Home / Browse projects / Bengaluru Urban, Karnataka / Provident Park Square 4

Registration approved Residential/Group Housing project

Provident Park Square 4

By Puravankara Limited

RG-KA-76805 · RERA PRM/KA/RERA/1251/310/PR/190129/002307

Source: official RERA Karnataka filing

Red flags

  • 16 complaints at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
May 2024Possession promisedmoved 21 months from the original
16Complaints at RERA Karnatakaon this registration
Jump to the 64 documents Report an error

Provident Park Square 4 is a Residential/Group Housing project by Puravankara Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190129/002307 on 29 Jan 2019. Possession is promised by 28 May 2024. The completion date has moved by 21 months from the original filing. 16 complaints are on record with the regulator.

At a glance

Project

  • NameProvident Park Square 4
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/190129/002307
  • ReraGenie IDRG-KA-76805

Builder

  • NamePuravankara Limited
  • Entity typeCompany
  • CINL45200KA1986PLC051571
  • Authorized SignatoryNani R Choksey
  • Other registrations26 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2019First promiseAug 2022Revised toMay 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Jan 2019
  • Promised completion28 May 2024
  • Revised completionRevised to 28 May 2024 (originally 31 Aug 2022)
  • Buildings3 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B1-1B---1190119
B3-3C---1040104
B3-3D---1040104

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,787 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 100.28 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionAug 2022 → May 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/230525/002307May 2023 → May 2024

Reason as filed by the promoterForce Majeure

Complaints filed with RERA Karnataka16

Case no.ComplainantRespondentFiled
CMP/190618/0003322-Puravankara Limited18/06/2019
CMP/210310/0007775-Puravankara Limited10/03/2021
01215/2023-Puravankara Limited04/08/2023
01612/2023-Puravankara Limited19/10/2023
00365/2024-Puravankara Limited08/04/2024
00474/2024-Puravankara Limited24/05/2024
00511/2024-Puravankara Limited28/05/2024
00671/2024-Puravankara Limited08/07/2024
01048/2024-Puravankara Limited23/10/2024
01222/2024-Puravankara Limited20/11/2024
00438/2025-Puravankara Limited11/03/2025
00801/2025-Puravankara Limited10/06/2025
00822/2025-Puravankara Limited11/06/2025
01016/2025-Puravankara Limited16/08/2025
00326/2026-Puravankara Limited31/03/2026
01082/2026-Puravankara Limited31/08/2026

Documents filed64

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190129/002307 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: COI.PDF-
Architect Certificate for Work Completion Schedule till DateFile: Form Ex 1 Status of the work Architect Phase 4.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form 5 Engineer Status.pdf-
CA Certificate for Funds UtilizationFile: Form-ex3 SD.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form Ex 2 Pending work Architect Phase 4 (003).pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form 6 Engineer Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: Form-ex4 SD.pdf-
AffidavitFile: Affidavit Ex 7_compressed.pdf-
Latest Encumbrance CertificateFile: EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (5).xlsx-
Document 1File: KSPCB CFO.pdf-
Document 2File: Fire Completion Certificate.pdf-
Document 3File: 2022_06_29 11_58 Office Lens (1).pdf-
Document 4File: Form B.pdf-
Provident Parksquare 4-
Development Plan_size-
Site_Phase_Floor-
Upload_Allotment Letter-
Upload_Allotment Letter-
Sale Deeds and RTC_sized-
Development Plan_size-
Phases Plan-
Upload_Allotment Letter-
002-
3_1 CA Certificate PS4-
Specs_sized-
13 years EC Development land-
3_1 Affidavit (002586) Notarized-
Khata_Assessment-
Joint Development Agreement-
Conversion_OMs-
Fire NOC New-
AAI Old-
BESCOM New-
BWSSB-
CFE 2017-
SEIAA New-
BSNL-
Section_Elevation-
Site Plan-
Specs_sized-
3-3_a1 Conversion OM-
Purva - Mallasandra - Updated Title Report - 201-
Balance Sheet 2016 - 2017File: Balance Sheet 0317.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet Mar-16.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet-Mar-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: PL Statement 0317.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and Loss account Mar-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss account-Mar-15.pdf-
Director's Report 2016 - 2017File: Directors Report 2016-17 Puravankara Limited.pdf-
Director's Report 2015 - 2016File: Directors Report -2015-16.pdf-
Director's Report 2014 - 2015File: Directors Report-2014-15.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement 0317.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement Mar-16.pdf-
Auditor's Report 2016 - 2017File: Auditors Report 0317.pdf-
Auditor's Report 2015 - 2016File: Auditor Report Mar-16.pdf-
Auditor's Report 2014 - 2015File: Auditor Report-Mar-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Purvankara - ITR V Mar-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR V Ack_ AY-16-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR V Ack-AY-15-16.pdf-
Affidavit and Declaration - Provident Parksquare 4-
Prospectus/BrochureFile: 3rd Mar - Hindu - J1 ad - 33cm x 47cm.pdf-
Advertisement Copy 1File: 3rd Mar - Hindu - J1 ad - 33cm x 47cm.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190129_002307.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Provident Park Square 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmProvident Park Square 4Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: Puravankara Limited

Puravankara Limited has 27 registrations on RERA Karnataka, including Provident Deansgate and Provident Deansgate Phase 2. Its filings declare 5 earlier projects, 5 of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Provident Park Square 4 is delayed beyond 28 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Provident Park Square 4?

The registered promoter entity is Puravankara Limited, a company as per the filing. Its CIN L45200KA1986PLC051571 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Provident Park Square 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Provident Park Square 4?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Provident Park Square 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Provident Park Square 4. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Provident Park Square 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.