Registration approved Residential/Group Housing project

Rajsri

By Vishnu Sri Builders & Developers

RG-KA-87663 · RERA PRM/KA/RERA/1251/310/PR/171223/001745 · Last updated on RERA Karnataka portal: 21 Feb 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 33 months
  • 3 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2024Possession promisedmoved 33 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 84 documents Report an error

Rajsri is a Residential/Group Housing project by Vishnu Sri Builders & Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171223/001745 on 23 Dec 2017. Possession is promised by 30 Sep 2024. The completion date has moved by 33 months from the original filing.

At a glance

Project

  • NameRajsri
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171223/001745
  • ReraGenie IDRG-KA-87663

Builder

  • NameVishnu Sri Builders & Developers

Key dates

this monthRegisteredDec 2017First promiseDec 2021Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Dec 2017
  • Promised completion30 Sep 2024
  • Revised completionRevised to 30 Sep 2024 (originally 31 Dec 2021)
  • Buildings1 building record
  • Documents filed84 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C & D-----144

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

As on 21 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,297 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 55.05 cr

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → not stated

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/221116/001745not stated → Sep 2023

Reason as filed by the promoterothers

ExtensionSep 2023 → Sep 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed84

As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171223/001745 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 4 CAFile: Form -4 Chartered Accountant.pdf21 Feb 2022
Engineer detailsFile: Engineer Details.pdf21 Feb 2022
Final NOCFile: Final NOC.pdf21 Feb 2022
EstimationFile: Estimation.pdf21 Feb 2022
AffidavitFile: NOC Affidavit.pdf21 Feb 2022
Project specificationFile: PROJECT SPECIFICATION.pdf21 Feb 2022
StabilityFile: Stability.pdf21 Feb 2022
AffidavitFile: Affidavit.pdf25 Jan 2022
Associate Vendor detailsFile: Associate Vendor details.pdf25 Jan 2022
Break up development detailsFile: Break up development details.pdf25 Jan 2022
Consent LetterFile: Consent Letter.pdf25 Jan 2022
flow chart stp sbrFile: flow chart stp sbr.pdf25 Jan 2022
Form 4 Chartered AccountantFile: Form 4 Chartered Accountant.pdf25 Jan 2022
FORM 5 ARCHITECT CertificateFile: FORM 5 ARCHITECT Certificate.pdf25 Jan 2022
FORM 6 ENGINEER CertificateFile: FORM 6 ENGINEER Certificate.pdf25 Jan 2022
Modified plan sold and Unsold detailsFile: Modified plan sold and Unsold details.pdf25 Jan 2022
Registered plan sold and Unsold detailsFile: Registered plan sold and Unsold details.pdf25 Jan 2022
Sold and Unsold abstract as per modified planFile: Sold and Unsold abstract as per modified plan.pdf25 Jan 2022
Project Details-
Modified plan details site plan, floor plans, Plan Licence LetterFile: BBMP Building Licence.pdf-
Consent LetterFile: Consent Letter.pdf-
Chartered Accountant CertificateFile: Form -4, Chartered Accountant.pdf-
Notarized AffidavitFile: Affidavit.pdf-
Engineer CertificateFile: FORM6,ENGINEER MODIFICATION PLAN BLOCK C AND D.pdf-
Architect CertificateFile: FORM 5, ARCHITECT MODIFICATION PLAN BLOCK C AND D.pdf-
Structural Engineer Certificate for stability of structureFile: FORM6,ENGINEER MODIFICATION PLAN BLOCK C AND D.pdf-
Modification of Plan DetailsFile: VS Rajsri Typical 1 to 10 Floors.pdf-
Modification of Plan DetailsFile: BLOCK C & D 2021 Modified Plan.pdf-
Modification of Plan DetailsFile: Commencement Certificate.pdf-
Modification of Plan DetailsFile: Commencement Certificate.pdf-
Document 1File: air port.pdf-
Document 2File: BESCOM.pdf-
Document 3File: BSNL.pdf-
Document 4File: FIRE.pdf-
Document 5File: KSPCB.pdf-
Document 6File: SEIAA.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Form Ex1 Architect Certificate for Status of Work As on Date.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form 5 Engineers Certificate for Status of Work As on Date.pdf-
CA Certificate for Funds UtilizationFile: Form Ex3 CA Fund Utilisation Certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form Ex2 Architect Certificate For Pending Work As on Date.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form 6 Engineers Certificate for Pending Work as On Date.pdf-
CA Certificate for Funds required for Project CompletionFile: Form EX 4 CA Certificate for Funds Required.pdf-
AffidavitFile: Form Ex7 Affidavit for Seeking Extension.pdf-
Latest Encumbrance CertificateFile: EC Apr 2021 to July 2022.pdf-
Commencement Certificate-
Master Plan-
Vishnu Sri Sale deed-
Sale & Construction Agreement-
VS Rajsri Site Plan-
VS Rajsri Ground Floor Plan-
Rajsri Land Title deed-
VS Rajsri Basement 2-
VS Rajsri Typical 1 to 10 Floors-
Allotment Letter-
Master Plan-
BESCOM-
PROJECT SPECIFICATION-
EC 1-4-1990 to 3-May-2016-
Katha,katha certificate & extract-
Conversion Copy-
BESCOM-
Airport-
BESCOM-
BWSSB-
KSPCB-
SEIAA-
BSNL-
Unnamed document-
VS Rajsri Site Plan-
VS Rajsri Site Plan-
VS Rajsri Elevation-
Balance Sheet 2015 - 2016File: Balance Sheet 16.pdf-
Balance Sheet 2014 - 2015File: Balanc Sheet 15-16.pdf-
Balance Sheet 2013 - 2014File: 2014-2015.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L 16-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P & L Account 15-16.pdf-
Audited Profit and Loss Statement 2013 - 2014File: 2014-2015.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: VISHNUSRI BUILDERS AND DEVELOPERS ITR 2016-2017.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 15-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: 2014-2015.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 33 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Rajsri on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Vishnu Sri Builders & Developers

Vishnu Sri Builders & Developers has 1 registration on RERA Karnataka, including Rajsri. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Rajsri is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Rajsri?

The registered promoter entity is Vishnu Sri Builders & Developers. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Rajsri?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in Rajsri?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rajsri. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rajsri to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.