Redevelopment of Neelkanth Park
RG-MH-06875 · RERA P51800056326 · Last updated on MahaRERA portal: 12 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- Rs 10.00 crore secured on the land, in favour of Truhome Finance Ltd
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Redevelopment of Neelkanth Park is a Residential / Group Housing project by PGD SKYLINE LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056326 on 29 May 2024. Possession is promised by 31 Dec 2028. 6 of the 48 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameRedevelopment of Neelkanth Park
- TypeResidential / Group Housing
- Location
- Ghatkopar-Kirol
- Rajawadi
- Rajawadi
- Ghatkopar East
- Ghatkopar
- Kurla
- Mumbai Suburban
- 400077
- Pincode400077
- RERA no.P51800056326
- ReraGenie IDRG-MH-06875
Builder
- NamePGD SKYLINE LLP
- Entity typePartnership
- PartnersMaulik Harshad Dave, Devang Harshad Dave, Jaysinh Ambaprasad Dave, Jenn Realtors and Developers LLP
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed73 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Redevelopment of Neelkanth Park | NA | 12 | 11 | 48 | 0 | 48 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 50%.
Redevelopment of Neelkanth Park: 42% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| NEELKANTH PARK CHS LTD. | Ghatkopar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Redevelopment of Neelkanth Park | NA | Rs 20.67 cr | Rs 10.25 cr |
| - | NA | Rs 42.35 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dilip Sanghvi Consultants Dave |
| Engineer | Dilip P Parekh Dave |
| Engineer | Shwetank Agnihotri |
| Chartered Accountant | Hay and Associates LLP |
| Partner | Role in project |
|---|---|
| PGD SKYLINE LLP | - |
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 191/2022 | High Court Mumbai | Pending |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed73
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: Amended_Approved_Plan_compressed below 5mb.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Architect Certificate 31032026.PDF | 12 May 2026 |
| Withdrawal Update Form 2File: 8th RERA Form 2 Engineers Certificate 2026-03-31.PDF | 12 May 2026 |
| Withdrawal Update Form 3File: Form_3_PGD_Skyline_LLP 31032026.pdf | 12 May 2026 |
| Building plan approvalFile: Amended_Approved_Plan_compressed below 5mb.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Architect Certificate 31122025.PDF | 31 Jan 2026 |
| Withdrawal Update Form 2File: 7th RERA Form 2 Engineers Certificate 2025-12-31.PDF | 31 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate 2025-12-31.PDF | 31 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Architect Certificate.PDF | 28 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate 30092025.PDF | 28 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate 2025-09-30.PDF | 28 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Architect Certificate.PDF | 19 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 - Architect Certificate.PDF | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Dtd 20241231 .PDF | 19 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 Engineer Certificate Dtd 20241231 .PDF | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 PGD Skyline LLP.PDF | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 PGD Skyline LLP.PDF | 19 Jul 2025 |
| Commencement certificateFile: Full CC 2474785_FurtherCC_signed.pdf | 16 Jul 2025 |
| Declaration and undertaking (Annexure A)File: d - Declaration Cum Undertaking (Annex A).PDF | 16 Jul 2025 |
| Form 1File: 4th Form1 Architect Certificate Dtd 20250331.PDF | 16 Jul 2025 |
| Form 2File: Form 2 Engineer Certificate Dtd 20250331 .PDF | 16 Jul 2025 |
| Form 3File: Form 3 CA Certificate 2025-03-31.PDF | 16 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 4 Disclosure of Sold Booked Inventory Dtd 31032025.PDF | 16 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 20250331.pdf | 17 Apr 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A with Other Documents New.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4th Form1 Architect Certificate Dtd 20250331.PDF | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dtd 20250331 .PDF | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 4 Disclosure of Sold Booked Inventory Dtd 31032025.PDF | 15 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encumberance on Project.PDF | 22 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumberance on Project.PDF | 22 Mar 2025 |
| Other - FinanceFile: Letter to MahaRERA with Disclosure.PDF | 22 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 20241231.PDF | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dtd 20241231 .PDF | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3rd Form1 Architect Certificate Dtd 20250115.PDF | 17 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: 3 Disclosure of Sold Booked Inventory 31122024.PDF | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate 2024-06-30 New.pdf | 25 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate 2024-09-30.PDF | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3rd RERA Architect Certificate.PDF | 23 Dec 2024 |
| Building plan approvalFile: Amended Plan dtd 24102024.pdf | 7 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Plan dtd 24102024.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3rd RERA Form 2 Engineers Certificate 2024-09-30.PDF | 28 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2nd RERA Form 2 Engineers Certificate 2024-06-30.PDF | 26 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 1 Disclosure of Sold Booked Inventory 30062024.PDF | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 2 Disclosure of Sold Booked Inventory 30092024.PDF | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2nd RERA Architect certificate (2024-07-08).PDF | 13 Aug 2024 |
| Other - LegalFile: Supplementary_LLP_Agreement_of_PGD_Skyline_LLP.pdf | 9 May 2024 |
| Other - TechnicalFile: Annexure A - Order No 50.PDF | 6 May 2024 |
| Copy of the legal title reportFile: Final Title_Report_11zon.pdf | 26 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 26 Apr 2024 |
| Declaration about Commencement CertificateFile: Format_D_-_Declaration_of_CC.PDF | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_CA_Certificate_Sd.PDF | 26 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annex_A_-_PGD_Skyline_LLP and partners.PDF | 26 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Nikhil and Jenil - Jenn_Realtors.PDF | 26 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation_Report_of_Allotment_Letter_Redevelopment_of_Neelkanth_Park_PGD_Skyline_LLP.PDF | 26 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation_Report_of_AFS_Redevelopment_of_Neelkanth_Park_PGD_Skyline_LLP.PDF | 26 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance - Finance.PDF | 20 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance - Legal.PDF | 20 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance - Finance.PDF | 20 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance - Legal.PDF | 20 Apr 2024 |
| Declaration in FORM BFile: Form B - Promoter.pdf | 20 Apr 2024 |
| CERSAI detailsFile: Cersai_Declaration.PDF | 20 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format_A_New.PDF | 20 Apr 2024 |
| Layout approvalFile: Layout pg 1.pdf | 11 Apr 2024 |
| Building plan approvalFile: Layout pg 1.pdf | 11 Apr 2024 |
| Building plan approvalFile: Layout pg 2-3.pdf | 11 Apr 2024 |
| Building plan approvalFile: Layout pg 4-6.pdf | 11 Apr 2024 |
| PAN CardFile: PGD SKYLINE LLP PAN.PDF | 11 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: Layout pg 1.pdf | 11 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout pg 1.pdf | 11 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout pg 2-3.pdf | 11 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout pg 4-6.pdf | 11 Apr 2024 |
| Proforma of Agreement for saleFile: Agreement for Sale_RERA_neelkanth_park_07052024 (1) (1).pdf | 11 Apr 2024 |
| Proforma of Allotment letterFile: Allotment_Letter_Redevelopment_of_Neelkanth_Park_PGD_Skyline_LLP_07052024.pdf | 11 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- All 73 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Redevelopment of Neelkanth Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Rajawadi, Ghatkopar East6,700+ in Mumbai Suburban
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: PGD SKYLINE LLP
PGD SKYLINE LLP has 1 registration on MahaRERA, including Redevelopment of Neelkanth Park. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Redevelopment of Neelkanth Park is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Redevelopment of Neelkanth Park?
The registered promoter entity is PGD SKYLINE LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Redevelopment of Neelkanth Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Redevelopment of Neelkanth Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Redevelopment of Neelkanth Park?
The professionals named in the filing: Architect: Dilip Sanghvi Consultants Dave; Engineer: Dilip P Parekh Dave; Engineer: Shwetank Agnihotri; Chartered Accountant: Hay and Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Redevelopment of Neelkanth Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback