 2025
Other - LegalFile: SUMMARY OF DOCUMENTS.pdf14 Jan 2025
Other - FinanceFile: DECLARATION CUM UNDERTAKING LUXURIA PHASE III.pdf14 Jan 2025
Other - LegalFile: गोळवली_60_1_क_Satbara_04-01-2025.pdf13 Jan 2025
Other - LegalFile: 19-30.pdf13 Jan 2025
Other - LegalFile: 1-25.pdf13 Jan 2025
Other - LegalFile: 26-40.pdf13 Jan 2025
Other - LegalFile: 41-55.pdf13 Jan 2025
Other - LegalFile: 56-66.pdf13 Jan 2025
Other - LegalFile: 67-80.pdf13 Jan 2025
Other - LegalFile: 77-86.pdf13 Jan 2025
Other - LegalFile: 1-12.pdf13 Jan 2025
Other - LegalFile: 13-25.pdf13 Jan 2025
Other - LegalFile: 26-40.pdf13 Jan 2025
Other - LegalFile: 41-55.pdf13 Jan 2025
Other - LegalFile: 56-68.pdf13 Jan 2025
Other - LegalFile: 1-12.pdf13 Jan 2025
Other - LegalFile: 13-23.pdf13 Jan 2025
Other - LegalFile: 24-36.pdf13 Jan 2025
Other - LegalFile: 1-18.pdf13 Jan 2025
Other - LegalFile: 31-43.pdf13 Jan 2025
Other - LegalFile: Pages from 16-29.pdf13 Jan 2025
Other - LegalFile: 3 5216.pdf13 Jan 2025
Other - LegalFile: 4Online Index-II 5216 2137 sqm 11321.pdf13 Jan 2025
Other - LegalFile: 5 and 10 Online Index-II 5216 1250 exchange.pdf13 Jan 2025
Other - LegalFile: 6 53 541.pdf13 Jan 2025
Other - LegalFile: 7542.pdf13 Jan 2025
Other - LegalFile: 8542 2.pdf13 Jan 2025
Other - LegalFile: 9542 3.pdf13 Jan 2025
Other - LegalFile: 11542 4.pdf13 Jan 2025
Other - LegalFile: गोळवली_59_2_ब_Satbara (1).pdf13 Jan 2025
Other - LegalFile: 13 601 C.pdf13 Jan 2025
Other - LegalFile: 15 59 2B.pdf13 Jan 2025
Other - LegalFile: गोळवली_52_16_Satbara_04-01-2025.pdf13 Jan 2025
Other - LegalFile: गोळवली_53_Satbara_04-01-2025.pdf13 Jan 2025
Other - LegalFile: गोळवली_54_1_Satbara_04-01-2025.pdf13 Jan 2025
Other - LegalFile: गोळवली_54_2_1_Satbara_04-01-2025.pdf13 Jan 2025
Other - LegalFile: गोळवली_54_2_3_Satbara_04-01-2025.pdf13 Jan 2025
Other - LegalFile: 44-59.pdf13 Jan 2025
Other - LegalFile: 25-34.pdf13 Jan 2025
Other - LegalFile: 13-24.pdf13 Jan 2025
Other - LegalFile: 1-12.pdf13 Jan 2025
Other - LegalFile: 39-49.pdf13 Jan 2025
Other - LegalFile: 27-38.pdf13 Jan 2025
Other - LegalFile: 16-26.pdf13 Jan 2025
Other - LegalFile: 1-15.pdf13 Jan 2025
Other - LegalFile: 16-29.pdf13 Jan 2025
Other - LegalFile: 1-15.pdf13 Jan 2025
Other - LegalFile: 16-29.pdf13 Jan 2025
Other - LegalFile: 1-15.pdf13 Jan 2025
Other - LegalFile: 59-72.pdf13 Jan 2025

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise9 delivered late3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Sarvam Phase 7Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017Late, Jul 2017
Regency Sarvam Phase 6Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017May 2017
Regency Sarvam Phase 5Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605134-CompletedDec 2016Late, Feb 2017
Regency Sarvam Phase 4Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605234-CompletedApr 2016Late, Jun 2016
Regency ClassicSurvey NO 54 Hissa no 4 Mumbai Bangalore Highway Near Mahindra Showroom Baner Pune-411045132-CompletedOct 2015Late, Mar 2016
Regency Sarvam Phase 3Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605552-CompletedMar 2015Late, Dec 2015
Regency Sarvam Phase 2Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605424-CompletedMar 2015Late, Aug 2015
Regency HeightsNr Brahmand Phase-1 AzadNagar Kolshet Road Thane W - 400607320-CompletedMar 2015Late, Mar 2015
Regency CrestRegency Crest Plot no 40 Sector 19 Kharghar Navi Mumbai - 410 210142-CompletedJun 2014Late, Dec 2014
Regency WillowsPlot no 61 Green Valley Behind Fariyas Hotel Tungari Lonavala24-CompletedFeb 2014Feb 2014
Regency Sarvam Phase 1Gupta Estates Near Titwala Railway Station Ganpati Mandir Road Titwala E - 421605.350-CompletedOct 2013Late, Mar 2014

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Regency Luxuria Phase III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivli7,600+ in Thane

2 kmRegency Luxuria Phase IICompleted 22Lapsed / revoked 15Other 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 100 registered projects within 2 km.

Builder: REGENCY NIRMAN LTD

REGENCY NIRMAN LTD has 29 registrations on MahaRERA, including Regency Antilia Phase - I and Regency Antilia Phase - II. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 11 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Regency Luxuria Phase III is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Regency Luxuria Phase III?

The registered promoter entity is REGENCY NIRMAN LTD, a company as per the filing. Its CIN U41001MH2005PLC153966 and GSTIN 27AADCR5058B1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Regency Luxuria Phase III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Regency Luxuria Phase III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Regency Luxuria Phase III?

The professionals named in the filing: Architect: VITAN CONSULTANTS; Engineer: PANKAJ PASORIA; Engineer: SWAMY MUSTIPALLI; Chartered Accountant: N G Kukreja & Co; Chartered Accountant: Mehta & Shah; Chartered Accountant: GUPTA RUSTAGI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Regency Luxuria Phase III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Regency Luxuria Phase III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Regency Luxuria Phase III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.