Home / Browse projects / Bengaluru Urban, Karnataka / PROVIDENCE

Registration approved Residential/Group Housing project

PROVIDENCE

By LEWIS INFRASTRUCTURE AND PROJECTS

RG-KA-97796 · RERA PRM/KA/RERA/1251/309/PR/191116/003007

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Jan 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 35 documents Report an error

PROVIDENCE is a Residential/Group Housing project by LEWIS INFRASTRUCTURE AND PROJECTS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/191116/003007 on 16 Nov 2019. Possession is promised by 22 Jan 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NamePROVIDENCE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/191116/003007
  • ReraGenie IDRG-KA-97796

Builder

  • NameLEWIS INFRASTRUCTURE AND PROJECTS
  • Entity typePartnership Firm
  • Authorized SignatorySANTOSH GLEN LEWIS
  • Other registrations8 more →
  • Declared earlier projects12 →

Key dates

this monthRegisteredNov 2019First promiseApr 2021Revised toJan 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Nov 2019
  • Promised completion22 Jan 2022
  • Revised completionRevised to 22 Jan 2022 (originally 22 Apr 2021)
  • Buildings1 building record
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PROVIDENCE---808

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities31

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area590 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLEAH MARIA LEVILLARD
EngineerU VENKATESH

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionApr 2021 → Jan 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed35

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/191116/003007 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: FORM D-Lewis Infrastructure and Projects.pdf-
Plan Sanction Letter cum License-
Sale agreement DRAFT-Providence-
SAle Deed-
Providence Sanction Plan-
Providence Sanction Plan-
Specification-
Providence EC-
Affidavit Form 3-1-
Joint Affidavit cum Declaration-
Providence Khatha-
JDA PROVIDENCE-
Will copy-
Unnamed document-
PROVIDENCE Sectional Drawing-
Balance Sheet 2017 - 2018File: Balance Sheet-FY 17-18.pdf-
Balance Sheet 2016 - 2017File: Audited Balance Sheet FY 2016-17.pdf-
Balance Sheet 2015 - 2016File: Audited Balance Sheet FY 2015-16.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Profit and Loss FY 17-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Audited Balance Sheet FY 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Audited Balance Sheet FY 2015-16.pdf-
Auditor's Report 2017 - 2018File: Auditor Report-FY-17-18.pdf-
Auditor's Report 2016 - 2017File: Auditor Report 2016-17.pdf-
Auditor's Report 2015 - 2016File: Auditor Report 15-16.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR V-FY 17-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR V AY 2017-18.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR V AY 2016-17.pdf-
Form B-
Prospectus/BrochureFile: Providence Brochure.pdf-
Advertisement Copy 1File: Providence Advertisement.pdf-
Tower Excel SheetFile: PRMKARERA1251309PR191116003007 (5).xlsx-
Occupancy CertificateFile: ilovepdf_merged (38).pdf-
Completion certificate issued by the competent authorityFile: ilovepdf_merged (38).pdf-
Registered Agreement of SaleFile: ilovepdf_merged (38).pdf-
Registered conveyance deed for an individual unitFile: ilovepdf_merged (38).pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep PROVIDENCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: LEWIS INFRASTRUCTURE AND PROJECTS

LEWIS INFRASTRUCTURE AND PROJECTS has 9 registrations on RERA Karnataka, including FERRIS and RAINTREE. Its filings declare 12 earlier projects, 10 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if PROVIDENCE is delayed beyond 22 Jan 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PROVIDENCE?

The registered promoter entity is LEWIS INFRASTRUCTURE AND PROJECTS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PROVIDENCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PROVIDENCE?

The professionals named in the filing: Architect: LEAH MARIA LEVILLARD; Engineer: U VENKATESH. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PROVIDENCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PROVIDENCE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PROVIDENCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.