Home / Browse projects / Mumbai Suburban, Maharashtra / Puneet Amarjyoti

Registered No litigation declared Residential / Group Housing project

Puneet Amarjyoti

By PUNEET EDIFICE PVT LTD

RG-MH-57078 · RERA P51800046906 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 37.00 crore secured on the land, in favour of Capri Global Hosuing Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 83%
0 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 195 documents Report an error

Puneet Amarjyoti is a Residential / Group Housing project by PUNEET EDIFICE PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046906 on 19 Sep 2022. Possession is promised by 31 Dec 2026. 54 of the 54 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NamePuneet Amarjyoti
  • TypeResidential / Group Housing
  • Location
    • Building no 27 Tagore Nagar
    • Hariyali Vikhroli
    • Kurla
    • Mumbai Suburban
    • 400083
  • Pincode400083
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046906
  • ReraGenie IDRG-MH-57078

Builder

  • NamePUNEET EDIFICE PVT LTD
  • Entity typeCompany
  • CINU70109MH2019PTC333338
  • GSTIN27AAKCP8860G1ZX
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsASHA SUBHASH PATIL, Prateek Subhash Patil
  • Other registrations4 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed195 files

Current status

100%54 of 54 units booked
49.9%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Puneet AmarjyotiNA1054054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 83%.

Puneet Amarjyoti: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor40%
Slabs of Super Structure83%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises28%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.9%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area845 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofCapri Global Hosuing Finance Limited
Secured amountRs 37.00 crore
CERSAI search filedYes
Declared on21 Jan 2026
LandownerVillageDistrict
Tagore Nagar Amarjyoti Co Op Hsg Soc LtdKurlaMumbai Suburban

Approvals and building plan

Permissible FSI7950.0
Proposed, not sanctioned2,371 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOne Indiabulls Centre Tower 2B 3rd floor 841 Senapati Bapat Marg Lower Parel West Mumbai 400013
Estimated costRs 35.53 cr
Cost incurredRs 17.72 cr
Work done49.88%
BuildingWingEstimatedIncurred
Puneet AmarjyotiNARs 35.53 crRs 17.72 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSubhash Ganpatrao Patil
EngineerJW Consultants LLP
EngineerSreekumar Girish Nair
Chartered AccountantAnshani and Associates Chartered Accountants
Chartered AccountantSapna Bhagwandas Rohra
PartnerRole in project
PUNEET EDIFICE PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed195

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 195 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form -1.pdf15 May 2026
Withdrawal Update Form 1File: Form -1.pdf15 May 2026
Withdrawal Update Form 2File: Form 2.pdf15 May 2026
Withdrawal Update Form 2File: Form 2.pdf15 May 2026
Withdrawal Update Form 3File: Form 3.pdf15 May 2026
Withdrawal Update Form 3File: Form 3.pdf15 May 2026
Form 1File: Architect Form 1.pdf17 Mar 2026
Form 2File: Form-2 Amarjyoti Q-4.pdf17 Mar 2026
Form 3File: Form-3.pdf17 Mar 2026
Disclosure of Sold and Booked InventoryFile: disc 2.pdf17 Mar 2026
Self-declaration of Quarterly ProgressFile: self decla 3.pdf17 Mar 2026
Withdrawal Update Form 1File: FORM 1 AMARJYOTI.pdf17 Mar 2026
Withdrawal Update Form 1File: fORM 1.pdf17 Mar 2026
Withdrawal Update Form 2File: AMARJYOTI FROM 2.pdf17 Mar 2026
Withdrawal Update Form 2File: fORM 2.pdf17 Mar 2026
Withdrawal Update Form 3File: AMARJYOTI FROM 3.pdf17 Mar 2026
Withdrawal Update Form 3File: fORM 3.pdf17 Mar 2026
Withdrawal Update Form 1File: TN-27-AMARJYOTI ARCHITECTu0027S CERTIFICATE.pdf19 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf19 Feb 2026
Withdrawal Update Form 2File: AMARJYOTI FROM 2.pdf19 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf19 Feb 2026
Withdrawal Update Form 3File: AMARJYOTI FROM 3.pdf19 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf19 Feb 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Amarjyoti Q-4.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Amarjyoti Q-4.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2025_03_31 T27 AMARJYOTI ARCH CERT .pdf4 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q-3 Form-3 Amarjyoti.pdf3 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-3 Form-2 Amarjyoti.pdf3 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 Form 1 Ac.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 Form 1 Ac.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31122024 Form 1 Ac.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Sign.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Sign.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Sign.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Sign.pdf25 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Sign.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Sign.pdf25 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Puneet Edifice Brahmand Project Form 5 FY 2023-24 (1).pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Puneet Edifice Brahmand Project Form 5 FY 2023-24 (1).pdf17 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Puneet Edifice Brahmand Project Form 5 FY 2023-24 (1).pdf17 Dec 2024
Building plan approvalFile: Amended IOA -1.pdf10 Dec 2024
Building plan approvalFile: IOA-2.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -3.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -4.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -1.pdf10 Dec 2024
Building plan approvalFile: IOA-2.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -3.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -4.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -1.pdf10 Dec 2024
Building plan approvalFile: IOA-2.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -3.pdf10 Dec 2024
Building plan approvalFile: Amended IOA -4.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -1.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA-2.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -3.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -4.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -1.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA-2.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -3.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -4.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -1.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA-2.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -3.pdf10 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA -4.pdf10 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B No 27 Arch.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B No 27 Arch.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B No 27 Arch.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B No 27 Arch.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Amarjyoti form 2.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Amarjyoti form 3.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed T27 Amarjyoti Architect Cert.pdf9 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance certificate.pdf3 Jul 2024
Details of encumbrances concerned to LegalFile: Encumbrance certificate.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4.pdf18 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERT AMARJYOTI.pdf10 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Puneet Amarjyoti.pdf27 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Sept 2023.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CA Puneet Amar Jyoti Dec 2023.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Dec 2023.pdf12 Feb 2024

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Puneet Amarjyoti on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hariyali Vikhroli6,700+ in Mumbai Suburban

2 kmPuneet AmarjyotiCompleted 26Lapsed / revoked 25Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 140 registered projects within 2 km.

Builder: PUNEET EDIFICE PVT LTD

PUNEET EDIFICE PVT LTD has 5 registrations on MahaRERA, including PUNEET SHIVALAYA and Puneet Brahmand. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Puneet Amarjyoti is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Puneet Amarjyoti?

The registered promoter entity is PUNEET EDIFICE PVT LTD, a company as per the filing. Its CIN U70109MH2019PTC333338 and GSTIN 27AAKCP8860G1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Puneet Amarjyoti?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Puneet Amarjyoti?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Puneet Amarjyoti?

The professionals named in the filing: Architect: Subhash Ganpatrao Patil; Engineer: JW Consultants LLP; Engineer: Sreekumar Girish Nair; Chartered Accountant: Anshani and Associates Chartered Accountants; Chartered Accountant: Sapna Bhagwandas Rohra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Puneet Amarjyoti?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Puneet Amarjyoti. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Puneet Amarjyoti to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.