Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Dec 2024Possession promisedmoved 21 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 61 documents Report an error

Purva Zenium 1 is a Residential/Group Housing project by Puravankara Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/190129/002311 on 29 Jan 2019. Possession is promised by 30 Dec 2024. The completion date has moved by 21 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePurva Zenium 1
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/190129/002311
  • ReraGenie IDRG-KA-38333

Builder

  • NamePuravankara Limited
  • Entity typeCompany
  • CINL45200KA1986PLC051571
  • Authorized SignatoryNani R Choksey
  • Other registrations26 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2019First promiseMar 2023Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Jan 2019
  • Promised completion30 Dec 2024
  • Revised completionRevised to 30 Dec 2024 (originally 31 Mar 2023)
  • Buildings8 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 7---55055
Tower 8---55055
Tower 9---55055
Tower 10---55055
Tower 11---55055
Tower 12---55055
Tower 13---55055
Tower 14---51051

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing workNot applicable
Retaining wall (All types)Not applicable
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationYes-
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupNoNot applicable
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,125 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 335.72 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2023 → Dec 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1251/309/PR/231228/002311Dec 2023 → Dec 2024

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
00346/2025-Puravankara Limited28/02/2025

Documents filed61

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/190129/002311 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: COI.PDF-
Architect Certificate for Work Completion Schedule till DateFile: Form Ex 1 Architect Status_compressed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form Ex 5 Status Engineer_compressed.pdf-
CA Certificate for Funds UtilizationFile: Form-Ex3 Zenium Phase-1_sd.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form Ex 2 Architect Pending_compressed.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form Ex 6 Pending Engineer_compressed.pdf-
CA Certificate for Funds required for Project CompletionFile: Form-Ex4 Zenium Phase-1 Funds Required.pdf-
AffidavitFile: Form Ex 7 Affidavit_compressed.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (6).xlsx-
Document 1File: Airpot NOC Dated21-8-17.pdf-
Document 2File: Environmental Clearance.pdf-
Document 3File: Revised Fire NOC_compressed (1).pdf-
Document 4File: CC.pdf-
Document 5File: Form B Affidavit.pdf-
RERA_CC_BIAAPA-
Scan_1172-35-
Plans (Site_Floor_Phase)-
Allotment Letter (Zenium_1)-
Allotment Letter (Zenium_1)-
RERA_DoS_RTC-
Section 1_2-
Scan_1172-35-
Allotment Letter (Zenium_1)-
(Brochure) - RERA Declaration-
Zenium _ Specifications-
ECs-
201812070640-2-
RERA_Khata-
RERA_JDA-
Residential Conversion-
Airpot NOC Dated21-8-17-
BESCOM NOC-
KSPCB CFE Acknowldgement-
SEIAA (22032018)-
BSNL NOC-
Plans Section_Elevation-
Scan_1172-35-
Scan_1172-39-
RERA_CC_BIAAPA-
Balance Sheet 2017 - 2018File: 2018 Bal Sheet.pdf-
Balance Sheet 2016 - 2017File: 2017 Bal Sheet.pdf-
Balance Sheet 2015 - 2016File: 2016 Bal Sheet.pdf-
Audited Profit and Loss Statement 2017 - 2018File: 2018 PandL.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 2017 PandL.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2016 PandL.pdf-
Director's Report 2017 - 2018File: 2018 Directors Report.pdf-
Director's Report 2016 - 2017File: 2917 Directors Report.pdf-
Director's Report 2015 - 2016File: 2016 Directors Report.pdf-
Cash Flow Statement 2017 - 2018File: 2018 Cash Flow.pdf-
Cash Flow Statement 2016 - 2017File: 2017 Cash Flow.pdf-
Auditor's Report 2017 - 2018File: 2018 Auditor Report.pdf-
Auditor's Report 2016 - 2017File: 2017 Auditor Report.pdf-
Auditor's Report 2015 - 2016File: 2016 Auditor Report.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: 2018 ITR.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: 2017 ITR.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 2016 ITR.pdf-
201812070640-2-
Prospectus/BrochureFile: Purva Zenium Brochure.pdf-
Advertisement Copy 1File: Purva Zenium Bangalore EDM.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_190129_002311.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Purva Zenium 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmPurva Zenium 1Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Puravankara Limited

Puravankara Limited has 27 registrations on RERA Karnataka, including Provident Deansgate and Provident Deansgate Phase 2. Its filings declare 5 earlier projects, 5 of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Purva Zenium 1 is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Purva Zenium 1?

The registered promoter entity is Puravankara Limited, a company as per the filing. Its CIN L45200KA1986PLC051571 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Purva Zenium 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Purva Zenium 1?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Purva Zenium 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Purva Zenium 1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Purva Zenium 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.