Registration lapsed No litigation declared Residential / Group Housing project

PRITY CHSL

By BHAVANJI SHANKARLAL BHADRA

RG-MH-50759 · RERA P51800034941 · Last updated on MahaRERA portal: 11 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
7 of 11Construction stages donefurthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

PRITY CHSL is a Residential / Group Housing project by BHAVANJI SHANKARLAL BHADRA in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034941 on 28 Apr 2022. Possession was promised by 31 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NamePRITY CHSL
  • TypeResidential / Group Housing
  • Location
    • R.N.NARKAR ROAD
    • GHATKOPAR EAST
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • RERA no.P51800034941
  • ReraGenie IDRG-MH-50759

Builder

  • NameBHAVANJI SHANKARLAL BHADRA
  • Entity typeIndividual

Key dates

22 months past promisethis monthRegisteredApr 2022PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRITY CHSLNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

PRITY CHSL: 86% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 11 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered42

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area651 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PRITY CHSLMumbai CityMumbai City

Approvals and building plan

Permissible FSI2110.04
Proposed, not sanctioned2,110 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRATNADEEP, BHAVESWAR MARG OFF MG ROAD, GHATKOPAR EAST, MUMBAI -400077

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKIRITKUMAR SHAH
EngineerSHRAVANI CONSULTANT
Chartered AccountantJAYESH SHETH & CO
PartnerRole in project
BHAVANJI SHANKARLAL BHADRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Jun 2025

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: FORM B.pdf11 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Prity Occupation certificate.pdf11 Jun 2025
Declaration in FORM BFile: FORM B.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Q3.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificte Bhavanji Bhadra (1).pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Q3.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory Q3.pdf22 Jan 2025
Declaration about Commencement CertificateFile: CC Declaration.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 (1).pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificte.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory (2).pdf24 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2 a priti.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: priti invemtory.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certifcate.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Bhavanji Bhadra.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Bhavanji Bhadra (1).pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificte Bhavanji Bhadra_11zon.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate Bhavanji Bhadra.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Bhavanji Bhadra_compressed.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificte Bhavanji Bhadra (1).pdf16 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report CA.pdf30 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2379670_FurtherCC_signed.pdf18 Jan 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate Bhavanji Bhadra.pdf18 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-Priti.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineeer Certificate- Priti.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Priti Q2 2023-24-compressed-compressed-1.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA prity.pdf21 Apr 2023
Disclosure of sold/ booked inventoryFile: sold unsold letter.pdf20 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: cc declaration.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect PRITI.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer PRITI (1).pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: site supervisor PRITI.pdf19 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A for Bhavanji S Bhadra Qtr 3 2022-23.pdf19 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: sold unsold letter.pdf19 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bhavanji rera bank letter.pdf19 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: further cc 1.pdf23 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: further cc 2.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificatE.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate priti q2.pdf20 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf20 Oct 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca certificate priti.pdf20 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SIGNED.pdf16 Jul 2022
Declaration about Commencement CertificateFile: CC DECL.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD.pdf7 Jul 2022
CERSAI detailsFile: PRITY CHSL CERSAI.pdf18 Apr 2022
Copy of the legal title reportFile: TITLE COMPRESSED.pdf12 Apr 2022
Building plan approvalFile: IOD PLAN 02.pdf11 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD PLAN 02.pdf11 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca_compressed.pdf11 Apr 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf11 Apr 2022
Proforma of Allotment letterFile: PRITI SALE Agreement.pdf11 Apr 2022
Layout approvalFile: IOD PLAN 01.pdf8 Apr 2022
Building plan approvalFile: IOD.pdf8 Apr 2022
PAN CardFile: PAN CARD.pdf8 Apr 2022
Details of encumbrancesFile: No encumberance.pdf8 Apr 2022
Copy of Layout Approval (in case of layout)File: IOD PLAN 01.pdf8 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Apr 2022
Declaration about Commencement CertificateFile: FORM D - DECLARATION.pdf8 Apr 2022
Declaration in FORM BFile: FORM B - DEVELOPER.pdf8 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect.pdf8 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf8 Apr 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRITY CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

Builder: BHAVANJI SHANKARLAL BHADRA

BHAVANJI SHANKARLAL BHADRA has 1 registration on MahaRERA, including PRITY CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that PRITY CHSL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRITY CHSL is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRITY CHSL?

The registered promoter entity is BHAVANJI SHANKARLAL BHADRA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRITY CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRITY CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRITY CHSL?

The professionals named in the filing: Architect: KIRITKUMAR SHAH; Engineer: SHRAVANI CONSULTANT; Chartered Accountant: JAYESH SHETH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRITY CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRITY CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRITY CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.