ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Rajshree Aashiyana

Completed No litigation declared Residential / Group Housing project

Rajshree Aashiyana

By Ganesh Chhaya Construction LLP

RG-MH-80789 · RERA P51800046829 · Last updated on MahaRERA portal: 5 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Rajshree Aashiyana is a Residential / Group Housing project by Ganesh Chhaya Construction LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046829 on 10 Sep 2022. The registration is recorded completed; possession was promised by 30 Jun 2025.

At a glance

Project

  • NameRajshree Aashiyana
  • TypeResidential / Group Housing
  • Location
    • R B Mehta Road
    • Ghatkopar East
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046829
  • ReraGenie IDRG-MH-80789

Builder

  • NameGanesh Chhaya Construction LLP
  • Entity typePartnership
  • PartnersJetalaal L Dedhia, Anil J Chheda

Key dates

this monthRegisteredSep 2022PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Sep 2022
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Rajshree AashiyanaNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Rajshree Aashiyana: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered43

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area650 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Ganesh Chhaya Co op Hsg Soc LtdKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2107.62
Proposed, not sanctioned1,451 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNew CTS no 637 A, Shivalaya Chandavarkar Road, Borivali

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK R Architects
EngineerSura & Associate
Chartered AccountantDeepak Kumar A Joshi
PartnerRole in project
Ganesh Chhaya Construction LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Mar 2025

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf5 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold list.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_Q3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT GANESH CHHAYA DEC 2024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Ganesh Chhaya (1).pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf9 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Ganesh Chhaya (1).pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf9 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form I.pdf5 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf7 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - GC.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - GC.pdf7 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_.pdf12 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_.pdf10 Jul 2023
Building plan approvalFile: Approved Amended Certificate 17042023.pdf27 May 2023
Building plan approvalFile: Plan 17042023.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved Amended Certificate 17042023.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 17042023.pdf27 May 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC.pdf27 May 2023
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC.pdf27 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GANESG CHHAYA-_compressed.pdf9 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE GANESH CHAYA_compressed.pdf7 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real easte organisations.pdf6 Jan 2023
Details of encumbrances concerned to FinanceFile: Emcumbrance Certificate.PDF17 Nov 2022
Details of encumbrances concerned to LegalFile: Emcumbrance Certificate.PDF17 Nov 2022
Proforma of Allotment letterFile: Final Agreement for Sale.pdf26 Aug 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement for sale.pdf26 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Ganesh Chhaya-Format _A_.pdf17 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation report for AL.pdf9 Aug 2022
PAN CardFile: Ganesh Chhaya Pan Card.pdf6 Aug 2022
Details of encumbrances concerned to FinanceFile: Encumbrace Certificate for Finance.pdf6 Aug 2022
CERSAI detailsFile: Cersai Report.pdf6 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf5 Aug 2022
Proforma of Allotment letterFile: Allotment Letter.pdf27 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: GC RERA ESTIMITATED COST CERTIFICATE FOR RERA REG_compressed.pdf26 Jul 2022
Copy of the legal title reportFile: Legal Title Report along with Annexure - Ganesh Chaya CHS dt 16 07 2022.pdf23 Jul 2022
Details of encumbrances concerned to LegalFile: Encumbrance Certificate for Legal.pdf13 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencment Certificate.pdf13 Jul 2022
Declaration about Commencement CertificateFile: Decleration about CC.pdf13 Jul 2022
Declaration in FORM BFile: Form B_.pdf4 Jul 2022
Building plan approvalFile: Amended Plan Approved letter.pdf20 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended Plan Approved letter.pdf20 Jun 2022
Building plan approvalFile: IOD.pdf14 Jun 2022
Layout approvalFile: Layout.pdf14 Jun 2022
Building plan approvalFile: IOD plan 2.pdf14 Jun 2022
Building plan approvalFile: IOD plan 3.pdf14 Jun 2022
Copy of Layout Approval (in case of layout)File: Layout.pdf14 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf14 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD plan 2.pdf14 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD plan 3.pdf14 Jun 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf14 Jun 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rajshree Aashiyana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar East6,700+ in Mumbai Suburban

2 kmRajshree AashiyanaCompleted 130Lapsed / revoked 102Other 134Dot size: filed unitsN

Filed coordinates, straight-line distance. 366 registered projects within 2 km.

Builder: Ganesh Chhaya Construction LLP

Ganesh Chhaya Construction LLP has 1 registration on MahaRERA, including Rajshree Aashiyana. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Rajshree Aashiyana is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rajshree Aashiyana?

The registered promoter entity is Ganesh Chhaya Construction LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rajshree Aashiyana?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rajshree Aashiyana?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rajshree Aashiyana?

The professionals named in the filing: Architect: K R Architects; Engineer: Sura & Associate; Chartered Accountant: Deepak Kumar A Joshi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rajshree Aashiyana?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rajshree Aashiyana. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rajshree Aashiyana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.