Home / Browse projects / Bengaluru Urban, Karnataka / Purva Blubelle
Purva Blubelle
RG-KA-99726 · RERA PRM/KA/RERA/1251/310/PR/290323/005829 · Last updated on RERA Karnataka portal: 12 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Purva Blubelle is a Residential/Group Housing project by Puravankara Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/290323/005829 on 29 Mar 2023. Possession is promised by 30 Jun 2029. 369 of the 378 units on this registration are recorded sold or booked, and 7 of 18 construction stages are filed complete.
At a glance
Project
- NamePurva Blubelle
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560023
- Pincode560023
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/290323/005829
- ReraGenie IDRG-KA-99726
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on29 Mar 2023
- Promised completion30 Jun 2029
- Revised completionNone
- Buildings2 building records
- Documents filed77 files
Current status
Figures as on 12 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower A | - | - | - | 186 | 0 | 186 |
| Tower B | - | - | - | 192 | 0 | 192 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 12 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 18 construction stages are filed complete. The stage furthest along is Joinery: Doors, at 59%.
Building: 50% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 32% |
| Joinery: Doors, Windows, Ventilators etc | 59% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 59% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 32% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 5% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 5% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 12 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 20% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 5% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 12% |
| Lifts | Yes | 12% |
| Corridor/Lobbies | Yes | 12% |
| Fire escapes | Yes | 12% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 12% |
| Basement | Yes | 12% |
| Terrace | Yes | 12% |
| Outer Wall | Yes | 12% |
| Open parking areas | Yes | 12% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | No | Not applicable |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Shantilal J Patel | - | - |
| Sandeep Chandrakant Patel | - | - |
| Rina Jiten Patel | - | - |
| Sarla Chandrakant Patel | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 195.39 cr | Rs 119.15 cr |
| Principal sum and interest payable to financial institutions-Money Lenders on construction funding or money borrowed for construction | Rs 28.50 cr | Rs 15.29 cr |
| On-site expenditure-Site Overhead | Rs 25.22 cr | Rs 25.15 cr |
| On-site expenditure-Consultants Fees | Rs 2.48 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Anup Naik |
| Engineer | Mahesh Veerupakshagoud patil |
| Chartered Accountant | Venkatesh Kamath S V |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed77
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/290323/005829 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Purva Blubelle RERA Sep26 -Updated Final.pdf | 12 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 (RERA) - Architect Certificate- Purva Blubelle- 30 SEP 2026.pdf | 12 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 5 (RERA) - Architect Certificate- Purva Blubelle- 30 SEP 2026.pdf | 12 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Purva Blubelle RERA Form 4 Jun26.pdf | 9 Oct 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Blubelle Architect Certificate Jun26.pdf | 9 Oct 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Blubelle Engineering Certificate Jun26.pdf | 9 Oct 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Blubelle RERA Form 4 Mar26.pdf | 8 Oct 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Blubelle Architect Certificate Mar26.pdf | 8 Oct 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: QU Form-6 Engineer Certificate Bluebelle Q 4 FY 25-26.pdf | 8 Oct 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Purva Blubelle RERA Form4 Dec 25.pdf | 25 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Purva Blubelle Architect Certificate-Dec25.PDF | 25 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Blubelle Engineer Certificate Dec25.pdf | 25 Mar 2026 |
| Architect CertificateFile: Form-2 Architect Certificate Blubelle.pdf | 24 Mar 2023 |
| Registration CertificateFile: CoI PL.PDF | - |
| Organization StructureFile: Top level org chart.pdf | - |
| Certificate issued by CA Form 1File: Purva Blubelle-Form E1-CA=140323.pdf | - |
| Certificate issued by Architect Form 2File: Form-2 Architect Certificate Blubelle.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer Certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: No Dispute Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Purva Blubelle-Form E1-CA=140323.pdf | - |
| Balance Sheet 2021 - 2022File: 22 Balance Sheet.pdf | - |
| Balance Sheet 2020 - 2021File: 21 Balance Sheet.pdf | - |
| Balance Sheet 2019 - 2020File: 20 Balance Sheet.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: 22 Statment of P& L Account.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: 21 Statement of P & L.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: 20 Statement of P & L Account.pdf | - |
| Director's Report 2021 - 2022File: Director's report 22.pdf | - |
| Director's Report 2020 - 2021File: Director's report 21.pdf | - |
| Director's Report 2019 - 2020File: Director's report 20.pdf | - |
| Cash Flow Statement 2021 - 2022File: 22 Cash Flow.pdf | - |
| Cash Flow Statement 2020 - 2021File: 21 Cash Flow Statment.pdf | - |
| Auditor's Report 2021 - 2022File: 22 Independent Auditors Report_compressed (1).pdf | - |
| Auditor's Report 2020 - 2021File: 21 Independent Auditors Report.pdf | - |
| Auditor's Report 2019 - 2020File: 20 Independent Audiors Report 31-Mar-20.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: AY 22 ITR.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: AY 21 ITR.pdf | - |
| Income Tax Return Acknowledgement 2019 - 2020File: AY 20 ITR.pdf | - |
| BUILDING LICENCE | - |
| Site Plan Approved | - |
| BUILDING LICENCE | - |
| Site Plan Approved | - |
| Section Plans | - |
| Section Plans | - |
| PROJECT BLUBELLE-MAGADI ROAD-SIGNED OFF SPECIFICATION-R0_compressed | - |
| Section Plans | - |
| Site Plan Approved | - |
| BASE | - |
| Advocate search report | - |
| JDA 7274-21-22 | - |
| PT sheet | - |
| AGREEMENT TO SELL Purva Blubelle | - |
| ALLOTMENT LETTER | - |
| Brochure Undertaking | - |
| Form B blubelle PDF_compressed | - |
| 3 Affidavit | - |
| JD Affidavit_compressed (1) | - |
| BESCOM NOC compressed | - |
| BWSSB NOC | - |
| Fire NOC BW (2) | - |
| AAI compressed | - |
| KSPCB CFE | - |
| Environment Clearance compressed | - |
| BSNL NOC | - |
| HAL NOC | - |
| CDP Magadi | - |
| City Survey Sketch_compressed | - |
| Grant Certificate | - |
| PT sheet | - |
| Field Book | - |
| PR Card | - |
| GuideLine Value | - |
| Upper Floor plans | - |
| 1 basement floor plan | - |
| 2 Basement floor plan | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Purva Sunflower | Magadi Road | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Purva Blubelle on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
Parkwest - Cedar - Tower 8
Relationship Properties Private Limited
Parkwest - Sequoia - Tower 11
Relationship Properties Private Limited
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
See every Bengaluru Urban project, with the district possession charts
Builder: Puravankara Limited
Puravankara Limited has 27 registrations on RERA Karnataka, including Provident Deansgate and Provident Deansgate Phase 2. Its filings declare 5 earlier projects, 5 of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Purva Blubelle is delayed beyond 30 Jun 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Purva Blubelle?
The registered promoter entity is Puravankara Limited, a company as per the filing. Its GSTIN 29AAACP2550R1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Purva Blubelle?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Purva Blubelle?
The professionals named in the filing: Architect: Anup Naik; Engineer: Mahesh Veerupakshagoud patil; Chartered Accountant: Venkatesh Kamath S V. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Purva Blubelle?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback