Home / Browse projects / Bengaluru Urban, Karnataka / PURSUITOFARADICALRHAPSODYPHASE1
PURSUITOFARADICALRHAPSODYPHASE1
By Total Environment Habitat Private Limited
RG-KA-84830 · RERA PRM/KA/RERA/1251/446/PR/171014/000433 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- Litigation declared, 2 cases
- 21 complaints at RERA Karnataka
- Completion date moved by 33 months
- 3 extensions taken
Clear
- Separate project account declared
Saved.
PURSUITOFARADICALRHAPSODYPHASE1 is a Mixed Development project by Total Environment Habitat Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/171014/000433 on 14 Oct 2017. Possession is promised by 30 Apr 2027. The completion date has moved by 33 months from the original filing. 539 of the 552 units on this registration are recorded sold or booked, and 4 of 19 construction stages are filed complete. 21 complaints are on record with the regulator.
At a glance
Project
- NamePURSUITOFARADICALRHAPSODYPHASE1
- TypeMixed Development
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/171014/000433
- ReraGenie IDRG-KA-84830
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on14 Oct 2017
- Promised completion30 Apr 2027
- Revised completionRevised to 30 Apr 2027 (originally 31 Jul 2024)
- Buildings5 building records
- Documents filed103 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 01 | - | - | - | 114 | 0 | 114 |
| Tower 02 | - | - | - | 130 | 0 | 130 |
| Tower 03 | - | - | - | 130 | 0 | 130 |
| Tower 04 | - | - | - | 130 | 0 | 130 |
| Villas | - | - | - | 48 | 0 | 48 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 19 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 95%.
Building: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 95% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 51% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 89% |
| Plastering inside , outside & Ceiling | 87% |
| Joinery: Doors, Windows, Ventilators etc | 47% |
| Basic work of Water supply, Sanitary and Electrification | 45% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 57% |
| Railing and Grill fixing | 56% |
| Electrification, Water supply and Sanitary Finishing | 54% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 48% |
| Fire prevention and fire fighting fitting and fixture with network | 60% |
| Weather Proof work(tile,concrete) | 72% |
| Painting | 48% |
| Elevation work | 89% |
| Internal and External work including landscapes as per santioned drawings | 80% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Internal Roads & Footpaths | Yes | 85% |
| Sewage and Drainage System | Yes | 95% |
| Parks & Tree planting | Yes | 80% |
| Street Lighting | Yes | 70% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 95% |
| Solid waste management and disposal | Yes | 90% |
| Water conservation | Yes | 95% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | 40% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Electricity | Yes | 30% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 95% |
| Community Hall | Yes | 100% |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 95% |
| Swimming Pool | Yes | 45% |
| Gym | Yes | 100% |
| Parks | Yes | 80% |
| Power Backup | Yes | 10% |
| Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 95% |
| Lifts | Yes | 99% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 93% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 70% |
| Basement | Yes | 65% |
| Terrace | Yes | 50% |
| Outer Wall | Yes | 50% |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 945.77 cr | Rs 934.79 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 444.11 cr | Rs 563.19 cr |
| On-site expenditure-Site Overhead | Rs 214.69 cr | Rs 111.57 cr |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterShortage of Building Materials, Concrete, Jalli etc; Shortage of Labour
No reason recorded in the filing
Litigation declared2
| Case | Court | Status |
|---|---|---|
| OS 27087/08 | City Civil Court, CCH 29 | - |
| OS 2189/06 | Prl. Senior Civil Judge, Bengaluru Rural | - |
Complaints filed with RERA Karnataka21
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/210918/0008353 | - | Total Environment Habitat Private Limited | 18/09/2021 |
| CMP/211005/0008418 | - | Total Environment Habitat Private Limited | 05/10/2021 |
| 00797/2024 | - | Total Environment Habitat Private Limited | 26/08/2024 |
| 00850/2024 | - | Total Environment Habitat Private Limited | 10/09/2024 |
| 00934/2024 | - | Total Environment Habitat Private Limited | 25/09/2024 |
| 00959/2024 | - | Total Environment Habitat Private Limited | 01/10/2024 |
| 01026/2024 | - | Total Environment Habitat Private Limited | 18/10/2024 |
| 01278/2024 | - | Total Environment Habitat Private Limited | 02/12/2024 |
| 01287/2024 | - | Total Environment Habitat Private Limited | 17/12/2024 |
| 00406/2025 | - | Total Environment Habitat Private Limited | 08/03/2025 |
| 00728/2025 | - | Total Environment Habitat Private Limited | 13/05/2025 |
| 00940/2025 | - | Total Environment Habitat Private Limited | 15/07/2025 |
| 00944/2025 | - | Total Environment Habitat Private Limited | 15/07/2025 |
| 01033/2025 | - | Total Environment Habitat Private Limited | 21/08/2025 |
| 01098/2025 | - | Total Environment Habitat Private Limited | 29/08/2025 |
| 01099/2025 | - | Total Environment Habitat Private Limited | 29/08/2025 |
| 00981/2026 | - | Total Environment Habitat Private Limited | 10/08/2026 |
| 01064/2026 | - | Total Environment Habitat Private Limited | 27/08/2026 |
| 01090/2026 | - | Total Environment Habitat Private Limited | 02/09/2026 |
| 01119/2026 | - | Total Environment Habitat Private Limited | 11/09/2026 |
| 01215/2026 | - | Total Environment Habitat Private Limited | 12/10/2026 |
Documents filed103
As listed on the registration, under the names the promoter filed them with; the newest 80 of 103 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/171014/000433 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM-4 PURSUIT OF A RADICAL RHAPSODY PHASE 1 Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM-5 PURSUIT OF A RADICAL RHAPSODY PHASE 1 Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM-6 PURSUIT OF A RADICAL RHAPSODY PHASE 1 Q2 26-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 PoaRR Phase 1 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 PoaRR Phase 1 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 PoaRR Phase 1 Q1 26-27.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Q4 25-26 POARR phase 1.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Q4 25-26 POARR phase 1.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Q4 25-26 POARR phase 1.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 CA certificates Q3-25-26 pdf.pdf | 27 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 2025-26 Q3 RERA Arch cert 1.pdf | 27 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Pursuit of a Radical Rhapsody Phase 1 31-12-2025.pdf | 27 Jan 2026 |
| CertificateFile: 1TEHabitatCOI.pdf | - |
| Project Details | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: SECTION & ELEVATION COMPARISION - PHASE 1.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: SECTION & ELEVATION COMPARISION - PHASE 1.pdf | - |
| List Of AllotteesFile: PoaRR Phase 1 Sold and Unsold Inventory.xlsx | - |
| Chartered Accountant CertificateFile: Form-4 CA Certificate PoaRR Phase 1.pdf | - |
| Notarized AffidavitFile: Affidavit cum Declaration.pdf | - |
| Architect CertificateFile: Form-5 Architect Certificate PoaRR Phase1.pdf | - |
| Structural Engineer Certificate for stability of structureFile: Stability certificate Phase 1.pdf | - |
| Modification of Plan DetailsFile: 4RBBMPDevelopmentPlanV1.pdf | - |
| Modification of Plan DetailsFile: PoaRR_BBMP Building Plan_15Sep2022.pdf | - |
| Modification of Plan DetailsFile: PoaRR Phase 1 Sold and Unsold Inventory.xlsx | - |
| Modification of Plan DetailsFile: PoaRR Phase 1 Sold and Unsold Inventory.xlsx | - |
| Document 1File: Fire NOC with Fee paid receipt.pdf | - |
| Document 2File: AAI NOC 2021.pdf | - |
| Document 3File: KSPCB NOC with fee paid receipt.pdf | - |
| Document 4File: SEIAA POARR 2022.pdf | - |
| Document 5File: POARR HAL NOC 2021 136 137 175.pdf | - |
| Document 6File: POARR HAL NOC 2021 170 172.pdf | - |
| PoaRR DP 2022File: PoaRR DP 2022.pdf | - |
| BBMP Building LicenceFile: BBMP Building Licence.pdf | - |
| BBMP Site PlanFile: BBMP Site Plan.pdf | - |
| PoaRR DP 2022 Work orderFile: PoaRR DP 2022 Work order.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Ex-1.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Ex-5.pdf | - |
| CA Certificate for Funds UtilizationFile: Ex-3.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Ex-2.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Ex-6.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Ex-4.pdf | - |
| AffidavitFile: Affidavit Form EX7.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| Document 1File: Sold and unsold units.pdf | - |
| Document 2File: PoaRR - OC Tower-1.pdf | - |
| Document 3File: PoaRR - OC Tower-2.pdf | - |
| Document 4File: T9 48Villa OC 1.pdf | - |
| 4BBBMPSanctionDocument | - |
| 40BBMPDevelopmentPlan | - |
| 18POaRRSaleDeedRERA | - |
| 19AfSPoaRR30Jul17 | - |
| 41EXISTING SITE DEVELOPMENT PLAN - R1 | - |
| 4Y1Sections | - |
| 49 RTCs and Sale Deeds | - |
| 23 APPROVED BUILDING SECTION | - |
| 4RBBMPDevelopmentPlanV1 | - |
| 21PoaRRAllotmentLetterRERA | - |
| Pursuit of a Radical Rhapsody RERA BROCHURE v09 | - |
| 5A2PoaRRNoC | - |
| 4TPoaRRSpecifications | - |
| 52 Encumbrance Cretificate Final | - |
| 30PoaRR Amalgamated Katha | - |
| 48JDAKBhaskar&OthersBChittibabu&Others | - |
| 50 Opinion_PoaRR | - |
| 59Conversion Order Low Res | - |
| 51 BDA | - |
| 42 Fire | - |
| 43 AAI | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep PURSUITOFARADICALRHAPSODYPHASE1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Total Environment Habitat Private Limited
Total Environment Habitat Private Limited has 3 registrations on RERA Karnataka, including PURSUITOFARADICALRHAPSODYPHASE1 and PURSUIT OF A RADICAL RHAPSODY PHASE 2. Its filings declare 2 earlier projects, none of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if PURSUITOFARADICALRHAPSODYPHASE1 is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PURSUITOFARADICALRHAPSODYPHASE1?
The registered promoter entity is Total Environment Habitat Private Limited, a company as per the filing. Its CIN U45201KA2010PTC054651 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PURSUITOFARADICALRHAPSODYPHASE1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PURSUITOFARADICALRHAPSODYPHASE1?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
What should I check before booking in PURSUITOFARADICALRHAPSODYPHASE1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback