Home / Browse projects / Bengaluru Urban, Karnataka / RAMKY LUMINA

Registration approved No litigation declared Residential/Group Housing project

RAMKY LUMINA

By Royaume Estates Private Limited

RG-KA-53264 · RERA TOR/PRM/KA/RERA/1251/310/PR/250304/000047 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 63 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
Dec 2028Possession promisedmoved 63 months from the original
2 of 17Construction stages donefurthest along: Retaining wall (All types), 95%
416 of 729Units unsoldnot recorded sold or booked
1Complaints at RERA Karnatakaon this registration
Jump to the 84 documents Report an error

RAMKY LUMINA is a Residential/Group Housing project by Royaume Estates Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as TOR/PRM/KA/RERA/1251/310/PR/250304/000047 on 4 Mar 2025. Possession is promised by 31 Dec 2028. The completion date has moved by 63 months from the original filing. 313 of the 729 units on this registration are recorded sold or booked, and 2 of 17 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRAMKY LUMINA
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.TOR/PRM/KA/RERA/1251/310/PR/250304/000047
  • ReraGenie IDRG-KA-53264

Builder

  • NameRoyaume Estates Private Limited
  • Entity typeCompany
  • CINU45400KA2014PTC074588
  • Authorized SignatoryOMAR SHERIFF
  • DirectorsSaleem Sheriff, OMAR SHERIFF
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2025First promiseSep 2023Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Mar 2025
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Sep 2023)
  • Buildings6 building records
  • Documents filed84 files

Current status

43%313 of 729 units booked
7.1%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---1380138
TOWER B---1130113
TOWER C---1180118
TOWER D---1200120
TOWER E---1200120
TOWER F---1200120

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 17 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 95%.

Building: 47% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Retaining wall (All types)95%
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)46%
RCC or MS Framed structure60%
Masonry construction: Bricks, Concrete blocks etc17%
Plastering inside , outside & Ceiling30%
Joinery: Doors, Windows, Ventilators etc17%
Basic work of Water supply, Sanitary and Electrification37%
Dadoing, Skirting, Flooring, Tiles work (All types)32%
Railing and Grill fixing32%
Electrification, Water supply and Sanitary Finishing48%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network65%
Weather Proof work(tile,concrete)65%
Painting35%
Elevation work15%
Internal and External work including landscapes as per santioned drawings0%

Progress on shared amenities41

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes30%
Internal Roads & FootpathsYes0%
Sewage and Drainage SystemYes52%
Parks & Tree plantingYes0%
Street LightingYes0%
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes0%
Solid waste management and disposalYes0%
Water conservationYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes40%
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes25%
Emergency Evacuation servicesYes0%
Storm water drainsYes60%
Use of renewable energyYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes65%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
GasNoNot applicable
Water and SanitationYes0%
Air Conditioning And incerntionYes0%
StaircasesYes57%
LiftsYes35%
Staircases and Lift lobbies, corridor,lobbies, corridorYes40%
Fire escapesYes32%
Common entrance and exit for the building / common portico/foyer/verandahYes40%
BasementYes90%
TerraceYes33%
Outer WallYes30%
Open parking areas and common storage spacesYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area29,339 sq m
Named landowners1
LandownerVillageDistrict
Royaume Estates Private Ltd R--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 505.00 cr
Cost incurredRs 35.65 cr
Spent of the estimate7.06%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 375.00 crRs 29.91 cr
Marketing & BrokerageRs 45.00 crRs 2.70 cr
On-site expenditure-Salaries of workersRs 35.00 crRs 3.04 cr
On-site expenditure-Consultants FeesRs 30.00 cr-
Interest On LoanRs 20.00 cr-

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThomas Associates
EngineerDesignTree Service Consultants Pvt. Ltd

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionSep 2023 → Dec 2028

No reason recorded in the filing

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00066/2026-Royaume Estates Private Limited30/01/2026

Documents filed84

As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number TOR/PRM/KA/RERA/1251/310/PR/250304/000047 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA QU Sep 2026 Ramky Lumina.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 LUMINA SEP 2026.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 LUMINA SEP 2026.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q2 2026-27 Airport Authority of India14 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 June 2026 Ramky Lumina.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate Ramky Lumina QU June 2026.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 June 2026 Ramky Lumina.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA QU Mar 2026 Ramky Lumina.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect QU Mar 2026 Ramky Lumina.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer QU Mar 2026 Ramky Lumina.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q4 2025-26 Fire and Safety14 Apr 2026
Q4 2025-26 Airport Authority of India14 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA Certificate RamkyLumina Dec 2025.pdf13 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate Ramky Lumina Dec 2025.pdf13 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Dec 2025 Ramky Lumina.pdf13 Feb 2026
Q3 2025-26 Water supply and sewage board13 Feb 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)13 Feb 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)13 Feb 2026
Q3 2025-26 KPTCL- BESCOM13 Feb 2026
Q3 2025-26 Fire and Safety13 Feb 2026
Q3 2025-26 Airport Authority of India13 Feb 2026
Q3 2025-26 BSNL/Telecommunication Department13 Feb 2026
CertificateFile: IOC.pdf-
Project Details-
BBMP License-
GFp-
Development Plan-
Draft Sale Deed-
Agreement for sale-
zppd_Title_Deedcompressed-
Section-
Site Plan-
Allotment Letter-
Skylark Royaume BrochureFINAL-
Specs-
EC Sy No 26 1-
Khata-
Royuame Fire NOC-
AAI-
BESCOM-
BWSSB NOC-
KSPCB-
MOEF-
BSNL-
Color_TIFF0252-02-
Balance Sheet 2023 - 2024File: balance sheet 2023-24.pdf-
Balance Sheet 2022 - 2023File: Balance Sheet 2022-23.pdf-
Balance Sheet 2021 - 2022File: Balance sheet 2021-22.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Profit & Loss 2023-24.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss 2022-23.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Profit and Loss 2021-22.pdf-
Cash Flow Statement 2023 - 2024File: Cashfolw 2023-24.pdf-
Cash Flow Statement 2022 - 2023File: Cashflow 2022-23.pdf-
Auditor's Report 2023 - 2024File: Audit report- 2023-24.pdf-
Auditor's Report 2022 - 2023File: Audit report 2022-23.pdf-
Auditor's Report 2021 - 2022File: Audit Report 2021-22.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR 2023-24.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR 2022 23.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2021-22.pdf-
Form B (4)-
Supplemenatry Agreement draft-
Appeal 1 Order CopyFile: 8856.pdf-

How this compares with Bengaluru Urban

43%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one moved by 63 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep RAMKY LUMINA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmRAMKY LUMINAOther 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: Royaume Estates Private Limited

Royaume Estates Private Limited has 2 registrations on RERA Karnataka, including Skylark Royaume and RAMKY LUMINA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if RAMKY LUMINA is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of RAMKY LUMINA?

The registered promoter entity is Royaume Estates Private Limited, a company as per the filing. Its CIN U45400KA2014PTC074588 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in RAMKY LUMINA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RAMKY LUMINA?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at RAMKY LUMINA?

The professionals named in the filing: Architect: Thomas Associates; Engineer: DesignTree Service Consultants Pvt. Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAMKY LUMINA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAMKY LUMINA. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAMKY LUMINA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.