Home / Browse projects / Bengaluru Urban, Karnataka / Provident Equinox 2
Provident Equinox 2
RG-KA-81405 · RERA PRM/KA/RERA/1251/310/PR/190529/002585 · Last updated on RERA Karnataka portal: 19 Oct 2020
Source: official RERA Karnataka filing
Red flags
- 4 complaints at RERA Karnataka
- Completion date moved by 33 months
- 3 extensions taken
Clear
- Separate project account declared
Saved.
Provident Equinox 2 is a Residential/Group Housing project by Provident Housing Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190529/002585 on 29 May 2019. Possession is promised by 30 Jun 2025. The completion date has moved by 33 months from the original filing. 4 complaints are on record with the regulator.
At a glance
Project
- NameProvident Equinox 2
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/190529/002585
- ReraGenie IDRG-KA-81405
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on29 May 2019
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Sep 2022)
- Buildings3 building records
- Documents filed71 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block 4 - Wing K | - | - | - | 96 | 0 | 96 |
| Block 4 - Wing L | - | - | - | 96 | 0 | 96 |
| Block 4 - Wing M | - | - | - | 96 | 0 | 96 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 19 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | Not applicable |
| Retaining wall (All types) | Not applicable |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | Not applicable |
| Plastering inside , outside & Ceiling | Not applicable |
| Joinery: Doors, Windows, Ventilators etc | Not applicable |
| Basic work of Water supply, Sanitary and Electrification | Not applicable |
| Dadoing, Skirting, Flooring, Tiles work (All types) | Not applicable |
| Railing and Grill fixing | Not applicable |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per santioned drawings | Not applicable |
Progress on shared amenities41
As on 19 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | No | Not applicable |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterDelay in Approvals
No reason recorded in the filing
Complaints filed with RERA Karnataka4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/210818/0008256 | - | Provident Housing Limited | 18/08/2021 |
| CMP/220322/0009233 | - | Provident Housing Limited | 22/03/2022 |
| CMP/221221/0010501 | - | Provident Housing Limited | 21/12/2022 |
| 00104/2024 | - | Provident Housing Limited | 20/01/2024 |
Documents filed71
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190529/002585 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Notarized AffidavitFile: New Affidavit EQ_2.pdf | 19 Oct 2020 |
| CA CertificateFile: Equinox Utilisation-2.pdf | 19 Oct 2020 |
| SubmissionFile: EQ2 Declaration.pdf | 19 Oct 2020 |
| CertificateFile: PHL_ROC_Certificate Of Incorporation[1].pdf | - |
| Project Details | - |
| Architect Certificate for Work Completion Schedule till DateFile: 20190619174122.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: EQ_2 Engg Declaration.pdf | - |
| CA Certificate for Funds UtilizationFile: Bank Statement.xlsx | - |
| Architect Certificate for Pending Work Completion Schedule.File: 20190619174129.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: EQ_2 Engg Declaration.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Bank Statement.xlsx | - |
| AffidavitFile: New Affidavit EQ_2.pdf | - |
| Latest Encumbrance CertificateFile: EC till 17012019.pdf | - |
| Consent letter from 2/3rd of AllotteesFile: Provident Equinox 2 - Affidavit & Declaration.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| NOC DetailsFile: 240319 Plan Renewal.pdf | - |
| Document 1File: Provident Equinox 2 - Affidavit & Declaration.pdf | - |
| Document 2File: New Affidavit EQ_2.pdf | - |
| Document 3File: EQ_2 Delay Reasons.pdf | - |
| Document 4File: Site Plan (R).jpg | - |
| Document 5File: Equinox Utilisation-2.pdf | - |
| Plan sanction Letter | - |
| Equinox 2 (Phase Plan) | - |
| Eq_2_Site_Floor | - |
| Allotment Letter (Equinox_1) | - |
| Allotment Letter (Equinox_1) | - |
| DoS_RTC | - |
| Equinox 2 (Phase Plan) | - |
| Equinox 2 (Phase Plan) | - |
| Allotment Letter (Equinox_1) | - |
| (CC) - RERA Declaration | - |
| Equinox 2 Standard | - |
| RERA_EC_All | - |
| 002887 3_1 Affidavit | - |
| Amalgamated Khata | - |
| DoS (7206) 061212 | - |
| EC_All | - |
| Conversion Order | - |
| Provident_Equinox_-2_RERA_Certificate | - |
| Relinquishment Deed | - |
| Fire NOC | - |
| AAI | - |
| BESCOM | - |
| BWSSB | - |
| KSPCB | - |
| SEIAA | - |
| BSNL | - |
| 1 Site Plan | - |
| 1 Site Plan | - |
| Conversion Order | - |
| Balance Sheet 2017 - 2018File: 2018 Bal Sheet.pdf | - |
| Balance Sheet 2016 - 2017File: 2017 Bal Sheet.pdf | - |
| Balance Sheet 2015 - 2016File: 2016 Bal Sheet.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: 2018 PandL.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: 2017 PandL.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: 2016 PandL.pdf | - |
| Director's Report 2017 - 2018File: 2018 (PHL) Directors Report.pdf | - |
| Director's Report 2016 - 2017File: 2017 (PHL) Directors Report.pdf | - |
| Director's Report 2015 - 2016File: 2016 (PHL) Directors Report.pdf | - |
| Cash Flow Statement 2017 - 2018File: 2018 Cash Flow.pdf | - |
| Cash Flow Statement 2016 - 2017File: 2017 Cash Flow.pdf | - |
| Auditor's Report 2017 - 2018File: 2018 Auditor Report.pdf | - |
| Auditor's Report 2016 - 2017File: 2017Auditors Report.pdf | - |
| Auditor's Report 2015 - 2016File: 2016Auditors Report.pdf | - |
| Income Tax Return Acknowledgement 2017 - 2018File: PHL - ITR V Mar-18.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: PHL - ITR V Mar-17.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: PHL - ITR V Mar-16.pdf | - |
| Equinox_2 Form B | - |
| Prospectus/BrochureFile: Provident Equinox A4 Brochure.pdf | - |
| Advertisement Copy 1File: Equinox #myhomemylife ad for TOI - 22August 2020.pdf | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190529_002585.xlsx | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Tree by Provident | - | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Provident Equinox 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 21 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Provident Housing Limited
Provident Housing Limited has 12 registrations on RERA Karnataka, including Provident Capella 1 and Provident Capella 2. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Provident Equinox 2 is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Provident Equinox 2?
The registered promoter entity is Provident Housing Limited, a company as per the filing. Its CIN U45200KA2008PLC048273 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Provident Equinox 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Provident Equinox 2?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
What should I check before booking in Provident Equinox 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback