Home / Browse projects / Thane, Maharashtra / Regency Luxuria Phase II

Registered No litigation declared Residential / Group Housing project

Regency Luxuria Phase II

By REGENCY NIRMAN LTD

RG-MH-06819 · RERA P51700053314 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 28 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 97%
88 of 240Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Regency Luxuria Phase II is a Residential / Group Housing project by REGENCY NIRMAN LTD in Thane, Maharashtra, registered with MahaRERA as P51700053314 on 27 Oct 2023. Possession is promised by 31 Dec 2026. 152 of the 240 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameRegency Luxuria Phase II
  • TypeResidential / Group Housing
  • Location
    • Golavali
    • Dombivli
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • RERA no.P51700053314
  • ReraGenie IDRG-MH-06819

Builder

  • NameREGENCY NIRMAN LTD
  • Entity typeCompany
  • CINU41001MH2005PLC153966
  • GSTIN27AADCR5058B1ZK
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorMAHESH SATYANARAYAN KHAIRARI
  • Other registrations28 more →
  • Completed19 of 29
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects12 →

Key dates

this monthRegisteredOct 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

63%152 of 240 units booked
94.2%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 3 - RubyNA34302400240

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 97%.

Building No 3 - Ruby: 92% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes15%
Street LightingYes0%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed208

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots208
Closed/Covered208

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,707 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Dec 2025

Approvals and building plan

Sanctioning authoritykalyan dombivali muncipal corporation
Permissible FSI24777.37
Proposed, not sanctioned24,777 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVikhroli
Estimated costRs 69.00 cr
Cost incurredRs 65.00 cr
Work done94.2%
BuildingWingEstimatedIncurred
Building No 3 - RubyNARs 63.00 crRs 61.00 cr
-NARs 6.00 crRs 4.00 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVITAN CONSULTANTS
EngineerRAM TALREJA
EngineerPANKAJ PASORIA
EngineerSWAMY AJANNA MUSTIPALLI
Chartered AccountantAjay Hassija
Chartered AccountantNITIN KUKREJA
Chartered AccountantGUPTA RUSTAGI AND CO
Chartered AccountantAVG & ASSOCIATES
PartnerRole in project
REGENCY NIRMAN LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q1 Form 1 Luxuria Phase II.pdf20 Jul 2026
Withdrawal Update Form 2File: Q1 Form 2 Luxuria Phase II.pdf20 Jul 2026
Withdrawal Update Form 3File: Q1 Form 3 Luxuria Phase II.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A - Regency Luxuria Phase 2.pdf27 Jun 2026
Withdrawal Update Form 1File: Form 1 Luxuria Phase 2 Q4.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2 Luxuria Phase 2 31326.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3 Luxuria Phase 2 31326.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1 Q3 Luxuria Phase 2.pdf27 May 2026
Withdrawal Update Form 2File: ENGINEER'S CERTIFICATE REGENCY LUXURIA PHASE II.pdf27 May 2026
Withdrawal Update Form 3File: Luxuria Phase II CA CERTIFICATE.pdf27 May 2026
Withdrawal Update Form 1File: Regency Luxuria Phase II - Architect Certificate Form I dt 30062024.pdf13 Apr 2026
Withdrawal Update Form 1File: Regency Luxuria Phase II - Architect Certificate Form I dt 30062024.pdf13 Apr 2026
Withdrawal Update Form 2File: ENGINEER'S CERTIFICATE REGENCY LUXURIA PHASE II.pdf13 Apr 2026
Withdrawal Update Form 2File: ENGINEER'S CERTIFICATE REGENCY LUXURIA PHASE II.pdf13 Apr 2026
Withdrawal Update Form 3File: Luxuria Phase II CA CERTIFICATE.pdf13 Apr 2026
Withdrawal Update Form 3File: Luxuria Phase II CA CERTIFICATE.pdf13 Apr 2026
Form 5 (FY 2024-2025)File: Luxuria P II.pdf3 Jan 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REGENCY LUXURIA PHAS II CA CERTIFICATE - converted.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE REGENCY LUXURIA PHASE II.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - ARCHITECT CERTIFICATE BLDG REGENCY LUXURIA PHASE 2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOUSRE OF SOLD UNSOLD BOOKS REGENCY LUXURIA PHASE - II.pdf18 Apr 2025
Other - TechnicalFile: FORM 2A - QUALITY ASSURANCE CERTIFICATE REGENCY LUXURIA PHASE II.pdf18 Apr 2025
Layout approvalFile: HPSCANNER9066_compressed.pdf13 Mar 2025
Copy of Layout Approval (in case of layout)File: HPSCANNER9066_compressed.pdf13 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: 20241114081227.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: REGENCY LUXURIA PHASE 2 DISCLOSURE OF SOLD UNSOLD.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - REGENCY LUXURIA PHASE 2 BLDG NO-3.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: REGENCY LUXURIA PHASE 2.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: REGENCY LUXURIA FORM 1 PHASE II.pdf18 Dec 2024
Disclosure of sold/ booked inventoryFile: REGENCY LUXURIA PHASE 2 DISCLOSURE.pdf9 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1 Other - Technical (1).pdf8 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Regency Luxuria Phase II - Architect Certificate Form I dt 30062024.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: Regency Luxuria Phase II - Disclosure of Sold Booked Inventory dt 30062024.pdf6 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory Building No 3.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 - Bldg - 3.pdf20 Apr 2024
Other - TechnicalFile: Form 2A.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Regency Luxuria Bldg 3 Architect Certificate Form 1 dt 30122023.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory - Phase II.pdf16 Jan 2024
Proforma of Agreement for saleFile: Agreement for SAle 191023.pdf19 Oct 2023
Layout approvalFile: 6.pdf9 Oct 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf9 Oct 2023
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf9 Oct 2023
Details of encumbrances concerned to FinanceFile: Letter about Search Report_02-10-2023.pdf9 Oct 2023
Details of encumbrances concerned to LegalFile: Letter about Search Report_02-10-2023.pdf9 Oct 2023
Copy of Layout Approval (in case of layout)File: 6.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf9 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf9 Oct 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION.pdf9 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report for agreement for sale.pdf9 Oct 2023
Copy of the legal title reportFile: Title Report Phase 2.pdf5 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised CC 110923.pdf5 Oct 2023
Declaration about Commencement CertificateFile: FORMAT-D Declaration For CC.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Revised Building No 3.pdf5 Oct 2023
CERSAI detailsFile: UNDERTAKING for Cersai.pdf5 Oct 2023
Proforma of Allotment letterFile: Model format of allottment letter.pdf5 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration For Bank Account Number.pdf5 Oct 2023
PAN CardFile: 1 PAN Card (1).pdf3 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encrumberance Certificate Legal.pdf3 Oct 2023
Details of encumbrances concerned to LegalFile: No Encrumberance Certificate Legal.pdf3 Oct 2023
Declaration in FORM BFile: AFFIDAVIT Form B.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANIL JESSARAM BHATIJA.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MAHESH S KHAIRARI.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MANISHA A AGARWAL.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MANOJ LALPURIA.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: NIRAJ SHARMA.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RAKESH R KALWANI.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RAMKISHORE S KHAIRARI.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SUBHASH S KHAIRARI.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: UDHAV RUPCHANDANI.pdf3 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: VICKY RUPCHANDANI.pdf3 Oct 2023

Promoter's earlier projects14

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise9 delivered late3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Antilia Phase VIII AvanaP51700052485Mharal, Thane475Sep 2023OngoingDec 2026Not due yet
Regency Sarvam Phase 7Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017Late, Jul 2017
Regency Sarvam Phase 6Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605271-CompletedMay 2017May 2017
Regency Sarvam Phase 5Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605134-CompletedDec 2016Late, Feb 2017
Regency Sarvam Phase 4Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605234-CompletedApr 2016Late, Jun 2016
Regency ClassicSurvey NO 54 Hissa no 4 Mumbai Bangalore Highway Near Mahindra Showroom Baner Pune-411045132-CompletedOct 2015Late, Mar 2016
Regency Sarvam Phase 3Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605552-CompletedMar 2015Late, Dec 2015
Regency Sarvam Phase 2Gupta Estates Near Titwala Railway Station Ganpati Mandir road Titwala E - 421605424-CompletedMar 2015Late, Aug 2015
Regency HeightsNr Brahmand Phase-1 AzadNagar Kolshet Road Thane W - 400607320-CompletedMar 2015Late, Mar 2015
Regency CrestRegency Crest Plot no 40 Sector 19 Kharghar Navi Mumbai - 410 210142-CompletedJun 2014Late, Dec 2014
Regency WillowsPlot no 61 Green Valley Behind Fariyas Hotel Tungari Lonavala24-CompletedFeb 2014Feb 2014
Regency Sarvam Phase 1Gupta Estates Near Titwala Railway Station Ganpati Mandir Road Titwala E - 421605.350-CompletedOct 2013Late, Mar 2014

How this compares with Thane

63%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Regency Luxuria Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivli7,600+ in Thane

Builder: REGENCY NIRMAN LTD

REGENCY NIRMAN LTD has 29 registrations on MahaRERA, including Regency Antilia Phase - I and Regency Antilia Phase - II. Its filings disclose 12 earlier MahaRERA projects: declares 2 of 11 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Regency Luxuria Phase II is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Regency Luxuria Phase II?

The registered promoter entity is REGENCY NIRMAN LTD, a company as per the filing. Its CIN U41001MH2005PLC153966 and GSTIN 27AADCR5058B1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Regency Luxuria Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Regency Luxuria Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Regency Luxuria Phase II?

The professionals named in the filing: Architect: VITAN CONSULTANTS; Engineer: RAM TALREJA; Engineer: PANKAJ PASORIA; Engineer: SWAMY AJANNA MUSTIPALLI; Chartered Accountant: Ajay Hassija; Chartered Accountant: NITIN KUKREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Regency Luxuria Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Regency Luxuria Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Regency Luxuria Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.