Red flags

  • 10 complaints at RERA Karnataka
  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • Separate project account declared
Dec 2023Possession promisedmoved 21 months from the original
10Complaints at RERA Karnatakaon this registration
Jump to the 68 documents Report an error

Provident Equinox 1 (4N, 4P, 4Q, 4R) is a Residential/Group Housing project by Provident Housing Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/190525/002576 on 25 May 2019. Possession is promised by 31 Dec 2023. The completion date has moved by 21 months from the original filing. 10 complaints are on record with the regulator.

At a glance

Project

  • NameProvident Equinox 1 (4N, 4P, 4Q, 4R)
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/190525/002576
  • ReraGenie IDRG-KA-12856

Builder

  • NameProvident Housing Limited
  • Entity typeCompany
  • CINU45200KA2008PLC048273
  • Authorized SignatoryNani R Choksey
  • Other registrations11 more →
  • No longer live1 withdrawn or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredMay 2019First promiseMar 2022Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on25 May 2019
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 31 Mar 2022)
  • Buildings4 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK 4 WING N---96096
BLOCK 4 WING P---96096
BLOCK 4 WING Q---96096
BLOCK 4 WING R---96096

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 19 Oct 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 19 Oct 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,032 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 138.89 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2022 → Sep 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/230125/002576Sep 2022 → Dec 2023

Reason as filed by the promoterDelay in Approvals

Complaints filed with RERA Karnataka10

Case no.ComplainantRespondentFiled
CMP/191121/0004759-Provident Housing Limited21/11/2019
CMP/201107/0007029-Provident Housing Limited07/11/2020
CMP/221112/0010246-Provident Housing Limited12/11/2022
00539/2023-Provident Housing Limited24/04/2023
01742/2023-Provident Housing Limited22/11/2023
01838/2023-Provident Housing Limited16/12/2023
00747/2025-Provident Housing Limited16/05/2025
00887/2025-Provident Housing Limited30/06/2025
01131/2025-Provident Housing Limited03/09/2025
01195/2025-Provident Housing Limited20/09/2025

Documents filed68

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/190525/002576 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
AffidavitFile: New Affidavit EQ_1.pdf19 Oct 2020
Bank StatementFile: 251910101019.pdf19 Oct 2020
CA Certificate (Used)File: Equinox Utilisation-1.pdf19 Oct 2020
CA Certificate (To Go)File: Equinox 1.pdf19 Oct 2020
CertificateFile: PHL_ROC_Certificate Of Incorporation[1].pdf-
Architect Certificate for Work Completion Schedule till DateFile: 20190619174136.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: EQ_1 Engg Declaration.pdf-
CA Certificate for Funds UtilizationFile: Bank Statement.xlsx-
Architect Certificate for Pending Work Completion Schedule.File: 20190619174146.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: EQ_1 Engg Declaration.pdf-
CA Certificate for Funds required for Project CompletionFile: Bank Statement.xlsx-
AffidavitFile: Provident Equinox 1 - Affidavit.pdf-
Latest Encumbrance CertificateFile: EC till 17012019.pdf-
Consent letter from 2/3rd of AllotteesFile: EQ_1 Delay Reasons.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
NOC DetailsFile: 240319 Plan Renewal.pdf-
Document 1File: Provident Equinox 1 - Affidavit & Declaration.pdf-
Document 2File: Provident Equinox 1 - Affidavit.pdf-
Document 3File: CA Cert.pdf-
Plan sanction Letter-
Site Plan (R) (NXPowerLite Copy)-
Eq_1_Site_Floor-
Allotment Letter (Equinox_1)-
Allotment Letter (Equinox_1)-
DoS_RTC-
B4 Typical Floor (2_12_NPQR)-
Site Plan (R) (NXPowerLite Copy)-
Allotment Letter (Equinox_1)-
(CC) - RERA Declaration-
3_1 Affidavit (Equinox_1)-
Equinox 2 Standard-
RERA_EC_All-
002910 3_1 Affidavit-
002910 3_1 Affidavit-
Khata-
DoS (7206) 061212-
Conversion and EC-
Fire NOC-
AAI-
BESCOM-
BWSSB-
KSPCB-
SEIAA-
BSNL-
Equinox_1 and Site Plan-
B4 Terrace Plan (NPQR)-
Conversion Order-
Balance Sheet 2017 - 2018File: 2018 Bal Sheet.pdf-
Balance Sheet 2016 - 2017File: 2017 Bal Sheet.pdf-
Balance Sheet 2015 - 2016File: 2016 Bal Sheet.pdf-
Audited Profit and Loss Statement 2017 - 2018File: 2018 PandL.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 2017 PandL.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2016 PandL.pdf-
Director's Report 2017 - 2018File: 2018 (PHL) Directors Report.pdf-
Director's Report 2016 - 2017File: 2017 (PHL) Directors Report.pdf-
Director's Report 2015 - 2016File: 2016 (PHL) Directors Report.pdf-
Cash Flow Statement 2017 - 2018File: 2018 Cash Flow.pdf-
Cash Flow Statement 2016 - 2017File: 2017 Cash Flow.pdf-
Auditor's Report 2017 - 2018File: 2018 Auditor Report.pdf-
Auditor's Report 2016 - 2017File: 2017Auditors Report.pdf-
Auditor's Report 2015 - 2016File: 2016Auditors Report.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: PHL - ITR V Mar-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: PHL - ITR V Mar-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: PHL - ITR V Mar-16.pdf-
Equinox_1 Form B-
Prospectus/BrochureFile: Provident Equinox A4 Brochure.pdf-
Advertisement Copy 1File: Equinox #myhomemylife ad for TOI - 22August 2020.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_190525_002576.xlsx-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Tree by Provident-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Provident Equinox 1 (4N, 4P, 4Q, 4R) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmProvident Equinox 1 (4N,Lapsed / revoked 1Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Provident Housing Limited

Provident Housing Limited has 12 registrations on RERA Karnataka, including Provident Capella 1 and Provident Capella 2. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Provident Equinox 1 (4N, 4P, 4Q, 4R) is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Provident Equinox 1 (4N, 4P, 4Q, 4R)?

The registered promoter entity is Provident Housing Limited, a company as per the filing. Its CIN U45200KA2008PLC048273 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Provident Equinox 1 (4N, 4P, 4Q, 4R)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Provident Equinox 1 (4N, 4P, 4Q, 4R)?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

What should I check before booking in Provident Equinox 1 (4N, 4P, 4Q, 4R)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Provident Equinox 1 (4N, 4P, 4Q, 4R). Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Provident Equinox 1 (4N, 4P, 4Q, 4R) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.