Registration approved No litigation declared Residential/Group Housing project

RANKA ANKURA

By RANKA PROPERTIES PRIVATE LIMITED

RG-KA-25960 · RERA PRM/KA/RERA/1251/472/PR/251024/007176 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2029Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 98%
311 of 410Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 163 documents Report an error

RANKA ANKURA is a Residential/Group Housing project by RANKA PROPERTIES PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/251024/007176 on 25 Oct 2024. Possession is promised by 31 Dec 2029. 99 of the 410 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameRANKA ANKURA
  • TypeResidential/Group Housing
  • Location
    • Yelahanka
    • Bengaluru Urban
    • 560064
  • Pincode560064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/472/PR/251024/007176
  • ReraGenie IDRG-KA-25960

Builder

  • NameRANKA PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • CINU68100KA2023PTC170992
  • GSTIN29AAMCR4991C1ZX
  • Authorized SignatoryPIYUSH RANKA
  • CeoGAURAV RANKA
  • DirectorsGAURAV RANKA, PIYUSH RANKA, BHAVIK RANKA, YASH RANKA
  • Project HeadYASH RANKA

Key dates

this monthRegisteredOct 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 Oct 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings4 building records
  • Documents filed163 files

Current status

24%99 of 410 units booked
27.5%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 1---1000100
2---1000100
3---1050105
4---1050105

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 98%.

Building: 22% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work98%
Foundation footing work92%
Upto Plinth Level48%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)47%
Retaining wall (All types)27%
RCC or MS Framed structure17%
Masonry Construction17%
Plastering inside , outside & Ceiling10%
Joinery: Doors, Windows, Ventilators etc10%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)10%
Railing and Grill fixing10%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings10%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes40%
Sewage and Drainage SystemYes80%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes3%
Electricity supply transformer and substationYes0%
Storm water drainsYes3%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes2%
Street LightingYes2%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes92%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership12

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,119 sq m
Named landowners12
LandownerVillageDistrict
Syed Hasnain Tayyeb Ashraf--
Mr. MEHUL KISHORE SHAH--
Mr. SANJAY KUMAR CHOUDHARY--
Mr. RAJAN KUMAR JHA--
Syed Hasnain Tayyeb Ashraf--
Mr. MEHUL KISHORE SHAH--
Mr. SANJAY KUMAR CHOUDHARY--
Mr. RAJAN KUMAR JHA--
Syed Hasnain Tayyeb Ashraf--
Mr. MEHUL KISHORE SHAH--
Mr. SANJAY KUMAR CHOUDHARY--
Mr. RAJAN KUMAR JHA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 219.51 cr
Cost incurredRs 60.27 cr
Spent of the estimate27.46%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 189.96 crRs 55.69 cr
Payment of taxesRs 17.13 crRs 6.38 lakh
Principal sum and interest payable to financial institutions-Scheduled BanksRs 12.42 crRs 4.51 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEHUL SHAH
EngineerG H BASAVARAJ
Chartered AccountantMS ARINAYA & ASSOCIATES

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed163

As listed on the registration, under the names the promoter filed them with; the newest 80 of 163 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/251024/007176 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Ranka Form-4 Q2_SD.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Ranka Ankura -Form 5 Architect.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate signed.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Q1_SD.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 - Engineer Certificate.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 Mar 26 - Sd.pdf29 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: RA_FORM5_Architecht certificate.pdf29 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Ranka Form-6 - April-26.pdf29 Apr 2026
Q4 2025-26 Water supply and sewage board29 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)29 Apr 2026
Q4 2025-26 KPTCL- BESCOM29 Apr 2026
Q4 2025-26 Fire and Safety29 Apr 2026
Q4 2025-26 Airport Authority of India29 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate Form 4.pdf28 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Architect certificate - Form 5_.pdf28 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate - Form 6.pdf28 Jan 2026
Q3 2025-26 Water supply and sewage board28 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)28 Jan 2026
Q3 2025-26 KPTCL- BESCOM28 Jan 2026
Q3 2025-26 Fire and Safety28 Jan 2026
Q3 2025-26 Airport Authority of India28 Jan 2026
Additional fee paid recieptFile: CR1024021600223062.pdf24 Oct 2024
RTC 82/2File: RTC of Sy No 82_2 Bellahalli village for the year 2024-25.pdf24 Oct 2024
RTC 83/2File: RTC of Sy No 83_2 Bellahalli village for the year 2024-25.pdf24 Oct 2024
RTC 84/2File: RTC of Sy No 84_2 Bellahalli village for the year 2024-25.pdf24 Oct 2024
EC from 1/4/2009 to till dateFile: ECC-27102023-4581098.pdf24 Oct 2024
ADLR survey sketchFile: ADLR Bellahalli sketch.pdf24 Oct 2024
Building LicenseFile: BBMP Building License.pdf24 Oct 2024
Approved building planFile: BBMP approved plan.pdf24 Oct 2024
KSPCB NOC Fee paid recieptFile: PCB acknowledgement.jpeg24 Oct 2024
KSPCB NOC AcknowledgementFile: PCB Inspection_Report_Ranka 12 07 2024 after fee payment.pdf24 Oct 2024
STP design drawingFile: RANKA THANISANDRA-STP & UG SUMP LAYOUT Layout.pdf24 Oct 2024
STP design demarcationFile: RANKA THANISANDRA-STP & UG SUMP LAYOUT.pdf24 Oct 2024
BWSSB NOC DDFile: RPPL - BWSSB DD copy.pdf24 Oct 2024
BESCOM NOC DDFile: RPPL - BESCOM - DD copy.pdf24 Oct 2024
Yelahanka Airforce AirbaseFile: Yelahanka NOC acknowledgement.pdf24 Oct 2024
Land cost calculationFile: Confirmation of Land Cost.pdf24 Oct 2024
FORM-3File: Ranka Ankura - Certificate by Engineer.pdf24 Oct 2024
proforma of Agreement for SaleFile: AFS Ranka.pdf24 Oct 2024
Digitally signed BWSSB NOCFile: BWSSB NOC.pdf24 Oct 2024
section 3(1) notarized affidavitFile: Sec3 Notarised Affidavit RPPL.pdf24 Oct 2024
Non Litigation AffidavitFile: non litigation.pdf24 Oct 2024
section 3(1) notarized affidavitFile: Sec3 Notarised Affidavit RPPL.pdf24 Oct 2024
Upload passbook/ pass sheets of 100%, 70% & 30% account details, the bank account name should be asFile: 100_ Collection ac statement.pdf8 Oct 2024
Upload passbook/ pass sheets of 100%, 70% & 30% account details, the bank account name should be asFile: 70_ RERA designated ac statement.pdf8 Oct 2024
Upload passbook/ pass sheets of 100%, 70% & 30% account details, the bank account name should be asFile: 30_ Current ac statement.pdf8 Oct 2024
Upload the bank affidavit in the prescribed format.File: RPPL - Bank Affidavit.pdf8 Oct 2024
Upload the profit and loss account, balance sheet, and ITR for 2020-21, 2021-22 & 2022-23 with schedFile: RPPL - Financials for the FY 2023-24.pdf8 Oct 2024
Upload the chartered accountant's details properly with his KYC and membership certificate, which arFile: CA Rohan membership self attested.pdf8 Oct 2024
Upload the chartered accountant certificate in the prescribed format form -01 with UDIN.File: CA Certificate signed.pdf8 Oct 2024
authenticated copy of current year RTC For Survey Number 82/2, 83/2 & 84/2File: RTC 82- 2.pdf8 Oct 2024
authenticated copy of current year RTC For Survey Number 82/2, 83/2 & 84/2File: RTC 83 - 2.pdf8 Oct 2024
authenticated copy of current year RTC For Survey Number 82/2, 83/2 & 84/2File: RTC 84 - 2.pdf8 Oct 2024
connected MR in favor of landowner for sno 82/2, 83/2 & 84/2File: MUTATION.pdf8 Oct 2024
defect free EC from 1/4/2009 to till date for all 3 S nos involved in the project as some of the tFile: ECC-27102023-4581098.pdf8 Oct 2024
all uploaded title deeds are of sno 55, so need to upload title deed of the current land owner as peFile: PODI PROCEEDINGS.pdf8 Oct 2024
notarized affidavit regarding all pending or cleared litigations /non-litigation by clearly mentionFile: FORM B.pdf8 Oct 2024
ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR belahalli ranka (1).pdf8 Oct 2024
all uploaded title deeds are of sno 55, so need to upload title deed of the current land owner as peFile: PODI PROCEEDINGS.pdf8 Oct 2024
Architects certificate with valid COA number.File: Reg Cert of Architect_compressed (1).pdf8 Oct 2024
Village map certified by the concern officer with demarcation of proposed landFile: BELLAHALLI VILLAGE MAP.pdf8 Oct 2024
Change of land use details.File: CLU.pdf8 Oct 2024
Updated Amenities and Common area details are incorrect. Please update the same properly as per theFile: Ranka Ankura Amenities.pdf8 Oct 2024
Please upload the Engineer certificate in the prescribed format.File: Ranka Ankura - Certificate by Engineer dt- 20-Sep-2024.pdf8 Oct 2024
Please upload the Yelahanka Airforce Airbase NOC and Jakkur Aerodrome NOCFile: application for airforce noc.pdf8 Oct 2024
Please upload the Land cost calculation sheet as per the guidance value(self-attested copy).File: RPPL - Confirmation of Land cost to RERA.pdf8 Oct 2024
Please upload the brief estimated cost of construction certified by the Engineer.File: Ranka Ankura - Certificate by Engineer dt- 20-Sep-2024.pdf8 Oct 2024
Please mention the project name and project address and upload the section 3(1) notarized affidavit.File: FORM B.pdf8 Oct 2024
Uploaded proforma of Agreement for Sale (AFS)File: Agreement for Sale - Ranka Ankura .pdf8 Oct 2024

How this compares with Bengaluru Urban

24%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep RANKA ANKURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmRANKA ANKURAOther 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: RANKA PROPERTIES PRIVATE LIMITED

RANKA PROPERTIES PRIVATE LIMITED has 1 registration on RERA Karnataka, including RANKA ANKURA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if RANKA ANKURA is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of RANKA ANKURA?

The registered promoter entity is RANKA PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U68100KA2023PTC170992 and GSTIN 29AAMCR4991C1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in RANKA ANKURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at RANKA ANKURA?

The professionals named in the filing: Architect: MEHUL SHAH; Engineer: G H BASAVARAJ; Chartered Accountant: MS ARINAYA & ASSOCIATES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RANKA ANKURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RANKA ANKURA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RANKA ANKURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.