ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Queens Gate Block 4

Registration approved Mixed Development project

Queens Gate Block 4

By Suadela Constructions Private limited

RG-KA-35781 · RERA PRM/KA/RERA/1251/310/PR/171016/000971

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Aug 2022Possession promisedmoved 9 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 68 documents Report an error

Queens Gate Block 4 is a Mixed Development project by Suadela Constructions Private limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171016/000971 on 16 Oct 2017. Possession is promised by 30 Aug 2022. The completion date has moved by 9 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameQueens Gate Block 4
  • TypeMixed Development
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/171016/000971
  • ReraGenie IDRG-KA-35781

Builder

  • NameSuadela Constructions Private limited
  • Entity typeCompany
  • CINU45200MH2007PTC172213
  • Authorized SignatorySandeep Shete
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2017First promiseNov 2021Revised toAug 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Oct 2017
  • Promised completion30 Aug 2022
  • Revised completionRevised to 30 Aug 2022 (originally 30 Nov 2021)
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Queens Gate Block 4-----432

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,507 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 207.62 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Hafeez Contractor
EngineerMahimtura ConsultantsPvt. Ltd

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionNov 2021 → Aug 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
01458/2025-Suadela Constructions Private limited08/12/2025

Documents filed68

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171016/000971 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: SCPL - Certificate of Incorporation.pdf-
CC - QG-
APPROVED BUILDING PLAN - QG-
APPROVED LAYOUT - QG-
PROFORMA SALE DEED-
PROFORMA AGREEMENT - SALE-
Sale Deed and RTC-
APPROVED SECTION - QG-
APPROVED LAYOUT - QG-
Application Form-
BROCHURE - QG-
Fire NOC-
QUEENSGATE SPECIFICATION-
EC-
Khata-
Conversion, Search Report and Mutation-
Conversion order letter-
Relinquishment deed-
FIRE NOC-
NOC FROM AAI-
NOC FROM BESCOM-
NOC FROM BWSSB-
NOC FROM PCB-
SEIAA MoEF-
NOC FROM BSNL-
Not Appplicable-
Unnamed document-
Not Appplicable-
Not Appplicable-
Not Appplicable-
Not Appplicable-
Structural Stability-QG-
Already Provided Above-
Balance Sheet 2015 - 2016File: SCPL 2016.pdf-
Balance Sheet 2014 - 2015File: SCPL 2015.pdf-
Balance Sheet 2013 - 2014File: SCPL 2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Details Provided in Balance sheet.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Details Provided in Balance sheet.pdf-
Audited Profit and Loss Statement 2013 - 2014File: Details Provided in Balance sheet.pdf-
Director's Report 2015 - 2016File: SCPL - Mar 16 DR.pdf-
Director's Report 2014 - 2015File: SCPL - Mar 15 DR.pdf-
Director's Report 2013 - 2014File: SCPL - Mar 14 DR.pdf-
Cash Flow Statement 2015 - 2016File: Details Provided in Balance sheet.pdf-
Cash Flow Statement 2014 - 2015File: Details Provided in Balance sheet.pdf-
Auditor's Report 2015 - 2016File: Details Provided in Balance sheet.pdf-
Auditor's Report 2014 - 2015File: Details Provided in Balance sheet.pdf-
Auditor's Report 2013 - 2014File: Details Provided in Balance sheet.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR AY 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR AY 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: ITR AY 2014-15.pdf-
Form B-Queensgate-
Prospectus/BrochureFile: Bannerghatta Brochure.pdf-
Advertisement Copy 1File: EDM Queensgate.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171016_000971.xlsx-
Stability CertificateFile: Strutural Stability Certificate - QG.pdf-
NOC issued by the Fire Force department after completion of workFile: QG FIRE NOC.pdf-
Occupancy CertificateFile: SCPL OC - QG.pdf-
Consent for operation issued by KSPCBFile: Consent KSPCB.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: 11104 Queensgate Vertical Transportation System Assessment Lifts AL3 210211.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: ESCOM Letter1.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB WATER SUPLLY PERMANENT CONNECTION.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Completed.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: Completed.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Certificate - Queensgate - Final.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form -4, Chartered Accountant (QU) - Final - Queensgate (1).pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: QG - Affidavit.pdf-
ESCOM LetterFile: ESCOM letter2.pdf-
Lift operationFile: 11104 Queensgate Vertical Transportation System Assessment Lifts BL3 210211.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Queens Gate Block 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmQueens Gate Block 4Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 30 registered projects within 2 km.

Builder: Suadela Constructions Private limited

Suadela Constructions Private limited has 2 registrations on RERA Karnataka, including Queens Gate Block 4 and Torino. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Queens Gate Block 4 is delayed beyond 30 Aug 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Queens Gate Block 4?

The registered promoter entity is Suadela Constructions Private limited, a company as per the filing. Its CIN U45200MH2007PTC172213 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Queens Gate Block 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Queens Gate Block 4?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Queens Gate Block 4?

The professionals named in the filing: Architect: Architect Hafeez Contractor; Engineer: Mahimtura ConsultantsPvt. Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Queens Gate Block 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Queens Gate Block 4. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Queens Gate Block 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.