Registration approved No litigation declared Residential/Group Housing project

Parkwest - Cedar - Tower 8

By Relationship Properties Private Limited

RG-KA-80707 · RERA PRM/KA/RERA/1251/310/PR/180122/004645 · Last updated on RERA Karnataka portal: 13 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • 3 complaints at RERA Karnataka

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
Dec 2026Possession promisedno revision filed
6 of 18Construction stages donefurthest along: Sub-structure flooring (Parking Floor, 98%
0 of 225Units unsoldnot recorded sold or booked
3Complaints at RERA Karnatakaon this registration
Jump to the 138 documents Report an error

Parkwest - Cedar - Tower 8 is a Residential/Group Housing project by Relationship Properties Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180122/004645 on 18 Jan 2022. Possession is promised by 31 Dec 2026. 225 of the 225 units on this registration are recorded sold or booked, and 6 of 18 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameParkwest - Cedar - Tower 8
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560023
  • Pincode560023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/180122/004645
  • ReraGenie IDRG-KA-80707

Builder

  • NameRelationship Properties Private Limited
  • Entity typeCompany
  • CINU45200MH2008PTC178830
  • GSTIN29AADCR8947D1Z0
  • Authorized SignatoryMr. Anand Rao
  • CeoVenkatesan Gopalakrishnan
  • DirectorsVENKATESAN GOPALAKRISHNAN, KARANAM VIJAY SHREENIVAS, MONISH KRISHNA, DHRUV AHUJA
  • Project HeadsMr. MONISH KRISHNA, Mr. DHRUV AHUJA, Mr. VIJAY SHREENIVAS KARANAM, Mr. VENKATESH GOPALKRISHNAN
  • Other registrations10 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredJan 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Jan 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed138 files

Current status

100%225 of 225 units booked
72.8%Of the estimated cost spent so far

Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CEDAR---2250225

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 18 construction stages are filed complete. The stage furthest along is Sub-structure flooring (Parking Floor, at 98%.

Building: 65% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)98%
Retaining wall (All types)100%
RCC or MS Framed structure100%
Masonry Construction100%
Plastering inside , outside & Ceiling76%
Joinery: Doors, Windows, Ventilators etc4%
Basic work of Water supply, Sanitary and Electrification80%
Dadoing, Skirting, Flooring, Tiles work (All types)70%
Railing and Grill fixing81%
Electrification, Water supply and Sanitary Finishing19%
Painting0%
Fire prevention and fire fighting fitting and fixture with network36%
Weather Proof work(tile,concrete)90%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings18%

Progress on shared amenities40

As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes68%
Water conservation/rain water harvesting/recharge of ground waterYes48%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes46%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes46%
Internal Roads & FootpathsYes50%
Electricity supply transformer and substationYes0%
Storm water drainsYes20%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes68%
Parks & Tree plantingYes18%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes40%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes60%
LiftsYes60%
Corridor/LobbiesYes60%
Fire escapesYes47%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes98%
TerraceYes69%
Outer WallNoNot applicable
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,312 sq m
Named landowners2
LandownerVillageDistrict
ETA Star Infopark--
ETA Karnataka Estates Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 167.49 cr
Cost incurredRs 121.86 cr
Spent of the estimate72.76%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 167.49 crRs 107.69 cr
On-site expenditure-Site Overhead-Rs 14.17 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSrimathi J Adiga
EngineerVishnu Kumar
Chartered AccountantBhavesh Ramesh Nagda

Complaints filed with RERA Karnataka3

Case no.ComplainantRespondentFiled
01186/2023-Relationship Properties Private Limited26/07/2023
01187/2023-Relationship Properties Private Limited26/07/2023
00408/2024-Relationship Properties Private Limited23/04/2024

Documents filed138

As listed on the registration, under the names the promoter filed them with; the newest 80 of 138 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180122/004645 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 T8 Cedar Q2 26-27.pdf13 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 T8 Cedar Q2 26-27.pdf13 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 T8 Cedar Q2 26-27.pdf13 Oct 2026
Q2 2026-27 Water supply and sewage board13 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)13 Oct 2026
Q2 2026-27 KPTCL- BESCOM13 Oct 2026
Q2 2026-27 Fire and Safety13 Oct 2026
Q2 2026-27 Airport Authority of India13 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department13 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 T8 Cedar Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 T8 Cedar Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 T8 Cedar Q1 26-27.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 T8 Q4 25-26.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 T8 Q4 25-26.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 T8 Q4 25-26.pdf15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 T8 Q3 25-26.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 T8 Q3 25-26.pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 T8 Q3 25-26.pdf15 Jan 2026
Clarification letter to RERA NoticeFile: Clarification letter to RERA Notice T8 DT 12 01 2021.pdf13 Jan 2022
BDA Work OrderFile: 1 BDA Work Order.pdf13 Jan 2022
BDA Approved planFile: 2 BDA Approved plan.pdf13 Jan 2022
BBMP plan approval letterFile: 3 BBMP plan approval letter.pdf13 Jan 2022
Site Plan BBMPFile: 4 Site Plan BBMP.pdf13 Jan 2022
Demarcation PlanFile: 5 Demarcation Plan.pdf13 Jan 2022
T8 - Demarcation Site PlanFile: 6 T8 - Demarcation Site Plan.pdf13 Jan 2022
T8 - Section PlanFile: 7 T8 - Section Plan.pdf13 Jan 2022
T8 - Elevation PlanFile: 8 T8 - Elevation Plan.pdf13 Jan 2022
Lower Basement PlanFile: 9 Lower Basement Plan.pdf13 Jan 2022
Upper BasementFile: 10 Upper Basement.pdf13 Jan 2022
T8 - Ground Floor planFile: 11 T8 - Ground Floor plan.pdf13 Jan 2022
T8 - 1 floor planFile: 12 T8 - 1 floor plan.pdf13 Jan 2022
T8 - 2 floor planFile: 13 T8 - 2 floor plan.pdf13 Jan 2022
T8 - 3 4 10 11 12 13 19 20 21 22 floor planFile: 14 T8 - 3 4 10 11 12 13 19 20 21 22 floor plan.pdf13 Jan 2022
T8 - 5 6 7 14 15 16 23 24 25 floor planFile: 15 T8 - 5 6 7 14 15 16 23 24 25 floor plan.pdf13 Jan 2022
T8 - 8 17 26 floor planFile: 16 T8 - 8 17 26 floor plan.pdf13 Jan 2022
T8 - 9 27 floor planFile: 17 T8 - 9 27 floor plan.pdf13 Jan 2022
T8 - 18 floor planFile: 18 T8 - 18 floor plan.pdf13 Jan 2022
T8 - 28 floor planFile: 19 T8 - 28 floor plan.pdf13 Jan 2022
T8 - 29 30 31 32 floor planFile: 20 T8 - 29 30 31 32 floor plan.pdf13 Jan 2022
T8 - terrace floor planFile: 21 T8 - terrace floor plan.pdf13 Jan 2022
NOC SEIAAFile: 1 NOC SEIAA.pdf13 Jan 2022
MOEF CIRCULAR DT 12TH APRIL 2016File: 2 MOEF CIRCULAR DT 12TH APRIL 2016.pdf13 Jan 2022
Gazette Notification on validity of ECFile: 3 Gazette Notification on validity of EC.pdf13 Jan 2022
NOC BWSSBFile: 4 NOC BWSSB.pdf13 Jan 2022
NOC BescomFile: 5 NOC Bescom.pdf13 Jan 2022
NOC BSNLFile: 6 NOC BSNL.pdf13 Jan 2022
U G SUMP and STP LAYOUTFile: U G SUMP and STP LAYOUT.pdf13 Jan 2022
T8 RERA Site Plan with STP demarcationFile: T8 RERA Site Plan with UDS Calculation STP.pdf13 Jan 2022
Agreement of SaleFile: Proforma AFS T8.pdf13 Jan 2022
Structural Stability CertificateFile: Structural stability certificate T8.pdf13 Jan 2022
Common Areas to be Allotted to AssociationFile: Parkwest - Cedar - Tower 8 CEDAR.xlsx13 Jan 2022
Area Development PlanFile: Phase 03 Approved Development Plan.pdf13 Jan 2022
Registration CertificateFile: RPPL_Registration Certificate.pdf-
Organization StructureFile: 3 Organisation structure.xlsx-
Certificate issued by CA Form 1File: Form 1 -CA Certificate Cedar Tower 8.pdf-
Certificate issued by Architect Form 2File: Form 2 Arch Certificate Cedar Tower 8.pdf-
Certificate issued by Engineer Form 3File: Form 3 CE Certificate Cedar Tower 8.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non-Litigation affidavit.pdf-
Certificate from Chartered AccountFile: Form 1 -CA Certificate Cedar Tower 8.pdf-
Balance Sheet 2020 - 2021File: Balanc sheet 2020-21.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet 2019 - 20.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet 2018 - 19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit and Loss 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit and Loss 2019-20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and Loss 2018-19.pdf-
Director's Report 2019 - 2020File: Director Report 2019-20.pdf-
Director's Report 2018 - 2019File: Directors Report 2018-19.pdf-
Cash Flow Statement 2020 - 2021File: Cash Flow 2020-21.pdf-
Cash Flow Statement 2019 - 2020File: Cash Flow 2019 - 20.pdf-

Promoter's earlier projects9

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 not delivered by the promised date3 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Parkwest - Oak - Tower 10"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"OngoingJun 2025Not delivered
Parkwest - Pine - Tower 9"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"OngoingDec 2024Not delivered
Parkwest - Mahogany - Tower 7"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"OngoingDec 2023Not delivered
Parkwest - Magnolia - Tower 6"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"OngoingJan 2023Not delivered
Parkwest - Sapphire - Tower 5 Litigation"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"OngoingSep 2022Not delivered
Parkwest - Maple - Tower 4 Litigation"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"OngoingSep 2022Not delivered
Parkwest - Olive - Tower 1"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"Completed-No date filed
Parkwest - Mulberry - Tower 3"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"Completed-No date filed
Parkwest - Emerald - Tower 2"Municipal No 1/1, Binnymill Road, Binnypet, Bangalore"Completed-No date filed

How this compares with Bengaluru Urban

100%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Parkwest - Cedar - Tower 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmParkwest - Cedar - TowerOther 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: Relationship Properties Private Limited

Relationship Properties Private Limited has 11 registrations on RERA Karnataka, including Parkwest - Olive - Tower 1 and Parkwest - Maple - Tower 4. Its filings declare 9 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Parkwest - Cedar - Tower 8 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Parkwest - Cedar - Tower 8?

The registered promoter entity is Relationship Properties Private Limited, a company as per the filing. Its CIN U45200MH2008PTC178830 and GSTIN 29AADCR8947D1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Parkwest - Cedar - Tower 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Parkwest - Cedar - Tower 8?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Parkwest - Cedar - Tower 8?

The professionals named in the filing: Architect: Srimathi J Adiga; Engineer: Vishnu Kumar; Chartered Accountant: Bhavesh Ramesh Nagda. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Parkwest - Cedar - Tower 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Parkwest - Cedar - Tower 8. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Parkwest - Cedar - Tower 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.