Home / Browse projects / Pune, Maharashtra / R CITY
R CITY
By REVA CONSTRUCTION AND DEVELOPERS
RG-MH-16898 · RERA P52100027362 · Last updated on MahaRERA portal: 5 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
R CITY is a Others project by REVA CONSTRUCTION AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100027362 on 6 Dec 2020. Possession is promised by 31 Mar 2028. The completion date has moved by 24 months from the original filing. 98 of the 177 units on this registration are recorded sold or booked, and 0 of 77 construction stages are filed complete.
At a glance
Project
- NameR CITY
- TypeOthers
- Location
- GOPALWADI
- DAUND
- Daund (M Cl)
- Pune
- 413801
- Pincode413801
- RERA no.P52100027362
- ReraGenie IDRG-MH-16898
Builder
- NameREVA CONSTRUCTION AND DEVELOPERS
- Entity typePartnership
- GSTIN27AAYFR2402F1Z3
- PartnersYOGESH GORAKH RANDHAVE, BHAUSAHEB BAPU RANDHAVE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on6 Dec 2020
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 30 Mar 2026)
- Buildings7 building records
- Documents filed76 files
Current status
Figures as on 5 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| R CITY Lowerground | NA | 5 | 5 | 56 | 121 | 177 |
| R CITY Groundfloor | NA | 5 | 0 | 0 | 0 | 0 |
| R CITY Frist Floor | NA | 5 | 0 | 0 | 0 | 0 |
| R CITY Secound floor | NA | 5 | 0 | 0 | 0 | 0 |
| R CITY Third Floor | NA | 5 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
| 0 | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building7
As on 5 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 0%.
R CITY Lowerground0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R CITY Groundfloor0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R CITY Frist Floor0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R CITY Secound floor0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
R CITY Third Floor0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
00%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership11
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| POPAT BAPU RANDHAVE | Gopalwadi | Pune |
| BHAUSO BAPU RANDHAVE | Gopalwadi | Pune |
| HARIBHAU BAPU RANDHAVE | Gopalwadi | Pune |
| GORAKH BANDU RANDHAVE | Daund (M Cl) | Pune |
| MADHUKAR BANDU RANDHAVE | Gopalwadi | Pune |
| RAMDAS BANDU RANDHAVE | Gopalwadi | Pune |
| TATYA BANDU RANDHAVE | Gopalwadi | Pune |
| SAMPAT BANDU RANDHAVE | Gopalwadi | Pune |
| LAKHAN SURESH RANDHAVE | Gopalwadi | Pune |
| SHANKAR BANDU RANDHAVE | Gopalwadi | Pune |
| REVA CONSTRUCTION AND DEVLOPERS | Gopalwadi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| R CITY Lowerground | NA | Rs 24.83 cr | Rs 19.50 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHENDRA M BHAONGLE |
| Engineer | MAHENDRA M BHAONGLE |
| Chartered Accountant | CA NAGNATH S JADHAV |
| Chartered Accountant | Vikas Vyas |
| Partner | Role in project |
|---|---|
| REVA CONSTRUCTION AND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe hereby request an extension of the project timeline under RERA due to unforeseen delays caused by a shortage of both skilled labour and essential construction materials. Over the past few months, our project has faced significant disruptions in workforce availability, which has slowed down on-site progress. Additionally, the supply chain for critical raw materials such as cement and steel has been inconsistent, leading to delays in procurement and execution of key construction activities. These challenges are beyond our control and have impacted our ability to meet the originally committed
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Nov 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Nov 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed76
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 Architect Certificate _31-12-2025.pdf | 5 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Engineer certificate 31-12-2025.pdf | 5 May 2026 |
| Withdrawal Update Form 3File: FORM - 3 31-12-2025.pdf | 5 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Architect Certificate _31-12-2025.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 Engineer certificate 31-12-2025.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: FORM - 3 31-12-2025.pdf | 29 Apr 2026 |
| Form 1File: FORM 1 Architect Certificate _31-03-2025.pdf | 30 Mar 2026 |
| Form 2File: FORM 2 Engineer certificate 31-03-2025.pdf | 30 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - 31-03-2025.pdf | 30 Mar 2026 |
| Form 3File: FORM -3 31-03-2025.pdf | 30 Mar 2026 |
| Form 2File: FORM 2 Engineer certificate 30-06-2025.pdf | 30 Mar 2026 |
| Form 1File: FORM 1 Architect Certificate _30-06-2025.pdf | 30 Mar 2026 |
| Form 3File: FORM - 3 30-06-2025.pdf | 30 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - 30-06-2025.pdf | 30 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory - 30-9-2025.pdf | 30 Mar 2026 |
| Form 1File: FORM 1 Architect Certificate _30-09-2025.pdf | 30 Mar 2026 |
| Form 2File: FORM 2 Engineer certificate 30-09-2025.pdf | 30 Mar 2026 |
| Form 3File: FORM - 3 30-09-2025.pdf | 30 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - FY 2024-25.pdf | 30 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - FY 2024-25.pdf | 30 Mar 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPLOAD.pdf | 9 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEEAR CERTIFICATE.pdf | 9 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 2021-2022.pdf | 9 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2022-2023.pdf | 9 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-2024.pdf | 9 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FROM 5.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31 Mar 2023.pdf | 15 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf | 15 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 2020-21.PDF | 19 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.PDF | 19 Jul 2023 |
| Declaration about Commencement CertificateFile: JUNE 21.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARCH 21.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE 21.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEP 21.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC 22.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MARCH 22.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: JUNE 22.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEP 22.pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEC 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MARCH 21.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 21.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 21.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 21.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MARCH 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 21.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 21.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MARCH 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: JUNE 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SEP 22.pdf | 11 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEC 22.pdf | 11 Jul 2023 |
| Proforma of Agreement for saleFile: New draft of R city.pdf | 11 Jul 2023 |
| OtherFile: deed.pdf | 4 Dec 2020 |
| Building plan approvalFile: lower ground floor.pdf | 27 Nov 2020 |
| Building plan approvalFile: ground floor.pdf | 27 Nov 2020 |
| Building plan approvalFile: Frist Floor.pdf | 27 Nov 2020 |
| Building plan approvalFile: Second Floor.pdf | 27 Nov 2020 |
| Building plan approvalFile: third floor.pdf | 27 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: lower ground floor.pdf | 27 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: ground floor.pdf | 27 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Frist Floor.pdf | 27 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Second Floor.pdf | 27 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: third floor.pdf | 27 Nov 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 27 Nov 2020 |
| Proforma of Allotment letterFile: PROFARMA LETTERR.pdf | 27 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: COMEENCMENT CERTIFICATE.pdf | 26 Nov 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFATE.pdf | 26 Nov 2020 |
| OtherFile: leteer of authority.pdf | 26 Nov 2020 |
| Details of encumbrancesFile: encumberance certificate.pdf | 24 Nov 2020 |
| Declaration in FORM BFile: form b_compressed (1).pdf | 24 Nov 2020 |
| Layout approvalFile: NA ORDER RESIZE.pdf | 21 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: NA ORDER RESIZE.pdf | 21 Nov 2020 |
| PAN CardFile: Firm Pan Card.pdf | 19 Nov 2020 |
| Copy of the legal title reportFile: SEARCH REPORT RESIZE.pdf | 19 Nov 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 19 Nov 2020 |
| Proforma of Allotment letterFile: agreement of sale.pdf | 19 Nov 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 76 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep R CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DAUND13,700+ in Pune
GRACE PLAZA
Neelawati Developers and Promoters
SHRI ASHTAVINAYAK PARK
AJAY BUILDERS AND ASSOCIATES DAUND
PRIDE09
PRIDE09
SHRI VENKATESH PARK
AJAY BUILDERS DAUND
FUTURE CITY
ARIHANT REALITY
MISSION HUMAN PARK
SBN DEVELOPERS
Builder: REVA CONSTRUCTION AND DEVELOPERS
REVA CONSTRUCTION AND DEVELOPERS has 1 registration on MahaRERA, including R CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if R CITY is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of R CITY?
The registered promoter entity is REVA CONSTRUCTION AND DEVELOPERS, a partnership as per the filing. Its GSTIN 27AAYFR2402F1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in R CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for R CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at R CITY?
The professionals named in the filing: Architect: MAHENDRA M BHAONGLE; Engineer: MAHENDRA M BHAONGLE; Chartered Accountant: CA NAGNATH S JADHAV; Chartered Accountant: Vikas Vyas. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in R CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback